ENG2021-0249 ROW PERMITOF WAY EUC PERMIT
PERMITNUMBER,
City of Edmonds
EdmondsRIGHT
98020 1 1 .
www.cityofedmonds.gov
Description: COMCAST-TIE IN AT PED, PROOF AND PULL APPROX 30' CATV ISSUED: 08/03/2021
Address: 550 MAIN ST EDMONDS WA 98020-3183
EXPIRES: 02/03/2022
Permit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00434212001500
NAME TYPE NAME ADDRESS PHONE
APPLICANT COMCAST 1525 75TH ST SW, EVERETT WA 98203 (425)921-8201
CONTRACTOR Cablecom LLC 20021 120TH AVE NE, SUITE 101, BOTHELL WA 98011 (360)668-1300
OWNER SEATTLE-SNOHOMISH MILL 9525 AIRPORT WAY, SNOHOMISH WA 98296
COMPANY INC
INFORMFEE
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00
ENGINEERING INSPECTION FEE $110.00 $0.00
RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $0.00
•
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
77 INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
08/03/2021
RELEASED BY
DATE
Printed: Tuesday, August 03, 2021 12:06:10 PM 1 of 2
-KRWOF WAY EUC PERMIT
ER
City of • • •
www.cityofedmonds.gov• •
CONDITIONS
CONDITION TYPE
Easement and/or permission from adjacent property owner is required prior to entry or work within
ADJACENT PROPERTY
an adjacent property.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
Alert affected residents and/or businesses prior to work start.
Verify clear bore crossings.
ENGINEERING OTHER
Restore landscape to like or better conditions.
Call for required inspections as noted.
ESC REQ
Maintain erosion and sedimentation control per City and SWMMW standard requirements.
Sound/Noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND OR NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites/activities must comply with the noise limits
of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
TRAFFIC CONTROL
Traffic Control per approved plan and MUTCD. All Flaggers shall be certified.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL"
E-7 TRAFFIC CTRL
Printed: Tuesday, August 03, 2021 12:06:10 PM 2 of 2
ENG2021-0249
�/0 of EPAfoIV
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION RECEIVED
Complete and submit this Application in accordance with the Submittal Jul 07 2021CITY OF EDMONDS
'Nc. is) Requirements outlined in Right -of -Way permit Handout E63. DEVELOPMENT SERVICES
DEPARTMENT
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General •
Project Name GF 550 Main St - Edmonds - Phase 2
Site Address or if no site address use Property Address at NW corner of project area: 555 DAYTON ST.
Associated Permits: BLD PLN ENG
Owner and Entity Holding•• •
Name of Company COMCAST CABLE HOLDINGS Franchise Ordinance No:
Point of Contact JOURDEN LAWRENCE
Title PERMIT COORDINATOR
Address 1525 75TH ST SW
City EVERETT
State WA
Zip 98203
Phone 425-921-8201
Email Jourden Lawrence comcast.com
Contractor and Authorized ent of Owner (see note below)
Contractor Contacts During Construction
Name of Company CABLECOM.LLC
Primary Name CABLECOM LLC - BRENT DIXON
Agent Name Pauni Vaimili
Title CONTRUCTION SUPERVISOR
Title PERMIT COORDINATOR
Mobile 425-870-4407
Address 20021 120th Ave NE Suite 101
Email brent.dixon@cablecomllc.net
City BOTHELL
State WA
Zip 98011
Secondary Name
Phone 360-312-3259
Title
Email snohomish.permitting@cablecomlIc.net
Mobile
City of Edmonds Business License No: N R - 021818
Email
State License No: CABLEL*971 DP
V Contractor verifies it is currently bonded
u/ Contractor verifies it currently has general liability insurance
NOTE: ECDC18.6o.o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as well)
❑ Traffic Control Only (no associated development)
ls4Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
AT PED LOCATED ON THE NE CORNER OF 555 DAYTON ST. TIE IN. PROOF & PULL APPROX. 30' CATV NW & CONTINUE WORK ON TO PRIVATE PROPERTY.
