Loading...
ENG2021-0275 APPROVED SEWER PERMITPERMIT PERMIT NUMBER City of Edmonds AveSEWER N, Edmonds WA 98020ENG2021-0275 www.cityofedmonds.gov Description: INSTALL 103' OF 4" PERMALINER ISSUED: 07/27/2021 Address: 7900 200TH ST SW EDMONDS WA 98026-6835 EXPIRES: 10/27/2021 Permit Subtype: PARTIAL LINE Permit Type: SEWER Parcel Number: 00407700400802 REPLACEMENT CONTACTS NAME TYPE NAME ADDRESS PHONE APPLICANT AIRS RESCUE ROOTER 175 ROY ROAD, PACIFIC WA 98047 (253)872-6944 CONTRACTOR ARS RESCUE ROOTER 175 ROY ROAD, PACIFIC WA 98047 (253)872-6944 OWNER KAISER -BROWN LANE J 7900 200TH ST SW, EDMONDS WA 98026-6835 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 SIDE SEWER PERMIT - PARTIAL REPLACEMENT $110.00 $110.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 07/27/2021 RELEASED BY DATE Printed: Tuesday, July 27, 2021 7:56:41 AM 1 of 2 SEWER PERMIT PERMIT NUMBER City of • • • •:• •ENG2021-0275 www.cityofedmonds.gov• • CONDITIONS CONDITION TYPE The subject permit does not provide authorization to perform work within the City ROW. All work under this permit is limited to private property. DAMAGE TO FRONTAGE IMPROVEMENTS It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in City right of Ways or Easements to City Standards caused by or occurring during the permitted project. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Call for all required inspections. All work shall be inspected prior to backfill. INSP PRIOR TO BACKFILL If open trench occurs at property line, a 6" sewer cleanout shall be installed consistent with City of Edmonds standard details. Owner/Contractor to provide Side Sewer asbuilt at final inspection. See City Handout E71 for SEWER ASBUILT requirements. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. WATER AND SEWER Maintain 10' of separation between the sanitary side sewer and the water service line. SEPARATION • PECTION TYPE 7SIDE DATE RESULT NOTES r ir COMPLETE R X-2 ENGINEERING FINAL" E-2 TV AND WATER TEST E-9 SEWER ASBUILT Printed: Tuesday, July 27, 2021 7:56:41 AM 2 of 2 SIDE SEWER PERMIT APPLICATION CONTRACTOR INFORMATION: Company Name:Ale'�' �0-eSWe, )CDL>r k2- Site Contact: j��Oh k�>e#-&\/O Company Address: 11 1/> S C Phone #: C2 �c,� Z (Do[ 4 City: YRCA G Zap: Email #: C,3 No�ZV @ a r F. CO m State License # NAGS �� o--1Q- l City Business License # Expiration Date: I I 1 12 O-Z 2- PROPERTY INFORMATION: Address: —I q 00 2-0U*-1 St S�IJ eolrv) OnAls, VV Pr 9bo2 (.p Owner's Name: Phone #: /2-0(,0) ❑ FULL LINE REPLACEMENT ❑ SPOT REPAIR ❑ PIPE BURST RELINE (PERMALINE ONLY) DESCRIPTION OF PROPOSED WORK (Be Specific): W %Vnv �, e C ontc er,� tv v S t un SUS, 03 ' o 14" ISSUANCE OF THIS PERMIT DOES NOT CONSTITUTE PERMISSION TO WORK ON ANY PROPERTY OTHER THAN THAT OWNED BY THE SUBJECT PROPERTY OWNER. CERTIFICATIONS NECESSARY FOR INSTALLATION METHODS ARE THE RESPONSIBILITY OF THE CONTRACTOR PERFORMING SAID WORK. I REPRESENT AND WARRANT TO THE CITY OF EDMONDS, IF REPAIR OF EXISTING SEWER EXTENDS TO AN ADJACENT PROPERTY, I HAVE OWNERS EXPRESS PERMISSION TO PERFORM WORK ON THAT ADJACENT PROPERTY. SIGNATURE bbtrA/kfljDATE Contractor or gent NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE