Loading...
Building Permit 2020TAINING WALL Permit PERMIT NUM City of Edmonds www.edmondswa.gov Type: RETAINING WALL Owner/ Business: SZABOLCS PASZTOR Status: ISSUED Subtype: RESIDENTIAL RW Site Address: 16216 INMEADOWDALE RD EDMONDS,WA 98026- Parcel No: 00649500001000 Applied: 5/11/2020 4928 Subdivision: 006495, 005131 Lot: 0 Issued: 10/27/2020 Fire Sprinklers: Lot Area: Zoning: RS-12 Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 4/27/2021 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: WAC Scope of Work: RETAINING WALL WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT SZABOLCS PASZTOR 1216 114TH AVE SE, BELLEVUE (425)367-9318 SPASZTOR@GOLDSMITHENGINEERIN WA 98004 G.COM CONTACT BUEHLER HOLDINGS LLC 20516 80TH AVE W, EDMONDS (206)434-8716 kely@midnightwindowtinting.com WA 98026 CONTRACTOR CONTRACTOR UNKNOWN OWNER BUEHLER HOLDINGS LLC 20516 80TH AVE W., EDMONDS (206)434-8716 WA 98026 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 5/21/20 R5411 PER PERMIT RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 5/21/20 R5411 RETAINING WALL - SUB RES BLDG 001.000.322.10.000.00 $100.00 $100.00 5/21/20 R5411 PERMIT FEE RETAINING WALL - SUB RES BLDG 001.000.345.83.000.00 $50.00 $50.00 5/21/20 R5411 PLAN REVIEW FEE RETAINING WALL - SUB RES ENG 001.000.341.82.000.00 $100.00 $100.00 5/21/20 R5411 INSP FEE RETAINING WALL - SUB RES ENG 001.000.341.82.000.00 $50.00 $50.00 5/21/20 R5411 REVIEW FEE TOTALS: $346.50 $346.50 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Tuesday, October 27, 2020 9:48:58 AM 1 of 3 WALL Permit PERMIT NUM City of Edmonds F7 EdmondsTAINING ••• i 1 1 1 41 • JILwww.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. Contractor/Owner shall be responsible for repair/replacement of all damage to utilities DAMAGE TO FRONTAGE FOR and/or frontage improvements in city right of way per city standards that is caused by or IMPROVEMENTS INFORMATION occurs during the permitted project. ESC REQUIRED FOR Maintain erosion & sediment control per city standards. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. Recorded critical area notice to title required prior to final inspection. Applicant has FOR materials - can record with County Auditor themselves or have City record for an PLANNING CONDITION INFORMATION additional fee. FOR Received - AFN 202010010748 INFORMATION Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:OOam to 6:OOpm on weekdays and 10:00am to 6:OOpm on Saturdays, excluding Sundays SOUND OR NOISE INFORMATION and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Special inspections have been called for on this project and are noted on the approved SPECIAL INSPECTION BUILDING FOR construction plans. It is the owner and or contractors responsibility to ensure that reports DIVISION INFORMATION are provided to the City on a weekly basis. UNDERGROUND UTILITY FOR Call for locates of underground utilities prior to any excavation. LOCATES INFORMATION INSPECTIONS - Schedule Online at: https://Inspection.MvBuildingPermit.com COMPLETED SEQID INSPECTION TYPE INSPECTOR RESULT DATE Printed: Tuesday, October 27, 2020 9:48:58 AM 2 of 3 RETAINING WALL Permit PERMIT NUMBER OF City of Edmonds 121 5th Ave N, Edmonds WA 98020 BLD2020-0479 www.edmondswa.gov / 425.771.0220 i ■INSPECTION - : OTHER INSPX-3 - BUILDING FINAL" A-1 TESC AND MOBILIZE X-2 ENGINEERING FINAL X-1 PLANNING FINAL Printed: Tuesday, October 27, 2020 9:48:58 AM 3 of 3