0700815
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
x
LF
SF
Alley 2 hours +
LF
x
LF
SF
Parking 72 hours +
LF
x
LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities: :
❑ telecommunications cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
Details
1.
of Work to be Completed
Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
2.
1 Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
Details
of Work to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
How many are existing? I I How many are to be added?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? I I What is the height of the additional poles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: �Oacuu yam DATE: 06/29/2021
APPLICANT PRINTED NAME: Pauni Vaimili
APPLICANT TITLE: Permit Coordinator
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
DETAIL 2
Completed By:
John Novelli
Address:
555 DAYTON ST. EDMONDS, WA 98020
Completion Date:
6/25/2021
Private Exterior Footages:
COMCAST
Survey Revision Date:
New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0
New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0
Empty Conduit Only: 0 New UG Coax: 0 Existing UG Coax: 105
Are Additional Pages Needed: No
Survey Revision Task ID:
Engineered For:
Project Manager:
P2 ID:
JB0000700815
Legend
New Ped
El
Pole
New Vault
a
Lock Box
Existing U/G
Footage
150'
Existing Aerial
Text Box
Text
New U/G
Callout Arrow
New Aerial
----
New Tap
Interior Path
Phase Identifier
❑1
Footage Break
Fiber Splice Point
Power Supply
Ps
Storage Loop
Hard Surface Cut
O
Riser
®
Abandoned Cable
Provide Clear Construction Details
AT PED LOCATED ON THE NE CORNER OF 555 DAYTON ST.
TIE IN. PROOF & PULL APPROX. 30' CATV NW & CONTINUE
WORK ON TO PRIVATE PROPERTY.
BUFFER DATA
LONGITUDINAL BUFF91 SPACE - S
1�EiD �NI'N
3i
�
3S
M
<S
SO
SS
f0
AS
7f
Lbr1pTN
•Y3
900
YA
]OS
l!D
<2S
.IFS
SN
6K
-
BUFFER VENCLE ROLL AHEAD DISTANCE = R
T KAILI•oKTAOtt A I
!0
VINIIW RDSI _"CIE —IPrt Ts.m IFS THE SIAtrAw
v�fprt — — IN ACGORaA7Fce v4m Im
10
•ao FEET NN1,
NANUFACIURERI RECMNEMATM.
RROTTOCIIK KNV1E
ILO fE[OER•p
NAr IE A MORK relReLe srRwttaeALLv InewTED To sa<E�n
OL41ANCe
THE qCR< AREA.
RfOU1RLD
6TH AVE S
SKM SPACING = X (1)
R-1 H13 8 6D 1K III•N �NQA
RWAI ROADS IT / /I Ill 1,lOA
RO-IL RDA% A UNU'R AIILNIALS lS'IQ NPN T>a_
RWAI Ra_ I.RAAV
RLH DL\TIA- A D IN DISTRLIS
URfM FINE!'F 2S NW OR UE I..:7:
{tl ALL SEACfW L1AM 3L ALVOSfL7 TO Accomw0DATE
MI•INCI LJN: � Ogrfr4lTS.
ROADAIAIC WMUTIONA. RE DUGED w URBAM AIEA•1 TO flf
W 10 OF
f 0[1 6C
00
rlfOrB (OTONAL IF
b NM OR liffl
N �T
WE ROJ1D
r1iPMID wg1N
To
IT•P AHEAD
u• p' u' AP
1F2F7f ONE LANE TV20•t
ROAD
AHEAD
Y• u'
IILD.TA TYlALA
»
p1E LAME iA
RDAD �I� r
HADEVICE
SPACINO FEE
At N•'I�;'� •r P
MI'N lA}K:CN!
