Loading...
ENG2020-0460 ROW PERMITCONTACTS NAME TYPE NAME ADDRESS PHONE APPLICANT SNOHOMISH COUNTY PUD P.O. BOX 1107, EVERETT WA 98206 (425)670-3216 CONTRACTOR SNOHOMISH COUNTY PUD P.O. BOX 1107, EVERETT WA 98206 (425)670-3216 OWNER MCRAE JACK REVOCABLE LIVING TRUST 107 BELL ST UNIT 101, EDMONDS WA 98020 Description: PUD-PHASE 1 OF 4 TO CONVERT & REMOVE 6 POLES & WIRES ISSUED: 08/05/2021 Address: 107 BELL ST 101 EDMONDS WA 98020 EXPIRES: 02/05/2022 Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00793700010100 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00 ENGINEERING INSPECTION FEE $110.00 $0.00 ENGINEERING REVISION REVIEW FEE $110.00 $0.00 RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $0.00 STREET RESTORATION FOR WM INSTALLATION $7,000.00 $7,000.00 The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. INDEMNITY THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW RELEASED BY DATE REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street-cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED Printed: Thursday, August 05, 2021 12:48:28 PM 1 of 3 RIGHT OF WAY EUC PERMIT City of Edmonds 121 5th Ave N, Edmonds WA 98020 www.cityofedmonds.gov / 425.771.0220 PERMIT NUMBER ENG2020-0460 08/05/2021 1 of 2 CONDITIONS CONDITION TYPE NOTES ADJACENT PROPERTY Easement and/or permission from adjacent property owner is required prior to entry or work within an adjacent property. DAMAGE TO FRONTAGE IMPROVEMENTS It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in City right of Ways or Easements to City Standards caused by or occurring during the permitted project. ENGINEERING OTHER Alert affected residents and/or businesses prior to work start. Verify clear bore crossings. Restore landscape to like or better conditions. Call for required inspections as noted. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. SOUND OR NOISE Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. TRAFFIC CONTROL Traffic Control per approved plan and MUTCD. All Flaggers shall be certified. UTILITY LOCATES All utilities shall be located prior to any excavation. New locates shall be called for if at time of excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE COMPLETE RESULT NOTES X-2 ENGINEERING FINAL** E-7 TRAFFIC CTRL E-7 RESTOR LIMITS A-1 JOB START Printed: Thursday, August 05, 2021 12:48:28 PM 3 of 3 RIGHT OF WAY EUC PERMIT City of Edmonds 121 5th Ave N, Edmonds WA 98020 www.cityofedmonds.gov / 425.771.0220 PERMIT NUMBER ENG2020-0460 2 of 2 ROW PERMIT NO. : ENG___________ ISSUE DATE: ________________ RIGHT-OF-WAY CONSTRUCTION PERMIT APPLICATION PROJECT NAME: CONTACT: CONTRACTOR: Phone #: Mailing Address: Fax #: State License #: Email #: City Business License #: Liability Insurance Bonded ADDRESS OR INTERSECTION OF CONSTRUCTION: ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT: Commercial Subdivision City Project Traffic Control (Only) Multi-Family Single Family Other EUC (PUD, VERIZON, PSE, COMCAST, OVWSD): Is this permit part of a blanket permit? Yes No ANY ASSOCIATED PERMITS? BLD#____________ ENG#____________ DESCRIPTION OF PROPOSED WORK (Be Specific) : _________________________________________________________________________ WAS STREET OVERLAYED WITHIN THE LAST FIVE (5) YEARS? YES NO Year: PAVEMENT CUT: Yes No If yes, indicate size of cut: _________x_________ CONCRETE CUT: Yes No If yes, indicate size of cut: _________x_________ Phase 1 - OH to UG Richard Dumo 425-783-5110 rsdumo@snopud.com SNOPUD 1802 75th St SW, MS 02PO Box 1107, Everett 98206 107 Bell St., Edmonds WA 98020 This is Phase 1 of 4 to Convert and remove (6) Poles & Wires at Railroad Street. Phase 1 Scope: Bore conduit from Pole PLI 273802 to A-3307, Transfer OH transformer, Replace Bad Order Pole at PLI 364, Pull new 3 phase primary underground cables for new primary Loop for Waterfront. Any existing conduits already in the ground will be utilized, otherwise, new conduits will be bored in. Approx. Total: 30 Sq. Ft. (Includes Bore Pits on the concrete sidewalk and pavement) PUD WO #100061588 - Phase 1 2020-0460 RECEIVED 11/5/20 PHASES 1, 2, AND 4 INCLUDED IN THIS PERMIT PACKET (ENG2020-0460, -0461, AND -0502)8/5/21 RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (NUMBER OF MONTHS) Sidewalk 48 Hrs + LF X LF SF Alley 72 Hrs + LF X LF SF Parking 72 Hrs + LF X LF SF APPLICANT TO READ AND SIGN *Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. *Restoration is to be in accordance with City codes and Standards. All street-cut trench work shall be patched with asphalt or City approved material prior to the end of the workday – NO EXCEPTIONS. Indemnity: The Applicant has signed an application which states he/she hold the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including defense costs and attorney fees by reason of granting this permit. I have read the above statements and understand the permit requirements and acknowledge that I must follow all requirements in order for the permit to be valid. SIGNATURE DATE Contractor or Agent NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE 4 3 12x2=24 0 month 11/5/2020 BELL STSUNSET AV N2ND AV NPUBLIC UTILITY DISTRICT NO 1 SNOHOMISH COUNTY LOCATION ORDERDATE PROJECT ENGINEER PHONE CELLULAR 4/20/2021RICHARD DUMO 425-783-5110 425-346-8846 1. NOTE: FLAGGERS REQUIRED TO CONTROL TRAFFIC TRAFFIC FLOW TO ACCESS THE WORK SITE WITH MATERIALS OR EQUIPMENT. 2. ROAD BACK AND FORTH DURING CONSTRUCTION. FLAGGERS TO ASSIST PEDESTRIANS CROSSING THE 3. 7AM TO 5PM MONDAY TO THURSDAY WORK HOURS: CONE OR CHANNELIZING DEVICE LEGEND: SERVICE TRUCK/EQUIPMENT WORK AREA WHENEVER THE CREW MUST INTERRUPT LIMIT SPEED 25 30 35 200 200 350 A, B, C (FT) SPACING SIGN (FT) BUFFER 120 55 85 W20-7A TO STOP PREPARED BE W3-4 B A W20-1 AHEAD WORK ROAD B W20-4 AHEAD LANE ROAD ONE W20-7A TO STOP PREPARED BE W3-4 BA W20-1 AHEAD WORK ROAD B W20-4 AHEAD LANE ROAD ONE W20-7A TO STOP PREPARED BE W3-4 B A W20-1AHEAD WORK ROAD B W20-4AHEAD LANE ROAD ONE W20-7A TO STOP PREPARED BE W3-4 B A W20-1AHEAD WORK ROAD B W20-4AHEAD LANE ROAD ONE W20-7A TO STOP PREPARED BE W3-4 B A W20-1 AHEAD WORK ROAD B W20-4 AHEAD LANE ROAD ONE BELL ST SUNSET AV N2ND