Building Permit 2021Type: RETAINING WALL Subtype: COMMERCIAL RW I Status: ISSUED
Parcel No: 00875400001200 Site Address: 21313 76TH AVE W 12 EDMONDS,WA 98026-7522
Subdivision: 008615, 004504, 008754, 005807, 008265 Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $0.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: ROSE RIDGE CONDO- PIN PILE RETAINING WALL & DRAINAGE
Applied: 4/5/2020
Issued: 8/3/2021
Final:
Expiration Date: 1/30/2022
Issued by: NED
WA State Contractor L & I #: 604 143 714 City of Edmonds Business License #: 602454996-001-0001 1
CONTACTS
NAME TYPE NAME
ADDRESS
PHONE
EMAIL
APPLICANT JOHN RUBENKONIG 8218 210TH PL SW, EDMONDS
(206)491-9621
RUBENKONIGPLA@MSN.COM
WA 98026
MILLENIUM LANDSCAPE 12914 72ND ST SE, SNOHOMISH
CONTRACTOR
CONSTRUCTION INC
WA 98290
ALPINE MTG SVC INC, SEATTLE
OWNER PIERCE ALEXANDER
WA 98133
FEE
INFORMATION
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT#
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
8/3/21
R13708
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
8/3/21
R13708
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$330.00
$330.00
8/3/21
R13708
RETAINING WALL - SUB COM BLDG
001.000.322.10.000.00
$200.00
$200.00
8/3/21
R13708
PERMIT FEE
RETAINING WALL - SUB COM BLDG
001.000.345.83.000.00
$170.00
$170.00
4/7/20
R4777
PLAN REVIEW FEE
RETAINING WALL - SUB COM ENG
001.000.341.82.000.00
$200.00
$200.00
8/3/21
R13708
INSP FEE
RETAINING WALL - SUB COM ENG
001.000.341.82.000.00
$170.00
$170.00
4/7/20
R4777
REVIEW FEE
TOTALS:
$1,135.00
$1,135.00
CONDITION TYPE
STATUS
NOTES
Printed: Tuesday, August 03, 2021 12:50:54 PM 1 of 3
RETAINING
WALL Permit
PERMIT NUM
City of Edmonds
www.edmondswa.gov
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
ALL BUILDING PERMITS
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections.
Contractor/Owner shall be responsible for repair/replacement of all damage to utilities
DAMAGE TO FRONTAGE
FOR
and/or frontage improvements in city right of way per city standards that is caused by or
IMPROVEMENTS
INFORMATION
occurs during the permitted project.
ESC REQUIRED
FOR
Maintain erosion & sediment control per city standards.
NFORMATION
INSPECTION PRIOR TO BACKFILL
FOR
Call for all required inspections. All work shall be inspected prior to backfill.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
FOR
PROJECT ASBUILT
INFORMATION
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
UNDERGROUND UTILITY
FOR
Call for locates of underground utilities prior to any excavation.
LOCATES
INFORMATION
INSPECTIONS - Schedule Online
at: https://Inspection.MyBuildingPermit.com
COMPLETED
SEQID
INSPECTION TYPE INSPECTOR
RESULT NOTES
DATE
A-1 BUILDING PRECON
B-2 RETAINING WALL
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
A-1 TESC AND MOBILIZE
Printed: Tuesday, August 03, 2021 12:50:54 PM 2 of 3
Printed: Tuesday, August 03, 2021 12:50:54 PM 3 of 3