YIt.S N T(l 2f DD
E/• V2f.E fflD.fA / - TO TU 20 O
ROAD fE T c w r<I 7f o
wtIRK PRIPMEO START POINT END POINT
AHFAO ro ET•P
u• v
wtvT tIT�T1
lvso.>f IomoNu v
N IfA1 OR ltAf)
LEGEND
FLAGGING STATION
u ttMIORARr mm IOCA11M
D eNA.weLllllw D[rlteA
PR0tw1A1E WHICAP
ONE -LANE. TWO-WAY TRAFFIC CONTROL
WITH FLAGGERS
\OT TO SCALE
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
KUI�Y
1. ALL 3OI if ANE EIACK OM CRANOE
2 EKFE DING THE CNAW 1L!ZN DEVICE TAEER ACROSS
fKA)IDFR IC fECOANFNOFO.
1 mo VIORR REOLIRES Avomo IL ROAD~ Liewrlo AT
FIAOEIN('. 'NI- fIMA)ARD FMCIFICARONG FOR
ADCITDI DETAIf.
A SEE S ECW MOMIDAS �DN IVQRK . q WS>RC"ll
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
ENGINEERING DIVISION
APPROVED AS NOTED
����������08/03/2021
OVERVIEW
Completed By:
John Novelli
N
_ c
`
S
Completion Date:
6/25/2021
Address:
555 DAYTON ST. EDMONDS, WA 98020
COMCAST
Survey Revision Date:
Survey Revision Task ID:
Footages Entered On Right of Way, Private Exterior, and Private Interior tabs. Footages
are summarized on Survey Rollup tab.
Engineered For:
Project Manager:
Are Additional Pages Needed: No
P2 ID:
JB0000700815
Legend
New Ped
❑
Pole
New Vault
❑v
Lock Box
Existing U/G
Footage
150'
Existing Aerial
Text Box
Text
New U/G
Callout Arrow
New Aerial--�
New Tap
A
Interior Path
Footage Break
Phase Identifier
❑1
Fiber Splice Point
N
Power Supply
Storage Loop
Hard Surface Cut
O
Riser
®
Abandoned Cable
Provide Clear Construction Details
AT PED LOCATED ON THE NE CORNER OF 555 DAYTON ST
TIE IN. PROOF & PULL APPROX. 30' CATV NW & CONTINUE
WORK ON TO PRIVATE PROPERTY.
RECEIVED
Jul 07 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
J
Main qt W1
.. .. ..
111111M Iff
A
A
RESUB
Machuga, Jen
JUL 26 2021
CITY OF EDMONDS
From:
Sopi, Sa'olotonga <tonga.sopi@cablecomllc.net> DEVELOPMENT
Sent:
Saturday, July 24, 2021 3:54 PM SERVICES DEPARTMENT
To:
Edmonds Engineering Permits; Lawrence, Jourden; Stemler, Teresa (Contractor); DG-CCI-
Snohomish Permitting
Cc:
Puna Mcilwain; Pauni Vaimili
Subject:
Re: ENG2021-0249 555 DAYTON ST
Attachments:
JB0000700815 - CONSTRUCTION PLANS REV.pdf; IMG_20210618_100805393 jpg; IMG_20210618_
100759475jpg;IMG_20210618_100837307jpg
Categories: Green category
Hello-- Please see our comments below (red) in response to your 07/19/2021 email and let us know if you have
any other questions or concerns... Thank you!
Q: The plans show that the conduit crossing the alley is existing so the city will allow it to be reused, however if the
conduit is not existing or it is damaged and can not be reused than a new conduit shall be installed crossing the alley at a
90 degree angle parallel to 6th Ave S onto the private property.
A: We will notify the jurisdiction if the Site Plans change.
Q: There is a BO pole at this location. Please verify that Comcast is no longer attached to this old BO pole. If Comcast is
still attached than those lines shall be moved to the new pole and the old BO pole shall be removed.
A: We have verified with our Walkout Team that Comcast is no longer attached to the old BO pole. See attached
photos.
Q: Please show all utilities on the site plan. Potholing shall be required when crossing any utility if the contractor needs
to bore a new conduit.
A: Attached for your review/approval is a revised Site Plan that includes Utilities on page 6 and we will notify
the jurisdiction if the Site Plans change.
Have a great day! T...
=Last Day 08/06/2021=
Sa'olotonga M. Sopi
Permit Coordinator
CableCom LLC.