AV NFLAGGER PHASE 1 - OH TO UG SYSTEM IMPROVEMENT SUNSET AVE & BELL ST., EDMONDS WA 98020 100061588-30,60 NNORTH 9 TRAFFIC CONTROL PLAN PEDESTRIAN ROUTE RESUB May 03 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ENGINEERING DIVISION APPROVED AS NOTED __________________08/03/2021Jeff Whatmore Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. SCHEDULE ALL INSPECTION THROUGH MYBUILDINGPERMITS.COM RESTORATION TO BE DETERMINED BY CITY INSPECTOR SHEET OF SCALE DFTR ENGR APVD/DATE DATEORDEROPERATION 100005479 30 NTS RD RDUMO _______ 1 1 PUBLIC UTILITY DISTRICT NO 1 SNOHOMISH COUNTY PLANTER CURB TRAVEL LANE EDGE OF LOC. NEW POLE 16'ALLEY WAYBELL ST.SUNSET AVEDRIVEWAYPRIVATE10' BELL ST. "206-M" BELL ST. "107-M" PARKING LANE PARKING LANEPARKING LANESIDEWALKSIDEWALKNNORTHPLANTERPROP LINE CONDUITEXISTING OLD POLE LINE PROPERTYPRIVATE CURB TRAVEL LANE EDGE OF LOC. NEW POLE 16' 10' OLD POLE LINE PROPERTY PRIVATE BORE ROUTE 305' PROPOSED 5' 3' 8'PLANTERROW EDGE OF ROW EDGE OF - EXISTING WATER - EXISTING SEWER - EXISTING GAS LEGEND: ROUTE - PROPOSED BORE CONDUIT - EXISTING POWER IN W/ BORE ROUTE WHERE OTHER UTILITIES INTERSECT - EXPECTED POTHOLE LOCATIONS - EXISTING STORMDRAIN 4/7/21 DISTANCE FROM OTHER APPURTENANCES = 10' VERTICAL = AT LEAST 12" HORIZONTAL = AT LEAST 5 FEET (300V MAX) SEC SERV ELECT MAIN SEC ELECT HORIZ SEPARATIONVERT SEP (CROSSING) (300V MAX) SEC SERV ELECT PRIM ELECT MAIN SEC ELECT PRIM ELECTTYPE OF UTILITY LINE COMMUNICATION COMMUNICATION SERVICE HIGH PRESSURE GAS LOW PRESSURE GAS 6" 3" 6" 3" 12" 3" 6"0" 0"0" 0"0" 0" >=36" 12" 12" 0"0" 12" 12" >=36">=36" 12" 12" 0"6" 6" 6" 12" 6" 6" 6"6" 6" 6" 12" GAS SERVICE LIGHTING & ELECTRIC SUPPLY FROM OTHER UTILITIES MIN. DISTRICT CONDUIT CLEARANCE NOTE: SURVEYS PROVIDED BY CITY OF EDMONDS UTILITY LOCATIONS ARE BASED FROM LOCATES AND MINIMUM CLEARANCE FROM CITY UTILITIES: WALL STONE RETAINING 5' MAPLE TREE WALL STONE RETAINING PLANTER PLANTER CURB A-3307 PUD VAULT EXISTING (STORMDRAIN, WATER, SEWER) OTHER UTILITY LOCATION RESUB May 03 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT POTHOLE POWER SERVICE AT POLEBORING ROUTE PROPOSED IN LANDSCAPE STRIP (SEE ATTACHED PHOTOS) LEGEND: PRINTED FEES REQ'DPHASECIRCUIT NO SUBSTATION SECONADARY PRIMARY NEW SVCE APPLICATION# RECEIPT# WORK IN RIGHT OF WAY UGND NO APPROVED SCALE COMMERCIAL RESIDENTIAL RESIDENTIAL COMMERCIAL BASIC FEE $=$@FTLc BASIC FEE LEU# LEO# $@ =$ VAULT PERMIT BASIC FEE $ $ $ RT YES NO MISCELLANEOUS FEES TOTAL DUE DATE PAID cL FT @ $ $ $ $ $ $ =$ $=$@FTLc $ UNDERGROUND PLAT $@ $ SECONDARY UNDERGROUND $@ $ PRIMARY UNDERGROUND DATE WORK COMPLETED FOREMAN REASON FOR WORK POLE NO LOCATION DATE AREA ENGINEER DRAFTER ‚S PUBLIC UTILITY DISTRICT NO 1 SNOHOMISH COUNTY /'= /'= cL FT @ $ STREET LIGHTING =$ cL FT @ $=$ CROSSINGS PLAT CONSTRUCTION ENGINEERING DATE & $ ENGINEER PHONE CELLULAR VICINITY MAP ORDER OPERATION DATE SENT TO R/W E# DATE APPROVED JPN# ONE CALL DATE PRE-CONSTR REQUIREMENTS (DATE GRANTED) TREE TRIM TREE TRIM PUD LOCATOR BACKHOE POLE STENCILING FROM TO TAKE OFF POLE FOREIGN CONTACTS EASEMENTS