Loading...
ROW PERMIT APPLICATIONENG2021-0242 ofEOM°"ems RECEIVED RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION J U N 30 2021 Complete and submit this Application in accordance with the Submitta: i?ao Requirements outlined in Right -of -Way permit Handout E6�. CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A' instead of lea-rinor hlanlr= All fields required. Incomplete Applications will be denied. SECTION A General • Project Name Comcast Job # 759215 Site Address or if no site address use Property Address at NW corner of project area: 24219104th Ave W Edmonds, WA 98020-5781 Associated Permits: BLD PLN ENG Owner and Entity Holding Name of Company Comcast Cable Communications Franchise Ordinance No: 759215 Point of Contact Jourden Lawrence Tide Comcast Area Coordinator Address 1525 75th ST SW Suite # 200 City Everett State WA Zip 98203 Phone 425-967-1158 Email Jourden_Lawrence@comcast.com Contractor and Authorized Agent of Owner (see note below) Name of Company Spectra Broadband Inc // Netvision Inc Contractor Contacts During Construction Primary Name Adolfo Loza Agent Name Maribel Gonzalez Torres Title NV Field Supervisor Title Drop Bury Adminstrative Mobile 425-599-85o8 Address 3527121st SW Email City Lynnwood State WA Zip 98o87 Secondary Name Marissa Sena Phone 425-353-2078 Title Spectra Drop Bury Administrative Email Maribel@netvisionunderground.com Mobile 801-512-3471 City of Edmonds Business License No: 603-499-411 Email Marissa.sena@spectranow.com State License No: CC NETVII*849MA Spectra Broadband Inc ® Contractor verifies it is currently bonded ® Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as welt ❑ Traffic Control Only (no associated development) ® Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) We will be installing a 2inch conduit to install Comcast to corner of property 24219. Starting from the pole located in between houses 24203 and 24211, we will bore 144ft south crossing under gravel driveway for house 24211 to place a new flushmount carson box. Then we will bore 20ft east crossing under 104th AVE W to place a second new flushmount carson box on property line for house 24219. We will then continue within private property. We will maintain the appropriate clearance for all utilities, 5ft horizontal clearance from utility appurtenances and 2ft vertical clearance from all substructures. All new substructure to have 36" cover. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF I x LF SF Alley 72 hours + LF Ix I LF SF Parking 72 hours + LF Ix I LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ® telecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes No 2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? 5. Does the work involve proposed additions to an aboveground utility stem? If es: Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: How many are existing? I I How many are to be added? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: If "tom' Z-1 DATE: 6/30/2021 APPLICANT PRINTED NAME: Maribel Gonzalez Torres APPLICANT TITLE: NV Drop Bury Admin. NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 759215 124219 104th Ave W Edmonds, WA 98020-5781 Bore/Drill New UG = 164' Trench New UG = New OH = Overlash = Existing UG = Riser = New Building Interior= New Building Exterior = TOTAL ROW FOOTAGE 164� CONTACTS: Spectra Area Manager Cole Ramirez (503)577-0501 Netvision Office Admin Marlbel Gonzalez (425)353-2078 On -Site Contact Fredy Munoz(425)314-8827 LEGEND Tie in Point Bore Path in Right of Way New Flush Mount Carson Asphalt/Concrete Cut 2NfSl � � o u �� Z4a19 N LAIIJUS 4 Ila 9/��►7 ?p � '44.8 G� (ON fst AU-- v 00 _A .