1316 Bonneville Ave I Snohomish WA, 98290
(360) 312-3259 1 tonga.sopi a(�.cablecomllc.net
On Mon, Jul 19, 2021 at 9:02 AM Edmonds Engineering Permits<EngineeringPermits@edmondswa.gov> wrote:
CAUTION: External
Good Morning,
I have reviewed the application for the revision to permit ENG2020-0394, and I have a few comments/questions:
The plans show that the conduit crossing the alley is existing so the city will allow it to be reused, however if the
conduit is not existing or it is damaged and can not be reused than a new conduit shall be installed crossing the
alley at a 90 degree angle parallel to 6th Ave S onto the private property.
There is a BO pole at this location. Please verify that Comcast is no longer attached to this old BO pole. If
Comcast is still attached than those lines shall be moved to the new pole and the old BO pole shall be removed.
Please show all utilities on the site plan. Potholing shall be required when crossing any utility if the contractor
needs to bore a new conduit.
Please let me know if you have any questions. Thank You!
City of Edmonds, Engineering Division Permitting
EngineeringPermits@edmondswa.gov
Jeff Whatmore, Engineering Technician
(425) 771-0220 ext. 1339
CITY HALL IS CURRENTLY CLOSED TO GENERAL PUBLIC ACCESS.
Development services will continue to be provided by email or the web and by phone.
Please visit www.edmondswa.gov for up-to-date information on City services.
For engineering permit inquiries, please email: engineeringpermits edmondswa.gov
For all other inquiries please email: devserv.admin(@edmondswa.gov.
Web Map: www.maps.edmondswa.gov
This email message, and any documents which may accompany it, contain information which is intended for use only by the
intended recipient(s), and may contain information that is privileged and/or confidential. If you are not the intended recipient of this
message you are hereby notified that any review, disclosure, dissemination, distribution, copy or other use of this message or its
attachments is strictly prohibited. If you have received this message in error, please notify the sender by reply email, delete the
email from your computer and destroy all copies of the communication and any attachments.
AS B U I L D COVER
Completed By:
John Novelli
N
_ c
`
S
Completion Date:
6/25/2021
Address:
555 DATYON ST. EDMONDS, WA 98020
COMCAST
Survey Revision Date:
Survey Revision Task ID:
Footages Entered On Right of Way, Private Exterior, and Private Interior tabs. Footages
are summarized on Survey Rollup tab.
Engineered For:
Project Manager:
Are Additional Pages Needed: No
P2 ID:
JB0000700815
Legend
L
New Ped ❑
Pole
New Vault ❑�
Lock Box
Existing U/G
Footage
150'
Edmonds
Existing Aerial
Text Box
Text
a
^pi
New U/G
Callout Arrow
P
z
New Aerial
>
Q
Interior Path
New Tap
h�
°
00
Footage Break
Phase Identifier
0
Bell St
Fiber Splice Point
Power Supply
Ps
41°jn
s�
Storage Loop CDW
Hard Surface Cut
C
O
Riser ®
Abandoned Cable
v
ain St
I i
Main St
Provide Clear Construction Details
AT PED LOCATED ON THE NE CORNER OF 555 DAYTON ST.
TIE IN. PROOF & PULL APPROX. 30' CATV NW & CONTINUE
WORK ON TO PRIVATE PROPERTY..
I
-
2
5
0
yton St
Q
c
� n
Dayton St
N
>
Q >
<
I a:
pw L >
1_
p
m
y � I
L--L
--•
61�p1c St
0
Q
RECEIVED
i
Maple St
Jul 07 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
-•--
—
Alder St
Alder St
r
DETAIL
Completed By:
John Novelli
Address:
555 DAYTON ST. EDMONDS, WA 98020
Completion Date:
6/25/2021
Right of Way Footages:
T
IProject
COM
Survey Revision Date:
New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0
New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0
Empty Conduit Only: 0 New UG Coax: 0 Existing UG Coax: 105
Are Additional Pages Needed: No
Survey Revision Task ID:
Engineered For:
Manager:
P2 ID:
JB0000700815
Legend
New Ped ❑
Pole
New Vault ❑v
Lock Box
Existing U/G
Footage
-
Existing Aerial
"
Text Box Text
New U/G
fallout Arrow
New Aerial — — — — -
+�
New Tap 0
Interior Path •---
❑1
Footage Break
Phase Identifier
Fiber Splice Point
Power Supply ■
Storage Loop
Hard Surface Cut •
Riser ®
Abandoned Cable
Provide Clear Construction
Details
AT PED LOCATED ON THE NE
CORNER OF 555 DAYTON ST.
