Loading...
ENG-COMMENTSUMMARY_STORM1ENG-COMMENTSUMMARY STORM1 Markup i Page Ind... Comments Civil Plans 2 SW-C2.1-1: Protect/fence perforated pipe connection area (if remaining) 4 (7) SW-C3.1-6: Add hard surfaces table list the total SF of each type of surface, 4 including existing surfaces to considered for retrofit mitigation, and the BMP treating each surface SW-C3.1-7: See comment in drainage report regarding feasibility of perforated pipe 4 connection. SW-C3.1-1: Update or add details to include information need for construction of 4 the under drain system including sub grade sloping (if any) and geotechnical fabric as needed to remain consistent with geotechnical recommendations (generally recommend tight lining all drainage) SW-C3.1-2: Detail/provide more information of utility crossing elevations- SW-C3.1-3: Detail side penetration/boot, or relocated to manhole. SW-C3.1-4: Add reference to the detail on sheet C3.2 SW-C3.1-5: Add note to provide (or restore as needed) splash pad/quarry rock; list y. 4 4 4 4 invert elevation 5 (1) 5 SW-3.2-1: Adjust to top of detention pipe, this is only detaining 30" (not 36" as calculated) Drainage Report 14 SW1-1: It appears the perforated pipe connection is within 50' of a landslide hazard area and is therefore infeasible; expand or address as needed. If remaining, also address how this aligns with the geotechnical recommendations (generally summarized and as drainage should be tight -lined)