Loading...
ENG2021-0249 ROW PERMITOF WAY EUC PERMIT PERMITNUMBER, City of Edmonds EdmondsRIGHT 98020 1 1 . www.cityofedmonds.gov Description: COMCAST-TIE IN AT PED, PROOF AND PULL APPROX 30' CATV ISSUED: 08/03/2021 Address: 550 MAIN ST EDMONDS WA 98020-3183 EXPIRES: 02/03/2022 Permit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00434212001500 NAME TYPE NAME ADDRESS PHONE APPLICANT COMCAST 1525 75TH ST SW, EVERETT WA 98203 (425)921-8201 CONTRACTOR Cablecom LLC 20021 120TH AVE NE, SUITE 101, BOTHELL WA 98011 (360)668-1300 OWNER SEATTLE-SNOHOMISH MILL 9525 AIRPORT WAY, SNOHOMISH WA 98296 COMPANY INC INFORMFEE DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00 ENGINEERING INSPECTION FEE $110.00 $0.00 RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $0.00 • REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. 77 INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 08/03/2021 RELEASED BY DATE Printed: Tuesday, August 03, 2021 12:06:10 PM 1 of 2 -KRWOF WAY EUC PERMIT ER City of • • • www.cityofedmonds.gov• • CONDITIONS CONDITION TYPE Easement and/or permission from adjacent property owner is required prior to entry or work within ADJACENT PROPERTY an adjacent property. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. Alert affected residents and/or businesses prior to work start. Verify clear bore crossings. ENGINEERING OTHER Restore landscape to like or better conditions. Call for required inspections as noted. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. TRAFFIC CONTROL Traffic Control per approved plan and MUTCD. All Flaggers shall be certified. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START X-2 ENGINEERING FINAL" E-7 TRAFFIC CTRL Printed: Tuesday, August 03, 2021 12:06:10 PM 2 of 2 ENG2021-0249 �/0 of EPAfoIV RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION RECEIVED Complete and submit this Application in accordance with the Submittal Jul 07 2021CITY OF EDMONDS 'Nc. is) Requirements outlined in Right -of -Way permit Handout E63. DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A General • Project Name GF 550 Main St - Edmonds - Phase 2 Site Address or if no site address use Property Address at NW corner of project area: 555 DAYTON ST. Associated Permits: BLD PLN ENG Owner and Entity Holding•• • Name of Company COMCAST CABLE HOLDINGS Franchise Ordinance No: Point of Contact JOURDEN LAWRENCE Title PERMIT COORDINATOR Address 1525 75TH ST SW City EVERETT State WA Zip 98203 Phone 425-921-8201 Email Jourden Lawrence comcast.com Contractor and Authorized ent of Owner (see note below) Contractor Contacts During Construction Name of Company CABLECOM.LLC Primary Name CABLECOM LLC - BRENT DIXON Agent Name Pauni Vaimili Title CONTRUCTION SUPERVISOR Title PERMIT COORDINATOR Mobile 425-870-4407 Address 20021 120th Ave NE Suite 101 Email brent.dixon@cablecomllc.net City BOTHELL State WA Zip 98011 Secondary Name Phone 360-312-3259 Title Email snohomish.permitting@cablecomlIc.net Mobile City of Edmonds Business License No: N R - 021818 Email State License No: CABLEL*971 DP V Contractor verifies it is currently bonded u/ Contractor verifies it currently has general liability insurance NOTE: ECDC18.6o.o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) ls4Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) AT PED LOCATED ON THE NE CORNER OF 555 DAYTON ST. TIE IN. PROOF & PULL APPROX. 30' CATV NW & CONTINUE WORK ON TO PRIVATE PROPERTY. 0700815 RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF x LF SF Alley 2 hours + LF x LF SF Parking 72 hours + LF x LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: : ❑ telecommunications cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details 1. of Work to be Completed Does the utility owner have existing overhead infrastructure in the area of work? Yes No 2. 1 Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? 5. Does the work involve proposed additions to an aboveground utility stem? If es: Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: How many are existing? I I How many are to be added? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additional poles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: �Oacuu yam DATE: 06/29/2021 APPLICANT PRINTED NAME: Pauni Vaimili APPLICANT TITLE: Permit Coordinator NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 DETAIL 2 Completed By: John Novelli Address: 555 DAYTON ST. EDMONDS, WA 98020 Completion Date: 6/25/2021 Private Exterior Footages: COMCAST Survey Revision Date: New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0 New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 Empty Conduit Only: 0 New UG Coax: 0 Existing UG Coax: 105 Are Additional Pages Needed: No Survey Revision Task ID: Engineered For: Project Manager: P2 ID: JB0000700815 Legend New Ped El Pole New Vault a Lock Box Existing U/G Footage 150' Existing Aerial Text Box Text New U/G Callout Arrow New Aerial ---- New Tap Interior Path Phase Identifier ❑1 Footage Break Fiber Splice Point Power Supply Ps Storage Loop Hard Surface Cut O Riser ® Abandoned Cable Provide Clear Construction Details AT PED LOCATED ON THE NE CORNER OF 555 DAYTON ST. TIE IN. PROOF & PULL APPROX. 30' CATV NW & CONTINUE WORK ON TO PRIVATE PROPERTY. BUFFER DATA LONGITUDINAL BUFF91 SPACE - S 1�EiD �NI'N 3i � 3S M <S SO SS f0 AS 7f Lbr1pTN •Y3 900 YA ]OS l!D <2S .IFS SN 6K - BUFFER VENCLE ROLL AHEAD DISTANCE = R T KAILI•oKTAOtt A I !0 VINIIW RDSI _"CIE —IPrt Ts.m IFS THE SIAtrAw v�fprt — — IN ACGORaA7Fce v4m Im 10 •ao FEET NN1, NANUFACIURERI RECMNEMATM. RROTTOCIIK KNV1E ILO fE[OER•p NAr IE A MORK relReLe srRwttaeALLv InewTED To sa<E�n OL41ANCe THE qCR< AREA. RfOU1RLD 6TH AVE S SKM SPACING = X (1) R-1 H13 8 6D 1K III•N �NQA RWAI ROADS IT / /I Ill 1,lOA RO-IL RDA% A UNU'R AIILNIALS lS'IQ NPN T>a_ RWAI Ra_ I.RAAV RLH DL\TIA- A D IN DISTRLIS URfM FINE!'F 2S NW OR UE I..:7: {tl ALL SEACfW L1AM 3L ALVOSfL7 TO Accomw0DATE MI•INCI LJN: � Ogrfr4lTS. ROADAIAIC WMUTIONA. RE DUGED w URBAM AIEA•1 TO flf W 10 OF f 0[1 6C 00 rlfOrB (OTONAL IF b NM OR liffl N �T WE ROJ1D r1iPMID wg1N To IT•P AHEAD u• p' u' AP 1F2F7f ONE LANE TV20•t ROAD AHEAD Y• u' IILD.TA TYlALA » p1E LAME iA RDAD �I� r HADEVICE SPACINO FEE At N•'I�;'� •r P MI'N lA}K:CN! YIt.S N T(l 2f DD E/• V2f.E fflD.fA / - TO TU 20 O ROAD fE T c w r<I 7f o wtIRK PRIPMEO START POINT END POINT AHFAO ro ET•P u• v wtvT tIT�T1 lvso.>f IomoNu v N IfA1 OR ltAf) LEGEND FLAGGING STATION u ttMIORARr mm IOCA11M D eNA.weLllllw D[rlteA PR0tw1A1E WHICAP ONE -LANE. TWO-WAY TRAFFIC CONTROL WITH FLAGGERS \OT TO SCALE OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. KUI�Y 1. ALL 3OI if ANE EIACK OM CRANOE 2 EKFE DING THE CNAW 1L!ZN DEVICE TAEER ACROSS fKA)IDFR IC fECOANFNOFO. 1 mo VIORR REOLIRES Avomo IL ROAD~ Liewrlo AT FIAOEIN('. 