TIE IN. PROOF & PULL APPROX.
30' CATV NW & CONTINUE
WORK ON TO PRIVATE PROPERTY.
RECEIVED
Jul 07 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
ROAD kalCLOSED�iwi 1
DETAIL 2
Completed By:
John Novelli
Address:
555 DAYTON ST. EDMONDS, WA 98020
Completion Date:
6/25/2021
Private Exterior Footages:
COj/\V/`` a . � A � �
Survey Revision Date:
New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0
New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0
Empty Conduit Only: 0 New UG Coax: 0 Existing UG Coax: 105
Are Additional Pages Needed- No
Survey Revision Task ID:
Engineered For:
Project Manager:
P2 ID:
JB0000700815
Legend
New Ped
❑
Pole
New Vault
❑v
Lock Box
Existing U/G
Footage
150'
Existing Aerial
Text Box
Text
New U/G
Callout Arrow
New Aerial
— — — —
-
New Tap
0
Interior Path
----
Footage Break
Phase Identifier
❑1
Fiber Splice Point
Power Supply
■
Storage Loop
Hard Surface Cut
•
Riser
®
Abandoned Cable
Provide Clear Construction Details
AT PED LOCATED ON THE NE CORNER OF 555 DAYTON ST
TIE IN. PROOF & PULL APPROX. 30' CATV NW & CONTINUE
WORK ON TO PRIVATE PROPERTY.
RECEIVED
Jul 07 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
DATE TECH ENG
425.327.6404
CO m ca st ��0 ORIGINAL 7/01/20 1 BLH AJD WgECO ENGINEER AARON DIEDRICHS AARON@WAECOCONSTRUCTION.COM O 555 DAYTON ST„
REV #0 ---- ---- ---- 360.926.3437
Alp In ENGINEERING Know what's below. REVIEWED ---- ---- ---- CABLECOM ENGINEER CHRISATKINSON CHRIS.ATKINSON@CABLECOMLLC.NET EDMONDS, WA 98020
Call before youdlg. AS -BUILT ---- ---- ----
ADDRESS: 555 DAYTON ST, EDMONDS, WA 98020
PROJECT NAME: J B0000700815
VICINITY MAP
Point-Nonff II
Lynnwood 1.4. Laka
1h 52S
•' 555 Dayton St, Lynnwood p
Edmonds, WA 98020 alderwood
Manor
Woodway��P
Esperance
Mountlake
Terrace
Lake BI
Shoreline Forest Park Kenmore
s:D
SHEET 4
SITE LOCATION
T I COVER SHEET
CONTACTS
CHRIS ATKINSON
SUPERVISOR
CABLECOM
CHRIS.ATKINSON@CABLECOMLLC.NET
360.926.3437
AARON DIEDRICHS
ENGINEER MANAGER
WAECO ENGINEERING
AARON@WAECOCONSTRUCTION.COM
425.327. 404
SITE INDEX
1 - COVER SHEET/SITE LOCATION
2-LEGEND
3 - GENERAL NOTES
4 - DESIGN VIEW 1
5 - SITE PHOTOGRAPHS
SCOPE OF WORK:
RISER DOWN UTILITY POLE ON NE CORNER
OF 555 DAYTON ST. TIE IN TO EXISTING
PEDESTAL ON NE CORNER OF 555 DAYTON
ST. PROOF & PULL CATV CABLE ONTO
PRIVATE PROPERTY.
