Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
SI AGREEMENT (SIGNED)
SPECIAL INSPECTION AND TESTING AGREEMENT Permit #: BLD2019-0935 Project: 16216 N. Meadowrtale Beach RD. Retaining Wall Prior try issuance of u permit, this form must be compkted in its ergt&ety and returned to the City for approva$ The completed form must have signatures of acknowledgment by ail parties. DUTIES AND RESP©NSISILTTMS &mW Inmg9jan Fir mW SPM41 bmworss^ The Special Inspection firm of Aggs Eng ngn,.Ying,.. . will perform special inspection for the following types of work (separate forms must be submitted if more than one firm is to he employed): ._,._Reinforced Concrete - _1lolting in Concrete _Prestressed Concrete —Shotcrete --Structural Masonry Structural SteelfWelding High Strength Bolting Spray applied Fireproofing --Smoke Control Systems _Lateral Wood _X, Soils Evaluation _X_ Retaining Wall Installation X_ Retaining Wall Drainage installation —Other All individual inspectors to be employed on this project will he WAHO certified for the type of work they are to inspect. If inspection is for work that is not covered by the WAHO categnt ies, or the inspector is not WAHO certified, a detailed resume of the inspector and firm must he submitted. The resume.must show that the inspector .and the iron are qualified by education and experience to perform the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda s1mets will not be used for inspection, unless they have been approved by the City. inspection itcords shall YYtef6de • A daily record to be maintained on site, iternizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. • A weakly report shall be submitted to the City; detailing the inspections and testing performed,, listing any nonconfortning work and resolution of nonconforming items. + A final report shall be submitted to the Building department prior to the Certificate of Occupancy being, issued. This report will indicate that. inspection and testing was completed in conformance with the LAH MI)I +rG DIVISION Fri FSiBtiUng Division C,ommmt Lettersle�ts _ Building Divisim revievnl20 35 special Inspeaie n Farm (IlnsigncdYdod01l6/Nl9 approved Plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. Cnata�tor "the contractor shad provide the spcc.ia# inspector or agency adequate notification of work re€ftui�rtg inspection. The City approved plan and specifications must be made available, at the jobsi.te for the use of the special inspector and the City inspector. The contractor shall ltlaintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the, City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. AWWMRWMdMML The building department shall review any revisions and addenda. The City inspector will monitor he special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work€ to proceed. Da Profesfunl: The architect amYor engineer will clearly indicate oa the plans and specifications the specific types of special inspection requited and shall include a schedule for inspection and testing. The arctdtect and/or engineer will coordinate their revision and addenda process in such a way as to ensure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. The project comer, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEAIENT A, failure of the special inspector or firm to perform in keeping with the requirements of the IRC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or frrin would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being pasted on the project until rionconforming items have been resolved. ACKNOWLEDGMENTS I have reA and agree to comply with the terms and conditions of this agreemetit. twner. Brett Buehler Signature 4vHate 10/26/2020 Contractor. 5i,gnature Date: Arch./Eng:�itsr=�` Special Insp. JP_/' rd tq k,WI �_ Special Insp. Agency! - E nf- i n L' LQ ACCE'PTEi3 FORTHE CITY O.F EDMONDS BUILDING DIVISION Date: tc> Date: L.-O Ar bWO DmiY1310N RLESiFiUMing Division Comment. m.cuc►ik omm=ti - hulloing Division miervsl2 9l 0935 Special Inspection Farm (tJrtsigncd),dm1G1160J9 Date: UFlIi1i,T3iNVJ I)r*lSfON F9,Mfluildiriz Di vig Gn Comment LMe3'S1Ummeft - Buil 119 Division.-vi-n\2019-093S Spe=iai InSpeCciou Farm (unsignC4)AM1011 CV2019