'NI- fIMA)ARD FMCIFICARONG FOR ADCITDI DETAIf. A SEE S ECW MOMIDAS �DN IVQRK . q WS>RC"ll OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. ENGINEERING DIVISION APPROVED AS NOTED ����������08/03/2021 OVERVIEW Completed By: John Novelli N _ c ` S Completion Date: 6/25/2021 Address: 555 DAYTON ST. EDMONDS, WA 98020 COMCAST Survey Revision Date: Survey Revision Task ID: Footages Entered On Right of Way, Private Exterior, and Private Interior tabs. Footages are summarized on Survey Rollup tab. Engineered For: Project Manager: Are Additional Pages Needed: No P2 ID: JB0000700815 Legend New Ped ❑ Pole New Vault ❑v Lock Box Existing U/G Footage 150' Existing Aerial Text Box Text New U/G Callout Arrow New Aerial--� New Tap A Interior Path Footage Break Phase Identifier ❑1 Fiber Splice Point N Power Supply Storage Loop Hard Surface Cut O Riser ® Abandoned Cable Provide Clear Construction Details AT PED LOCATED ON THE NE CORNER OF 555 DAYTON ST TIE IN. PROOF & PULL APPROX. 30' CATV NW & CONTINUE WORK ON TO PRIVATE PROPERTY. RECEIVED Jul 07 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT J Main qt W1 .. .. .. 111111M Iff A A RESUB Machuga, Jen JUL 26 2021 CITY OF EDMONDS From: Sopi, Sa'olotonga <tonga.sopi@cablecomllc.net> DEVELOPMENT Sent: Saturday, July 24, 2021 3:54 PM SERVICES DEPARTMENT To: Edmonds Engineering Permits; Lawrence, Jourden; Stemler, Teresa (Contractor); DG-CCI- Snohomish Permitting Cc: Puna Mcilwain; Pauni Vaimili Subject: Re: ENG2021-0249 555 DAYTON ST Attachments: JB0000700815 - CONSTRUCTION PLANS REV.pdf; IMG_20210618_100805393 jpg; IMG_20210618_ 100759475jpg;IMG_20210618_100837307jpg Categories: Green category Hello-- Please see our comments below (red) in response to your 07/19/2021 email and let us know if you have any other questions or concerns... Thank you! Q: The plans show that the conduit crossing the alley is existing so the city will allow it to be reused, however if the conduit is not existing or it is damaged and can not be reused than a new conduit shall be installed crossing the alley at a 90 degree angle parallel to 6th Ave S onto the private property. A: We will notify the jurisdiction if the Site Plans change. Q: There is a BO pole at this location. Please verify that Comcast is no longer attached to this old BO pole. If Comcast is still attached than those lines shall be moved to the new pole and the old BO pole shall be removed. A: We have verified with our Walkout Team that Comcast is no longer attached to the old BO pole. See attached photos. Q: Please show all utilities on the site plan. Potholing shall be required when crossing any utility if the contractor needs to bore a new conduit. A: Attached for your review/approval is a revised Site Plan that includes Utilities on page 6 and we will notify the jurisdiction if the Site Plans change. Have a great day! T... =Last Day 08/06/2021= Sa'olotonga M. Sopi Permit Coordinator CableCom LLC. 1316 Bonneville Ave I Snohomish WA, 98290 (360) 312-3259 1 tonga.sopi a(�.cablecomllc.net On Mon, Jul 19, 2021 at 9:02 AM Edmonds Engineering Permits<EngineeringPermits@edmondswa.gov> wrote: CAUTION: External Good Morning, I have reviewed the application for the revision to permit ENG2020-0394, and I have a few comments/questions: The plans show that the conduit crossing the alley is existing so the city will allow it to be reused, however if the conduit is not existing or it is damaged and can not be reused than a new conduit shall be installed crossing the alley at a 90 degree angle parallel to 6th Ave S onto the private property. There is a BO pole at this location. Please verify that