PROPRIETARY - NOT FOR DISTRIBUTIONI CLIENT FIRM7CABLECOMw PROJECT NUMBER: JB0000700815 I PERMIT NUMBER: ---- S30IAH3S13 our 3
SHEET # 1 OF 5
DRAWING NAME: G:\SHARED DRIVES\WAECO ENGINEERING SERVER\2021\1 - CUSTOM ERS\CABLECOM\SUILT\21586_EDMONDS — DAYTONST�rr_JB0000700815\ENG PRINTS-21\CADUB0000700815 CONSTRUCTION_PLANS.DWG �r;z , �-, r, A — ra—r-I
DATE TECH ENG
425.327.6404
ORIGINAL 7/01/20 1 BLH AJD WAECO ENGINEER AARON DIEDRICHS AARON WAECOCONSTRUCTION.COM O 555 DAYTON ST
Comcast 3; � CEO REV #0 ____ ____ 360.926.3437 LEGEND
CableCom ENGINEERING Know what's below. REVIEWED - CABLECOMENGINEER CHRISATKINSON CHRIS.ATKINSON@CABLECOMLLC.NET EDMONDS, WA 98020
Call before you dig. AS -BUILT ---- ---- ----
LI N E YP L S ® RISER PB PULBOX - PROPOSED
CONDUIT - EXISTING IN: 0
CONDUIT -PROPOSED #F OUT: 0 SEQUENTIAL CALLOUT
BORE PIT O
AERIAL FIBER - EXISTING c><0 STORAGE - EXISTING
AERIAL FIBER - PROPOSED
AERIAL FIBER - OVERLASH `,i PHOTO MARKER 0' #F TAIL: 0 SEQUENTIAL IN TAIL CALLOUT
RIGHT OF WAY �� STORAGE - PROPOSED
PARCEL BOUNDARY FM—] CATCH BASIN/INLET
CURB
EDGE OF PAVEMENT POLE ANCHOR/DOWN GUY - EXISTING TAIL: 0
FENCE XOX FIRE HYDRANT #F OUT: 0 SEQUENTIAL TAIL OUT CALLOUT
GAS
WATER I GROUND/BOND POLE ANCHOR/DOWN GUY - PROPOSED POLE OWNER NAME
POLE NUMBER TAG NUMBER
TELEPHONE d ADDITIONAL POLE TAG TAG NUMBER POLE TABLE/ ATTACHMENT CALLOUT
UTILTY1 x'xx'
ELECTRIC STREET LIGHT POST mw Imurc
O ---►� SANITARY SEWER (SEW) PROPOSED DOWN GUY ON EXISTING ANCHOR
I
STORM DRAIN
STREET LIGHT GRAVEL/ ROCK WALL
CABLE TV PB PULLBOX - EXISTING
STEAM
OIL 0— TRAFFIC ARM/STOP LIGHT °
a
UNKNOWN UTILITY FDP FIBER DISTRIBUTION PANEL - EXISTING ° SIDEWALK
FIBER OPTIC 0 TREE
TELECOMMUNICATIONS
STA. 1 +00
— — STATION LINE BUSH FDP FIBER DISTRIBUTION PANEL - PROPOSED BRICK
HEDGE SPLICE POINT - EXISTING r r r r
WATER
SYMBOL DESCRIPTION
HDPE HIGH DENSITY POLYETHYLENE O MISC. UTILITY
HH HANDHOLE ►� SPLICE POINT - PROPOSED \ \
JB JUNCTION BOX UTILITY POLE - EXISTING \ \ \ \ \ CONCRETE RESTORATION
MH MANHOLE
UTILITY CONTINUES
MP MILE POST POLE - PROPOSED
ASPHALT RESTORATION
PVC POLY VINYL CHLORIDE
RGS RIGID GALVANIZED STEEL CONDUIT �V VAULT - EXISTING UTILITY ENDS
ROW RIGHT OF WAY
ASPHALT OVER PCC RESTORATION
STA. STATION �V VAULT - PROPOSED
PD-## PEDESTAL -NUMBER
VT-## VAULT -NUMBER P PEDESTAL - EXISTING
LANDSCAPE RESTORATION
UP-## UTILITY POLE -NUMBER
❑P PEDESTAL - PROPOSED
PROPRIETARY - NOT FOR DISTRIBUTION ENGINEERING
FIRM WAECO ENGINEERING PROJECT NUMBER: JB0000700815 PERMIT NUMBER: ---- S� SIaN �wlaJVd3C] a 2 OF 5
DRAWING NAME: G:\SHARED DRIVES\WAECO ENGINEERING SERVER\2021\1 - CUSTOM ERS\CABLECOM\BUILT\21586 EDMONDS DAYTONST JB0000700815\ENG PRINTS-21\CAD\JB0000700815 CONSTRUCTION PLANS.DWG
t ZOZ LO Inf
MIAPM71N
DATE TECH ENG
425.327.6404
ORIGINAL( 7/01/20 1 BLH AJD WAECO ENGINEER AARON DIEDRICHS AARON WAECOCONSTRUCTION.COM O 555 DAYTON ST
Ccomcast ��� 0 REV #0 ____ ____ 360.926.3437 GENERAL NOTES
rmie...om ENGINEERING Know what's below. REVIEWED - CABLECOMENGINEER CHRISATKINSON CHRIS.ATKINSON@CABLECOMLLC.NET EDMONDS, WA 98020
