Loading...
Geotech Letter-LandscapeAges Engineering P.O. Box 935 Puyallup, WA. 98371 Main (253)845-7MO A Geoteehnieal Engineering Services Company w W.agcs ngiuccring.wm February 17, 2021 Project No. 1479-2 Brett Buehler 20516 — 801h Avenue W. Edmonds, WA 98026 Subject: Driveway Construction Meadowdale Road Residential 16216 N. Meadowdale Road Edmonds, Washington Parcel Number: 00649500001000 Reference: 1. Preliminary Geotechnical Report, Meadowdale Road Residential, prepared by Ages Engineering, LLC, dated March 20, 2019. Dear Mr. Buehler, As requested, we are providing additional information for the subject site located at 16216 N. Meadowdale Road in Edmonds, Washington. The location of the site is shown on the Site Vicinity Map provided in Figure 1. We understand a new driveway with segmental block walls was constructed along the north side of the existing residence. Due to the site being located in an ECA zone, the driveway and walls should have been included in the plans for the recent retaining wall construction located along the east side of the existing residence on the site. Regardless, we visited the site to examine the new driveway and retaining walls to verify they were constructed in accordance with the City of Edmonds Municipal Code and Ages Engineering recommendations. DISCUSSION AND RECOMMENDAUtONS We visited the site on January 21. 2021 to view the existing site conditions. At the time of our site visit, the new driveway and segmental block walls were finished. The new driveway enters and exits from North Meadowdale Beach Road, creating a half circle driveway. The driveway is covered with crushed rock compacted into place. We observed segmental blocks walls had been constructed around the south side of the driveway, between the existing residence and the new driveway. The new walls face the new driveway and have a maximum total height of 2.0 feet (3 blocks). The wall blocks were also used to create a short staircase from the new driveway to the existing residence. We examined the area around and under the new development area and found the soils to consist of native sands and gravels with very little thin fills in places. All areas were firm and non -yielding and suitable for the new wall and driveway Mr_ Brett Buehler February 17, 2021 construction. Based on our evaluation, the new walls and driveway were constructed in accordance with the City of Edmonds Municipal Code and Ages Engineering recommendations. 4 We trust this information is sufficient for your current needs. If you have any questions, or require additional information, please call. Respectfully Submitted, Ages Engineering j 3e917 Bernard P. Knoll H Principal BPK/bpk Project Number A-1479-2