Comcast is no longer attached to this old BO pole. If Comcast is still attached than those lines shall be moved to the new pole and the old BO pole shall be removed. Please show all utilities on the site plan. Potholing shall be required when crossing any utility if the contractor needs to bore a new conduit. Please let me know if you have any questions. Thank You! City of Edmonds, Engineering Division Permitting EngineeringPermits@edmondswa.gov Jeff Whatmore, Engineering Technician (425) 771-0220 ext. 1339 CITY HALL IS CURRENTLY CLOSED TO GENERAL PUBLIC ACCESS. Development services will continue to be provided by email or the web and by phone. Please visit www.edmondswa.gov for up-to-date information on City services. For engineering permit inquiries, please email: engineeringpermits edmondswa.gov For all other inquiries please email: devserv.admin(@edmondswa.gov. Web Map: www.maps.edmondswa.gov This email message, and any documents which may accompany it, contain information which is intended for use only by the intended recipient(s), and may contain information that is privileged and/or confidential. If you are not the intended recipient of this message you are hereby notified that any review, disclosure, dissemination, distribution, copy or other use of this message or its attachments is strictly prohibited. If you have received this message in error, please notify the sender by reply email, delete the email from your computer and destroy all copies of the communication and any attachments. AS B U I L D COVER Completed By: John Novelli N _ c ` S Completion Date: 6/25/2021 Address: 555 DATYON ST. EDMONDS, WA 98020 COMCAST Survey Revision Date: Survey Revision Task ID: Footages Entered On Right of Way, Private Exterior, and Private Interior tabs. Footages are summarized on Survey Rollup tab. Engineered For: Project Manager: Are Additional Pages Needed: No P2 ID: JB0000700815 Legend L New Ped ❑ Pole New Vault ❑� Lock Box Existing U/G Footage 150' Edmonds Existing Aerial Text Box Text a ^pi New U/G Callout Arrow P z New Aerial > Q Interior Path New Tap h� ° 00 Footage Break Phase Identifier 0 Bell St Fiber Splice Point Power Supply Ps 41°jn s� Storage Loop CDW Hard Surface Cut C O Riser ® Abandoned Cable v ain St I i Main St Provide Clear Construction Details AT PED LOCATED ON THE NE CORNER OF 555 DAYTON ST. TIE IN. PROOF & PULL APPROX. 30' CATV NW & CONTINUE WORK ON TO PRIVATE PROPERTY.. I - 2 5 0 yton St Q c � n Dayton St N > Q > < I a: pw L > 1_ p m y � I L--L --• 61�p1c St 0 Q RECEIVED i Maple St Jul 07 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT -•-- — Alder St Alder St r DETAIL Completed By: John Novelli Address: 555 DAYTON ST. EDMONDS, WA 98020 Completion Date: 6/25/2021 Right of Way Footages: T IProject COM Survey Revision Date: New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0 New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 Empty Conduit Only: 0 New UG Coax: 0 Existing UG Coax: 105 Are Additional Pages Needed: No Survey Revision Task ID: Engineered For: Manager: P2 ID: JB0000700815 Legend New Ped ❑ Pole New Vault ❑v Lock Box Existing U/G Footage - Existing Aerial " Text Box Text New U/G fallout Arrow New Aerial — — — — - +� New Tap 0 Interior Path •--- ❑1 Footage Break Phase Identifier Fiber Splice Point Power Supply ■ Storage Loop Hard Surface Cut • Riser ® Abandoned Cable Provide Clear Construction Details AT PED LOCATED ON THE NE CORNER OF 555 DAYTON ST. TIE IN. PROOF & PULL APPROX. 