Call before youdlg. AS -BUILT ---- ---- ----
1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND
CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS:
---- CURRENT INTERNATIONAL BUILDING CODE (IBC)
---- 2016 WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION
---- WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN (CURRENT EDITION)
2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED OTHERWISE
3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS IN PROGRESS.
4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL GOVERNING AUTHORITY.
5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL ASBUILT CONDITIONS ON ONE
SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE
CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT APPROVAL.
6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION.
7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS
AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY
VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE
IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS
BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES AND SITE FEATURES
PRESENTED ON THESE DRAWINGS. ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE.
8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES LOCATION SERVICE (1-800-424-5555) AT
LEAST 48 HOURS PRIOR TO CONSTRUCTION.
9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNER'S REPRESENTATIVE OF ANY
DISCREPANCIES.
10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS.
11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF.
ALL SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT.
12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT.
13. SUBGRADE SOILS IN ALL AREAS WHERE RAIN GARDENS, INFILTRATION OR PERVIOUS PAVEMENT IS TO BE PLACED SHALL BE DELINEATED AND PROTECTED AT ALL TIMES FROM
COMPACTIVE ACTIVITIES (i.e. HEAVY EQUIPMENT, STOCKPILING).
14. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL. IF SOIL IS DISTURBED,
SOFT, LOOSE, WET OR IF ORGANIC MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL PER GEOTECHNICAL REPORT.
15. SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EXISTING SITE FEATURES.
16. SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS. FOUNDATION DRAINS SHALL BE INDEPENDENT OF OTHER SITE DRAIN LINES AND SHALL BE TIGHTLINED
TO THE STORM DRAIN SYSTEM WHERE INDICATED ON THE PLANS.
17. ALL REQUIRED STORMWATER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE
ENGINEER.
18. ALL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED
OTHERWISE.
19. ALL FOOTING DRAINS SERVING BUILDINGS, WALLS, ROCKERIES, ETC. SHALL CONNECT TO THE DRAINAGE SYSTEM DOWNSTREAM OF THE SITE STORMWATER DETENTION
SYSTEM.
20. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS.
21. A SEPARATE IRRIGATION PERMIT MUST BE OBTAINED FROM THE CITY PUBLIC WORKS DEPARTMENT. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, PROVIDE TO THE CITY
WATER QUALITY TECHNICIAN, A COPY OF THE BACKFLOW TEST REPORT. TEST REPORTS CAN BE FAXED TO 425-744-6057 OR EMAILED TO JEFF.KOBLYK@EDMONDSWA.GOV.
