Loading...
Building Permit 2021Type: RETAINING WALL Subtype: COMMERCIAL RW I Status: ISSUED Parcel No: 00875400001200 Site Address: 21313 76TH AVE W 12 EDMONDS,WA 98026-7522 Subdivision: 008615, 004504, 008754, 005807, 008265 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $0.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: ROSE RIDGE CONDO- PIN PILE RETAINING WALL & DRAINAGE Applied: 4/5/2020 Issued: 8/3/2021 Final: Expiration Date: 1/30/2022 Issued by: NED WA State Contractor L & I #: 604 143 714 City of Edmonds Business License #: 602454996-001-0001 1 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT JOHN RUBENKONIG 8218 210TH PL SW, EDMONDS (206)491-9621 RUBENKONIGPLA@MSN.COM WA 98026 MILLENIUM LANDSCAPE 12914 72ND ST SE, SNOHOMISH CONTRACTOR CONSTRUCTION INC WA 98290 ALPINE MTG SVC INC, SEATTLE OWNER PIERCE ALEXANDER WA 98133 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 8/3/21 R13708 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 8/3/21 R13708 ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $330.00 $330.00 8/3/21 R13708 RETAINING WALL - SUB COM BLDG 001.000.322.10.000.00 $200.00 $200.00 8/3/21 R13708 PERMIT FEE RETAINING WALL - SUB COM BLDG 001.000.345.83.000.00 $170.00 $170.00 4/7/20 R4777 PLAN REVIEW FEE RETAINING WALL - SUB COM ENG 001.000.341.82.000.00 $200.00 $200.00 8/3/21 R13708 INSP FEE RETAINING WALL - SUB COM ENG 001.000.341.82.000.00 $170.00 $170.00 4/7/20 R4777 REVIEW FEE TOTALS: $1,135.00 $1,135.00 CONDITION TYPE STATUS NOTES Printed: Tuesday, August 03, 2021 12:50:54 PM 1 of 3 RETAINING WALL Permit PERMIT NUM City of Edmonds www.edmondswa.gov 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. Contractor/Owner shall be responsible for repair/replacement of all damage to utilities DAMAGE TO FRONTAGE FOR and/or frontage improvements in city right of way per city standards that is caused by or IMPROVEMENTS INFORMATION occurs during the permitted project. ESC REQUIRED FOR Maintain erosion & sediment control per city standards. NFORMATION INSPECTION PRIOR TO BACKFILL FOR Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. FOR PROJECT ASBUILT INFORMATION Special inspections have been called for on this project and are noted on the approved SPECIAL INSPECTION BUILDING FOR construction plans. It is the owner and or contractors responsibility to ensure that reports DIVISION INFORMATION are provided to the City on a weekly basis. UNDERGROUND UTILITY FOR Call for locates of underground utilities prior to any excavation. LOCATES INFORMATION INSPECTIONS - Schedule Online at: https://Inspection.MyBuildingPermit.com COMPLETED SEQID INSPECTION TYPE INSPECTOR RESULT NOTES DATE A-1 BUILDING PRECON B-2 RETAINING WALL B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" A-1 TESC AND MOBILIZE Printed: Tuesday, August 03, 2021 12:50:54 PM 2 of 3 Printed: Tuesday, August 03, 2021 12:50:54 PM 3 of 3