30' CATV NW & CONTINUE WORK ON TO PRIVATE PROPERTY. RECEIVED Jul 07 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ROAD kalCLOSED�iwi 1 DETAIL 2 Completed By: John Novelli Address: 555 DAYTON ST. EDMONDS, WA 98020 Completion Date: 6/25/2021 Private Exterior Footages: COj/\V/`` a . � A � � Survey Revision Date: New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0 New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 Empty Conduit Only: 0 New UG Coax: 0 Existing UG Coax: 105 Are Additional Pages Needed- No Survey Revision Task ID: Engineered For: Project Manager: P2 ID: JB0000700815 Legend New Ped ❑ Pole New Vault ❑v Lock Box Existing U/G Footage 150' Existing Aerial Text Box Text New U/G Callout Arrow New Aerial — — — — - New Tap 0 Interior Path ---- Footage Break Phase Identifier ❑1 Fiber Splice Point Power Supply ■ Storage Loop Hard Surface Cut • Riser ® Abandoned Cable Provide Clear Construction Details AT PED LOCATED ON THE NE CORNER OF 555 DAYTON ST TIE IN. PROOF & PULL APPROX. 30' CATV NW & CONTINUE WORK ON TO PRIVATE PROPERTY. RECEIVED Jul 07 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT DATE TECH ENG 425.327.6404 CO m ca st ��0 ORIGINAL 7/01/20 1 BLH AJD WgECO ENGINEER AARON DIEDRICHS AARON@WAECOCONSTRUCTION.COM O 555 DAYTON ST„ REV #0 ---- ---- ---- 360.926.3437 Alp In ENGINEERING Know what's below. REVIEWED ---- ---- ---- CABLECOM ENGINEER CHRISATKINSON CHRIS.ATKINSON@CABLECOMLLC.NET EDMONDS, WA 98020 Call before youdlg. AS -BUILT ---- ---- ---- ADDRESS: 555 DAYTON ST, EDMONDS, WA 98020 PROJECT NAME: J B0000700815 VICINITY MAP Point-Nonff II Lynnwood 1.4. Laka 1h 52S •' 555 Dayton St, Lynnwood p Edmonds, WA 98020 alderwood Manor Woodway��P Esperance Mountlake Terrace Lake BI Shoreline Forest Park Kenmore s:D SHEET 4 SITE LOCATION T I COVER SHEET CONTACTS CHRIS ATKINSON SUPERVISOR CABLECOM CHRIS.ATKINSON@CABLECOMLLC.NET 360.926.3437 AARON DIEDRICHS ENGINEER MANAGER WAECO ENGINEERING AARON@WAECOCONSTRUCTION.COM 425.327. 404 SITE INDEX 1 - COVER SHEET/SITE LOCATION 2-LEGEND 3 - GENERAL NOTES 4 - DESIGN VIEW 1 5 - SITE PHOTOGRAPHS SCOPE OF WORK: RISER DOWN UTILITY POLE ON NE CORNER OF 555 DAYTON ST. TIE IN TO EXISTING PEDESTAL ON NE CORNER OF 555 DAYTON ST. PROOF & PULL CATV CABLE ONTO PRIVATE PROPERTY. PROPRIETARY - NOT FOR DISTRIBUTIONI CLIENT FIRM7CABLECOMw PROJECT NUMBER: JB0000700815 I PERMIT NUMBER: ---- S30IAH3S13 our 3 SHEET # 1 OF 5 DRAWING NAME: G:\SHARED DRIVES\WAECO ENGINEERING SERVER\2021\1 - CUSTOM ERS\CABLECOM\SUILT\21586_EDMONDS — DAYTONST�rr_JB0000700815\ENG PRINTS-21\CADUB0000700815 CONSTRUCTION_PLANS.DWG �r;z , �-, r, A — ra—r-I DATE TECH ENG 425.327.6404 ORIGINAL 7/01/20 1 BLH AJD WAECO ENGINEER AARON DIEDRICHS AARON WAECOCONSTRUCTION.COM O 555 DAYTON ST Comcast 3; � CEO REV #0 ____ ____ 360.926.3437 LEGEND CableCom ENGINEERING Know what's below. REVIEWED - CABLECOMENGINEER CHRISATKINSON CHRIS.ATKINSON@CABLECOMLLC.NET EDMONDS, WA 98020 Call before you dig. AS -BUILT ---- ---- ---- LI N E YP L S ® RISER PB PULBOX - PROPOSED CONDUIT - EXISTING IN: 0 CONDUIT -PROPOSED #F OUT: 0 SEQUENTIAL CALLOUT BORE PIT O AERIAL FIBER - EXISTING c><0 STORAGE - EXISTING AERIAL FIBER - PROPOSED AERIAL FIBER - OVERLASH `,i PHOTO MARKER 0' #F TAIL: 0 SEQUENTIAL IN TAIL CALLOUT RIGHT OF WAY �� STORAGE - PROPOSED PARCEL BOUNDARY FM—] CATCH BASIN/INLET CURB EDGE OF PAVEMENT POLE ANCHOR/DOWN GUY - EXISTING TAIL: 0 FENCE XOX FIRE HYDRANT #F OUT: 0 SEQUENTIAL TAIL OUT CALLOUT