BACKFLOW TESTING SHALL BE COMPLETED BY THE OWNER ANNUALLY THEREAFTER.
22. AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNED TO THE EQUIVALENT OF THEIR PRECONSTRUCTION CONDITION IN ACCORDANCE
WITH APPROPRIATE REQUIREMENTS AND STANDARDS.
23. ALL DISTURBED SOIL AREAS SHALL BE COMPOST AMENDED AND SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ONSITE EROSION AFTER
THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS.
24. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL
25. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED.
(PROPRIETARY - NOT FOR DISTRIBUTION
PROJECT NUMBER: JB0000700815 I PERMIT NUMBER: ----
S30In113S 1N311d 13A30
SONOwa3,10 LISHEET # 3 OF 5
C13AI303U
com ca st
O
able Om E N G I N E E R I N G
QAORIGINAL
Know what's below.
DATE
TECH
ENG
WAECO ENGINEER
AARON DIEDRICHS
425.327.6404
AARON WAECOCONSTRUCTION.COM
O
555 DAYTON ST
EDMON DS WA 98020
e
it
PROJECT SHEET
7/01/20
1 BLH
AJD
REV #0
----
360.926.3437
CHRIS.ATKINSON@CABLECOMLLC.NET
REVIEWED
----
----
-- _
CABLECOM ENGINEER
CHRIS ATKINSON
Call before you dlg.
AS -BUILT
----
----
----
lIPROPRIETARY - NOT FOR DISTRIBUTION
DRAWING NAME: GASHARED DRIVES\WAECO ENGINEERING SERVER\2021\1 - CU
MAIN ST
PARCEL# 00434209700100
600 MAIN ST
m
PROJECT NUMBER: JB0000700815 I PERMIT NUMBER: ----
)815\ENG PRINTS-21\CADUB0000700815 CONSTRUCTION PLANS.DWG
PARCEL# 0043d
117 6TH
CONSTRUCTION NOTES
O EXISTING COMCAST CONDUIT. PROOF CONDUIT PRIOR TO
CONSTRUCTION AND PULL (1) CAN CABLE THROUGH.
2O EXISTING COMCAST PEDESTAL. PULL (1) CAN CABLE
THROUGH.
® POTHOLE UTILITY CROSSINGS PRIOR TO BORE
iSYMBOL CORRESPONDS TO PHOTO LOCATIONS AND ORIENTATION.
PARCEL# 00434209700300
610 MAIN ST
a M/ M/2J Mob
SCALE: 1
4OF5
t ZOZ LO Inf
n71 A 170171 M
DATE TECH ENG
425.327.6404
Ccomcast ��0 ORIGINAL 7/01/20 1 BLH AJD WAECO ENGINEER AARON DIEDRICHS AARON@WAECOCONSTRUCTION.COM O 555 DAYTON ST„ SITE
REV #0 360.
�37 Om ENGINEERING Knawwhafsbelow. REVIEWED _ CABLECOM ENGINEER CHRIS ATKINSON CHRIS.ATKINSON@CAB@CABLECOMLLC.NET EDMON DS, WA 98020 PHOTOGRAPHS
Call before youdlg. AS -BUILT ___- ---- ----
INUMET
FACING NORTH ON WEST SIDE OF 6 AVE S
lIPROPRIETARY - NOT FOR DISTRIBUTION
DRAWING NAME: G:\SHARED DRIVES\WAECO ENGINEERING SERVER\2021\1 - CU
i
FACING WEST ON WEST SIDE OF 6TH AVE S
PROJECT NUMBER: JB0000700815 I PERMIT NUMBER: ----
)815\ENG PRINTS-21\CADUB0000700815 CONSTRUCTION PLANS.DWG
CONSTRUCTION NOTES
O EXISTING COMCAST CONDUIT. PROOF CONDUIT PRIOR TO
CONSTRUCTION AND PULL (1) CAN CABLE THROUGH.
O EXISTING COMCAST PEDESTAL. PULL (1) CAN CABLE
THROUGH.
S30IA2J3S1N3AdPS*1EET # 5 OF 5