Loading...
APPROVED BLD PLN - BLD2021-0002+Architectural_Plan+1.29.2021_11.19.54_AM+2020663All ledgers, joists, and rims will be 2x10 pressure treated Hem -Fir wood FRAMM AND FOUNDAT ON PLAN 26'-0" Ej 19'-0'' 14'-0" � � 1 18"DIA x L"D Footing ffypica 8'-6' 1 3'-0' x 4' 0" E pose 10' 0" StairLanding B low ck 1 1 1 1 / 1 72"x80" Sliding Door light Exterior Wall of Hour-o 96"x42" Double Sliding Window 34" Above Deck SULface See Figures R507.2.1(1) and R507.2.1(2) on page 4 of 5 for ledger connection details 0 APPROVED BY PLANNING av (ro Feb 01 2021 APPROVED PLANS MUST BE ON JOB SITE N ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE APPROVED BY CITY OF EDMONDS BUILDING DIVISION Feb 01 2021 City Of Edmonds Building Department --------------------- -DECK -------------- Work ; (------------ Address; 7504 236TH ST SW ----------------------------------------- Owner MACAULEY ---------------------------------- �----------------- --- Approved Date 2/02/2021 Building Official D07U vszst W. x cam Permit Number, BLD2021-0002 / 1 All framing material for the deck will be pressure treated Hem -Fir wood. / The posts will be 4x4s, the deck beams will be 4x12s, the stair landing beams will be 4x8s, and the ledger joists and rim will be 2x10s according to the SBCc R507.5 joist span table and R507.6 beam span table Siding will be removed and a 2x10 ledger board will be bolted to the house and properly flashed. The joists will he nailed into exterior grade metal hangers set on 16 inch centers on the ledger board. 9 -8 12'-0" Material for the decking will be 1x6 composite r. . .I Hardware and fasteners in contact with preservative -treated wood shall be of hot -dipped zinc galvanized steel, stainless steel, silicon bronze or copper. Blocking at mid -span I In the absence of manufacturer's g P recommendations a minimum of ASTM A 653 of joists alternating I type G185 zinc -coated galvanized steel, or sides for fastener equivalent, shall be used. access IRC R317.3.1 IBC 2304.10.5.1 �.�. ..................� RESUB Jan 29 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Page 1 of 5 EESAT OS V EW - WEST SUE .�- (Typical) Stair stringer bottoms to be fastened knee brace details 1 18"DIA to a pressure treated 2x4 which is anchored in the concrete pad with See Figure 1 on page 4 of 5 for 3/8" x 3" screws. All fasteners are post -pier connector detail hot -dipped galvanized steel. RESUB Jan 29 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Page 2 of 5 EEEVAT ON V EW - SOUTH SCE e e t I ypludlf - I iyui u u ui i J auu . ui . w1 18 " D A knee brace details Figure 3 on page 4 for post -beam nector detail RESUB Jan 29 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT See Figure 1 on page 4 of 5 for post -pier connector detail Page 3 of 5 Figure 1 Post -Pier Connector Figure 3 Post -Beam Connector Typical Construction Connectors Part 1 Figure 2 Joist Hanger Figure 4 Stair Stringer Hanger for Both Upper and Lower Connections - To be Bent to Appropriate Angles S` 2' MIN_ LEDGER 2 STAGGER FASTENERS i IN 2 ROWS 5,S* MIIN. FOR 2 X g* 'DISTANCE SHALL BE PERMITTED TO 8.5` MIN. FOR 2 X 10 BE REDUCED TO 4.5- IF LAG SCREWS l_$' MIN. FOR 2 X 12 ARE USED OR BOLT SPACING IS REDUCED TO THAT OF LAG SCREWS TO ATTACH 2 X S LEDGERS TO 2 X B BAND JOISTS. LAG SCREW OR BOLT 314" MIN. For SI: 1 inch = 25.4 mm. FIGURE R507.2.1('I)PLACEMENT OF LAG SCREWS AND BOLTS IN LEDGERS NOTE: THIS DETAIL ISAPPL WHERE FLOOR JOIS PARALLEL TO DECK 2- MIN. FLOOR JC Ledger Connection 1 - (2x10) On -center spacing of fasteners shall be 13" SHEATHING SIDING FLASHING FOR WATER TIGHTNESS bECKING APPROVED JOIST HANGERS 2x LEDGER WITH FASTENERS IN ACCORDANCE WITH TABLE R547.2 HOLD-DOWN DEVICE MIN 750 LB. CAPACITY AT 4 LOCATIONS, EVENLY DISTRIBUTED ALONG DECK AND ONE WITHIN 24' OF EACH END OF THE LEDGER. HOLD-DOWN DEVICES SHALL FULLY ENGAGE DECK JOIST PER HOLD-DOWN MANUFACTURER. AFULLYTHREADED Ne DIAMETER LAG SCREW PREDRILLED W1 MIN. 3- PENETRATION TO CENTER OF TOP PLATE, STUDS_ OR HEADER. For SI; 1 inch = 25.4 mm. RESUB Jan 29 2021 FIGURE R607.2.1(2)PLACEMENT OF LAG SCREWS AND BOLTS IN BAND J01ST YOFEDMONDS DEVELOPMENT SERVICES Ledger Connection 2 - (2x10) DEPARTMENT Page 4 of 5 Typical Construction Connectors Part 2 Figure 6 Post -Beam Connection w/ Knee Brace - 28" Spacing RESUB Jan 29 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Page 5 of 5