Loading...
Building Permit 2020'S IDENTIAL BLDG Permit PERMIT NUM City of Edmonds 121 5th Ave N, Edmonds WA 98020 BLD2020-0955 09 ww.edmondswa.gov Type: RESIDENTIAL BLDG Owner/ Business: BLAKE FISHER Status: ISSUED Subtype: ALTERATION OR REMODEL Parcel No: 27031300406300 Site Address: 1615 9TH AVE N EDMONDS,WA 98020-2628 Applied: 9/14/2020 Subdivision: SP S-98-34, FRUITDALE ON THE SOUND (UNRECORDED) Lot: 0 Issued: 11/5/2020 Fire Sprinklers: Lot Area: 13,504 Zoning: RS-12 Final: Valuation: $500,000.00 Occupancy Type: Construction Type: Expiration Date: 11/5/2021 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: AKERS- REMODEL (MAJOR) DECK WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT BLAKE FISHER 330 DAYTON STREET SUITE 6, (206)852-5054 BLAKE@BLAKEFISHERARCHITECTURE. EDMONDS WA 98020 COM CONTACT BLAKE FISHER ARCHITECTURE 330 DAYTON STREET SUITE 6, (206)852-5054 blake@blakefisherarchitecture.com & DESIGN LLC EDMONDS WA 98020 CONTRACTOR SCOTT DELAP 3517 95TH PL SE, EVERETT WA (206)466-9972 scottdelapconstruction@comcast.net CONSTRUCTION INC 98208 1615 9TH AVE N, EDMONDS WA OWNER WILLIAM AKERS 509.868.2562 98020-2628 •' • DESCRIPTION 7,BAsE ACCOUNT AMOUNT PAID PAID DATE RECEIPT # FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 11/5/20 R8441 PERMITS 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 11/5/20 R8441 PERMITS APPLIANCE VENTS 001.000.322.10.000.00 $30.00 $30.00 11/5/20 R8441 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 11/5/20 R8441 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $165.00 $165.00 11/5/20 R8441 TRAP ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $110.00 $110.00 11/5/20 R8441 FAN CONNECTED TO SINGLE DUCT 001.000.322.10.000.00 $45.00 $45.00 11/5/20 R8441 PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $3,500.00 $3,500.00 11/5/20 R8441 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $2,975.00 $2,975.00 9/17/20 R7649 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 11/5/20 R8441 TOTALS: $6,971.50 $6,971.50 7 CONDITION TYPE STATUS NOTES Printed: Thursday, November 05, 2020 12:43:54 PM 1 of 3 'SIDENTIAL BLDG Permit PERMIT NUM City of Edmonds 2020 955 -. •. • JIL 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. CARBON MONOXIDE SYSTEMS FOR INFORMATION The construction project involves demolition of a significant portion of the existing structure. Structures that are demolished to the level that meets or exceeds 75% of the replacement cost of the structure will not be allowed by city code to be rebuilt except to DEMOLITION REQUIREMENTS FOR full -on standards for new construction. Reference Edmonds Community Development INFORMATION Code section 17.40.020(F). Demolition of portions of the structure is limited to that clearly shown on the approved permit plans, and will be verified by the building inspector. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION provide manufactures installation instructions on site for Building Inspector. Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspections to verify. These MAXIMUM HEIGHT FOR items must be consistent with the approved plan. If the proposed height of a building is INFORMATION within 12 inches of the maximum height permitted for the zone an elevation survey is required. REQUIRED SPECIAL FOR INSPECTIONS INFORMATION Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays SOUND OR NOISE INFORMATION and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • -. • • ZMIWCIlm•'- • COMPLETED SEQID INSPECTION TYPE INSPECTOR RESULT NOTES DATE A-1 BUILDING PRECON Printed: Thursday, November 05, 2020 12:43:54 PM 2 of 3 'SIDENTIAL BLDG Permit City of • • • PERMITNUM -•:� i 1 1 1 •55 wm . •. li7iJdhL OiL B-3 EXT WALL SHEATHING B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 PLUMB ROUGH IN B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-4 DRYWALL FASTENING B-4 FRAMING B-4 SHOWER PAN B-5 BLDG SPECIAL INSPECTION B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" B-2 DEMO AMT VERIFICATION X-2 ENGINEERING FINAL Printed: Thursday, November 05, 2020 12:43:54 PM 3 of 3