GAS WATER I GROUND/BOND POLE ANCHOR/DOWN GUY - PROPOSED POLE OWNER NAME POLE NUMBER TAG NUMBER TELEPHONE d ADDITIONAL POLE TAG TAG NUMBER POLE TABLE/ ATTACHMENT CALLOUT UTILTY1 x'xx' ELECTRIC STREET LIGHT POST mw Imurc O ---►� SANITARY SEWER (SEW) PROPOSED DOWN GUY ON EXISTING ANCHOR I STORM DRAIN STREET LIGHT GRAVEL/ ROCK WALL CABLE TV PB PULLBOX - EXISTING STEAM OIL 0— TRAFFIC ARM/STOP LIGHT ° a UNKNOWN UTILITY FDP FIBER DISTRIBUTION PANEL - EXISTING ° SIDEWALK FIBER OPTIC 0 TREE TELECOMMUNICATIONS STA. 1 +00 — — STATION LINE BUSH FDP FIBER DISTRIBUTION PANEL - PROPOSED BRICK HEDGE SPLICE POINT - EXISTING r r r r WATER SYMBOL DESCRIPTION HDPE HIGH DENSITY POLYETHYLENE O MISC. UTILITY HH HANDHOLE ►� SPLICE POINT - PROPOSED \ \ JB JUNCTION BOX UTILITY POLE - EXISTING \ \ \ \ \ CONCRETE RESTORATION MH MANHOLE UTILITY CONTINUES MP MILE POST POLE - PROPOSED ASPHALT RESTORATION PVC POLY VINYL CHLORIDE RGS RIGID GALVANIZED STEEL CONDUIT �V VAULT - EXISTING UTILITY ENDS ROW RIGHT OF WAY ASPHALT OVER PCC RESTORATION STA. STATION �V VAULT - PROPOSED PD-## PEDESTAL -NUMBER VT-## VAULT -NUMBER P PEDESTAL - EXISTING LANDSCAPE RESTORATION UP-## UTILITY POLE -NUMBER ❑P PEDESTAL - PROPOSED PROPRIETARY - NOT FOR DISTRIBUTION ENGINEERING FIRM WAECO ENGINEERING PROJECT NUMBER: JB0000700815 PERMIT NUMBER: ---- S� SIaN �wlaJVd3C] a 2 OF 5 DRAWING NAME: G:\SHARED DRIVES\WAECO ENGINEERING SERVER\2021\1 - CUSTOM ERS\CABLECOM\BUILT\21586 EDMONDS DAYTONST JB0000700815\ENG PRINTS-21\CAD\JB0000700815 CONSTRUCTION PLANS.DWG t ZOZ LO Inf MIAPM71N DATE TECH ENG 425.327.6404 ORIGINAL( 7/01/20 1 BLH AJD WAECO ENGINEER AARON DIEDRICHS AARON WAECOCONSTRUCTION.COM O 555 DAYTON ST Ccomcast ��� 0 REV #0 ____ ____ 360.926.3437 GENERAL NOTES rmie...om ENGINEERING Know what's below. REVIEWED - CABLECOMENGINEER CHRISATKINSON CHRIS.ATKINSON@CABLECOMLLC.NET EDMONDS, WA 98020 Call before youdlg. AS -BUILT ---- ---- ---- 1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS: ---- CURRENT INTERNATIONAL BUILDING CODE (IBC) ---- 2016 WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION ---- WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN (CURRENT EDITION) 2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED OTHERWISE 3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS IN PROGRESS. 4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL GOVERNING AUTHORITY. 5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL ASBUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT APPROVAL. 6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION. 7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAWINGS. ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE. 8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES LOCATION SERVICE (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES. 10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS. 11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. 12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT. 13. SUBGRADE SOILS IN ALL AREAS WHERE RAIN GARDENS, INFILTRATION OR PERVIOUS PAVEMENT IS TO BE PLACED SHALL BE DELINEATED AND PROTECTED AT ALL TIMES FROM COMPACTIVE ACTIVITIES (i.e. HEAVY EQUIPMENT, STOCKPILING). 14. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL. IF SOIL IS DISTURBED, SOFT, LOOSE, WET OR IF ORGANIC MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL PER GEOTECHNICAL REPORT. 15. SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EXISTING SITE FEATURES. 16. SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS. FOUNDATION DRAINS SHALL BE INDEPENDENT OF OTHER SITE DRAIN LINES AND SHALL BE TIGHTLINED TO THE STORM DRAIN SYSTEM WHERE INDICATED ON THE PLANS. 17. ALL REQUIRED STORMWATER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER. 18. ALL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE. 19. ALL FOOTING DRAINS SERVING BUILDINGS, WALLS, ROCKERIES, ETC. SHALL CONNECT TO THE DRAINAGE SYSTEM DOWNSTREAM OF THE SITE STORMWATER DETENTION SYSTEM. 20. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS. 21. A SEPARATE IRRIGATION PERMIT MUST BE OBTAINED FROM THE CITY PUBLIC WORKS DEPARTMENT. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, PROVIDE TO THE CITY WATER QUALITY TECHNICIAN, A COPY OF THE BACKFLOW TEST REPORT. TEST REPORTS CAN BE FAXED TO 425-744-6057 OR EMAILED TO JEFF.KOBLYK@EDMONDSWA.GOV. BACKFLOW TESTING SHALL BE COMPLETED BY THE OWNER ANNUALLY THEREAFTER. 22. AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNED TO THE EQUIVALENT OF THEIR PRECONSTRUCTION CONDITION IN ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND STANDARDS. 23. ALL DISTURBED SOIL AREAS SHALL BE COMPOST AMENDED AND SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ONSITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS. 24. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL 25. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED. (PROPRIETARY - NOT FOR DISTRIBUTION PROJECT NUMBER: JB0000700815 I PERMIT NUMBER: ---- S30In113S 1N311d 13A30 SONOwa3,10 LISHEET # 3 OF 5 C13AI303U com ca st O able Om E N G I N E E R I N G QAORIGINAL Know what's below. DATE TECH ENG WAECO ENGINEER AARON DIEDRICHS 425.327.6404 AARON WAECOCONSTRUCTION.COM O 555 DAYTON ST EDMON DS WA 98020 e it PROJECT SHEET 7/01/20 1 BLH AJD REV #0 ---- 360.926.3437 CHRIS.ATKINSON@CABLECOMLLC.NET REVIEWED ---- ---- -- _ CABLECOM ENGINEER CHRIS ATKINSON Call before you dlg. AS -BUILT ---- ---- ---- lIPROPRIETARY - NOT FOR DISTRIBUTION DRAWING NAME: GASHARED DRIVES\WAECO ENGINEERING SERVER\2021\1 - CU MAIN ST PARCEL# 00434209700100 600 MAIN ST m PROJECT NUMBER: JB0000700815 I PERMIT NUMBER: ---- )815\ENG PRINTS-21\CADUB0000700815 CONSTRUCTION PLANS.DWG PARCEL# 0043d 117 6TH CONSTRUCTION NOTES O EXISTING COMCAST CONDUIT. PROOF CONDUIT PRIOR TO CONSTRUCTION AND PULL (1) CAN CABLE THROUGH. 2O EXISTING COMCAST PEDESTAL. PULL (1) CAN CABLE THROUGH. ® POTHOLE UTILITY CROSSINGS PRIOR TO BORE iSYMBOL CORRESPONDS TO PHOTO LOCATIONS AND ORIENTATION. PARCEL# 00434209700300 610 MAIN ST a M/ M/2J Mob SCALE: 1 4OF5 t ZOZ LO Inf n71 A 170171 M DATE TECH ENG 425.327.6404 Ccomcast ��0 ORIGINAL 7/01/20 1 BLH AJD WAECO ENGINEER AARON DIEDRICHS AARON@WAECOCONSTRUCTION.COM O 555 DAYTON ST„ SITE REV #0 360. �37 Om ENGINEERING Knawwhafsbelow. REVIEWED _ CABLECOM ENGINEER CHRIS ATKINSON CHRIS.ATKINSON@CAB@CABLECOMLLC.NET EDMON DS, WA 98020 PHOTOGRAPHS Call before youdlg. AS -BUILT ___- ---- ---- INUMET FACING NORTH ON WEST SIDE OF 6 AVE S lIPROPRIETARY - NOT FOR DISTRIBUTION DRAWING NAME: G:\SHARED DRIVES\WAECO ENGINEERING SERVER\2021\1 - CU i FACING WEST ON WEST SIDE OF 6TH AVE S PROJECT NUMBER: JB0000700815 I PERMIT NUMBER: ---- )815\ENG PRINTS-21\CADUB0000700815 CONSTRUCTION PLANS.DWG CONSTRUCTION NOTES O EXISTING COMCAST CONDUIT. PROOF CONDUIT PRIOR TO CONSTRUCTION AND PULL (1) CAN CABLE THROUGH. O EXISTING COMCAST PEDESTAL. PULL (1) CAN CABLE THROUGH. S30IA2J3S1N3AdPS*1EET # 5 OF 5 SCNOW03 d0 t110 I,ZOZ LO Inf