� c.Uilel. S�f� ZLf 03 ✓ 24 2� I 2N z l a VER SHEET DATE: BV: REASON: REVISION DESCRIPTIONS 6/29/2021 Netvision Inc DROP BURY We will be installing a 2inch conduit to install Comcast to corner of property 24219. Starting from the pole located in between ■II I� houses 24203 and 24211, we will bore 144ft south crossing under gravel driveway for house 24211 to place a new flushmount m ca st, nr ,rrIIr carson box. Then we will bore 20ft east crossing under 104th AVE W to place a second new flushmount carson box on property Co �I 1 line for house 24219. We will then continue within private property. We will maintain the appropriate clearance for all utilities, III�ImIYN� Sft horizontal clearance from utility appurtenances and 2ft vertical clearance from all substructures. All new substructure to have 36" cover. a 1 • • • • • • •40 • Cn3 w * • °?y • 24211 r • 3-21 • ® sE M aC 0 •4 0 • • •N • j? • • • • -•- _- • • e • • • • • • 40• • • • r • C�CffCMONNs • m • • • • • • • • �+ • e to 13-6 ' • • • FLUSH • • p� ��VLI�I MLNI • 7�NIEW OUNT hN h IlhhyyppNN pp • 247.1 • • ARSON � • 1 —.__ NEW FLUSH � w ,1`III`1V`i91 1V` ;'?, • 'BORE PATH FOR 164' OF CONDUIT IN RIGHT OF • • I MOUNT • • WAY CARSON • _�� 'TO MAINTAIN 5 FEET HORIZONTAL CLEARANCE • _----- 1 625 �' • i`a • • FROM UTILITY APPURTENANCES AND 2 FEET • VERTICAL CLEARANCE FROM ALL • TIE IN r;: - �`' ® �' • i'� SUBSTRUCTURE pl • I � "ALL NEW SUBSTRUCTURE TO HAVE 36" COVER. � ® �- ` +$ � •/ • \ ' • + • • d` 5 • • ® • • �_ IVATE 33 01 24225 - 0 • • o • • dy • 1 S`' 761 • ;'' • w • • • • • 1 3-369 • • • ��/ •` • e • • • s • • l^a� w �s Overview Map Comcast p 759215 24219104th Ave Edmonds, WA 98020-5781 KEY: ATIE IN P PROPOSED ROUTE iARSON Q TIE IN POINT ®OGRE PIT Q We will be installing a 2inch conduit to install Comcast to corner of property 24219. Starting <N> from the pole located in between houses 24203 and 24211, we will bore 144ft south crossing WATER under gravel driveway for house 24211 to place a new flushmount carson box. Then we will SEWER � POWERbore 20ft east crossing under 104th AVE W to place a second new flushmount carson box on property line for house 24219. We will then continue within private property. We will maintain the appropriate clearance for all utilities, 5ft horizontal clearance from utility appurtenances and 2ft vertical clearance from all substructures. All new substructure to have 36" cover. STORM SIGN SPACING - X (1) RURAL ROADS & URBAN ARTERIALS 35 f40 UP14 357* RURAL ROADS. URBAN ARTERIALS. 25 f 30 MPH 2D0'i (2) RESIDENTIAL & WJSNE53 DISTRKTS URBAN SIRB-TS 25 MPH OR LESS Wt (!)ALL SPAGNG MAY Be ADJUSTEO TO A=OMMODATE INTERSECOONS AND DRNEWAYS, (2) THIS SPACING MAY M REDUCED IN URBAN AREAS TO PR ROADWAY CANDMONS. WNIMUM SHOULDER TAPER LENGTH = L13 (feel) sHWLDER 1MDTN Posted Speed (mph) 25 30 ;5 40 45 50 55 ai0 65 TO e` 40 40 6D 90 1(y 40 60 90 90 USE A 3 DEVICES TAPER FOR SNOULDERS LESS THEN C p q x Oar ROAD SHOULDER WDRK WDRK AHEAD 4S W200.1 W21-5 e e e e BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 1 25 1 30 1 35 1 40 1 45 1 50 1 55 1 60 1 b5 70 LENGTH {feeQ 155 200 250 305 1 360 425 495 570 595 73p TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT 9.900 TO 22000 lbs. HOST VEHICLEI WEIGHT > 4 4$ MPH 45-55 MPH > 55 MPH � 45 MPH 45-55 MPH a 55 MPH lov 123' 17Z 74 100' 157 PROTECTIVE VEHICLE (WORK VEHICLE) = R NO SPECIFIED DISTANCE REQUIRED CHANNEUZATION DEVICE SPACING feet MPH TAPER ITANGEM wo 3D 6D 254 2D 40 RECEIVED J U N 30 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT NOTES LEGEND 1. a TEMPORARY SIGN LOCAMN SHOULDER CLOSURE -LOW SPEED I DEVICE SPACING FOR THE GRANGE. EPd) TAPER SHALL BE ?D (r n. 2 ALL SIGNS ARE BLACK ON ORANGE T�IT]- CHANNELRLNG DE ACES (40 MPH OR LESS) PROTECTS mime NOT TO SCALE FILE NAM 5-.WnhM R P6 �ttnmrd*Mftn Sleet L9bM holed PSUgtl Ylerk Zw TMM9 Sh.WrLax 9 irP OrloapTGSden Tm I:SWAI PM ^q' eti1t rRD" PROXNO. DATE roams TC5 PLOTTED BY nddW DESSNED BY Washington State vsrerta) eY o, a¢a® In�snm«n DepaRrrlerd of Trartsporiation PROSI3VGR. ma ae TRAFFIC CONTROL PLAN REOWNAL AM REVISION DATE 6Y