Building Permit 2020TAINING WALL Permit
PERMIT NUM
City of Edmonds
www.edmondswa.gov
Type: RETAINING WALL
Owner/ Business: SZABOLCS PASZTOR
Status: ISSUED
Subtype: RESIDENTIAL RW
Site Address: 16216 INMEADOWDALE RD EDMONDS,WA 98026-
Parcel No: 00649500001000
Applied: 5/11/2020
4928
Subdivision: 006495, 005131
Lot: 0
Issued: 10/27/2020
Fire Sprinklers: Lot
Area: Zoning: RS-12
Final:
Valuation: $0.00 Occupancy Type: Construction Type:
Expiration Date: 4/27/2021
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Issued by: WAC
Scope of Work: RETAINING WALL
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
SZABOLCS PASZTOR
1216 114TH AVE SE, BELLEVUE
(425)367-9318
SPASZTOR@GOLDSMITHENGINEERIN
WA 98004
G.COM
CONTACT
BUEHLER HOLDINGS LLC
20516 80TH AVE W, EDMONDS
(206)434-8716
kely@midnightwindowtinting.com
WA 98026
CONTRACTOR
CONTRACTOR UNKNOWN
OWNER
BUEHLER HOLDINGS LLC
20516 80TH AVE W., EDMONDS
(206)434-8716
WA 98026
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE RECEIPT#
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
5/21/20
R5411
PER PERMIT
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
5/21/20
R5411
RETAINING WALL - SUB RES BLDG
001.000.322.10.000.00
$100.00
$100.00
5/21/20
R5411
PERMIT FEE
RETAINING WALL - SUB RES BLDG
001.000.345.83.000.00
$50.00
$50.00
5/21/20
R5411
PLAN REVIEW FEE
RETAINING WALL - SUB RES ENG
001.000.341.82.000.00
$100.00
$100.00
5/21/20
R5411
INSP FEE
RETAINING WALL - SUB RES ENG
001.000.341.82.000.00
$50.00
$50.00
5/21/20
R5411
REVIEW FEE
TOTALS: $346.50 $346.50
CONDITIONS
CONDITION TYPE
STATUS NOTES
Printed: Tuesday, October 27, 2020 9:48:58 AM 1 of 3
WALL Permit
PERMIT NUM
City of Edmonds
F7
EdmondsTAINING
••• i 1 1 1
41
• JILwww.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
ALL BUILDING PERMITS
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections.
Contractor/Owner shall be responsible for repair/replacement of all damage to utilities
DAMAGE TO FRONTAGE
FOR
and/or frontage improvements in city right of way per city standards that is caused by or
IMPROVEMENTS
INFORMATION
occurs during the permitted project.
ESC REQUIRED
FOR
Maintain erosion & sediment control per city standards.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
Recorded critical area notice to title required prior to final inspection. Applicant has
FOR
materials - can record with County Auditor themselves or have City record for an
PLANNING CONDITION
INFORMATION
additional fee.
FOR
Received - AFN 202010010748
INFORMATION
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:OOam to 6:OOpm on weekdays and 10:00am to 6:OOpm on Saturdays, excluding Sundays
SOUND OR NOISE
INFORMATION
and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
UNDERGROUND UTILITY
FOR
Call for locates of underground utilities prior to any excavation.
LOCATES
INFORMATION
INSPECTIONS - Schedule Online at: https://Inspection.MvBuildingPermit.com
COMPLETED
SEQID INSPECTION TYPE INSPECTOR RESULT
DATE
Printed: Tuesday, October 27, 2020 9:48:58 AM 2 of 3
RETAINING WALL Permit
PERMIT NUMBER
OF City of Edmonds
121 5th Ave N, Edmonds WA 98020 BLD2020-0479
www.edmondswa.gov / 425.771.0220
i
■INSPECTION
-
: OTHER INSPX-3
-
BUILDING FINAL"
A-1 TESC AND MOBILIZE
X-2 ENGINEERING FINAL
X-1 PLANNING FINAL
Printed: Tuesday, October 27, 2020 9:48:58 AM 3 of 3