REQUIRED NOT REQUIRED PERMITS CITY COUNTY STATE No. NESC VIOLATIONS NO YES (SEE NOTES) LOCATION MAP PAGE GIS GIS QC AS-BUILT JOINT USE STREET LIGHTING YES NO M&R GIS Ph M&R PRIMARY OVERHEAD LINE TO BE REMOVED PROPERTY LINE RIGHT-OF-WAY LINE NEW SECONDARY CONDUCTOR NEW TRANSMISSION LINE EXISTING TRANSMISSION LINE NEW DISTRIBUTION LINE EXISTING DISTRIBUTION LINE NEW POLE TO REPLACE EXISTING POLE NEW POLE EXISTING POLE-TO BE REMOVED EXISTING POLE JOINT TRENCH ZIPLY & CATV JOINT BORE ZIPLY & CATV CONSTRUCTION NOTES: A AT POLE PLI 364 N NORTH A NNORTH PROP. LINE CURB TO REMOVED EXISTING POLE SIDEWALK SIDEWALKGRASS LAWN GRASS 2ND AVE NGRASSBELL ST NTS SITE LAYOUT "107-M" (LOOKING NORTH)(LOOKING EAST) A A 321Ç273802 364 75-401271 BELL ST2ND AVE NÇ123 12-343 MAPLEWOOD SL-104517-C SL-109514-A BEFORE SCHEMATIC 321Ç273802 BELL ST2ND AVE NÇ12312-343 MAPLEWOOD SL-104517-C SL-109514-A AFTER SCHEMATIC 364 1 1 I I SL-104517-C SL-109514-A SL-108718-A 102 135-M 107-M 206-M-CDG 11-11-11/02321ÇA-21118 A-21119 66 6 273802365 364 $ $ $A9 FU15 FU80 ,, 25-355361 37-13974 75-5744 75-401271 ? ? C C G E BELL ST2ND AVE NNTS PLAN VIEW ,,, 75-401271 TO A-3307 TO PLI 365TO PLI 365 NOTE: BELL ST. & 2ND AVE N, EDMONDS WA 98020 LYNNWOOD PLI 364 SE 23 27 03 1/19/2021 100061588 30RDUMO RDUMO NTS REPLACE EXISTING BO POLE & INSTALL 3PHASE CIRCUIT BACKUP LOOP FOR EDMONDS WATERFRONT MAPLEWOOD 12-343 1,2,3 RICHARD DUMO 425-783-5110 425-346-8846 454-F5 EDMONDS 2. EXISTING SIDEWALK RAMP WILL BE CHANGED TO AN ADA RAMP. 1. UNDERGROUND 3PHASE WORK WILL BE ON #100061588-60. STMAIN 196TH ST SW 3RD AV N9TH AVS104 524 WOODWAY EDMONDS 88TH AV WSOUND PUGET WORK AREA,,FU15 FU15 FU80 @ PLI 364 12F303 with 12U308 UPDATED OH PLAN FOR EDMONDS PERMIT - 1/19/2021 1997-S5 TASK #60 BORE WORK ON UNDERGROUND INSTALLED ON TASK #60 *3Ì UNDERGROUND TERMINAL POLE ASSY (12U308) WILL BE REMOVE OLD POLE AND RELATED MATERIALS TRANSFER EXISTING LED LUMINAIRE FROM OLD POLE INSTALL NEW 8' STREET LIGHT MAST (L0503) INSTALL 3Ì 10' ARM TANGENT ASSY (12F303) INSTALL POLE GROUNDS (N0110) BELL ST. (PW1050) FROM THE EDGE OF TRAVELLED LANE ALONG AND SET WITH THE FACE OF THE POLE 10 FEET INSTALL 50' CLS1 POLE 16' WEST OF EXISTING POLE EXISTING 45' CLASS 2 BAD ORDER POLE PLI 364 LOCATION NEW POLE 10' EDGE OF TRAVELLED LANE 16' NE CORNER SUNSET & BELL LOOKING WESTBORING IN LANDSCAPE STRIPNORTH SIDE OF BELL NEAR SUNSET, LOOKINGEAST NE CORNER SUNSET & BELL PUD TO POTHOLE FOR POWER SERVICEFROM POLE AT ALLEY BETWEEN SUNSET AND2ND, IN ADDITION TO POTHOLING FOR ALLUTILITY CROSSINGS IN ALLEY. CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE: March 30, 2021 TO: Richard Dumo, Snohomish County PUD rsdumo@snopud.com jointuse@snopud.com FROM: Natalie Griggs, Engineering Technician engineeringpermits@edmondswa.gov RE: Application #: ENG2020-0460 and -0461 Project: PUD Phase 1 and 2 Waterfront Project Address: 107 Bell St, 102 Main St, Sunset Ave, Railroad Ave During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents including a written response to each item below. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.gov under Services/Permits and Development. March 30, 2021 Comments December 17, 2020 Comments CONSTRUCTION PLANS • March 30, 2021: 5’ horizontal separation from catch basins, manholes, etc. shall be sufficient if the boring location is verified per actual field locates. The City will require 10’ separation from bends in water main(s) or behind hydrants or water blowoffs. December 17, 2020: For all boring locations, show all underground utilities and appurtenances within the vicinity of the boring. Any new conduit shall maintain minimum utility separation—5’ horizontal, 1’ vertical, and at least 10’ from utility appurtenances. Please show that minimum separation requirements can be achieved on the plans. • Ok Phase 1 Application ENG2020-0460 Boring from new pole PLI 364 to vault A-3307: RESUB May 03 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Page 2 of 3 1) March 30, 2021: Partially addressed. Please show all underground utilities and services as they are located per actual field locates. Show potholing for all crossings. See attached survey at the corner of Sunset and Bell for reference. Ans: the potholes are the green dots as shown on the attached drawing below. The other utilities are drawn from the drawing you have sent and the intersections with the bore will be potholed. PH1 - OTHER UTILITIES.pdf December 17, 2020: Show all underground utilities and appurtenances between the pole at the corner of the 2nd Ave N on Bell St (PLI 364) and the vault (A-3307) at the northwest corner of Bell St and Sunset Ave. 2) March 30, 2021: Partially addressed. Please ensure that all surface features match field locates. See attached survey at the corner of Sunset and Bell for reference. Show all surface features as they are actually located in the proposed bore path, including the ROW line, sidewalk, curb-gutter, edge of pavement, trees, and any other surface features that may affect boring feasibility. Ans: the drawing below includes carefully drawn locations of bushes, maple tree, curb, sidewalk, edge of pavement, ROW, parking lane, private driveway, alley way, planter etc. along the bore route. I’m not a professional drafter but I tried my best to show all the items being asked for. Maybe you might need to zoom in enough to see a better detail. PH1 - OTHER UTILITIES.pdf 3) Ok 4) Ok 5) Ok – addressing under ENG2020-0476. New pole replacing BO pole PLI 364 at 2nd and Bell: 1) March 30, 2021: Procedure for payment from PUD to be discussed prior to issuance of permit. Ans: Beth Haskins has confirmed that the Accounts payable have paid to pay the City of Edmonds the $7,000 for the ADA Ramp. December 17, 2020: Removal and relocation of pole PLI 364 will require the installation of an ADA compliant ramp. Given the location of this ramp, the City will be requiring a specific bulb design for the new ADA ramp. The City will not be requiring PUD to install this ramp but will instead allow PUD to make payment to the City for a standard ADA ramp in the amount of $7,000. The City will only require PUD to remove the BO pole and to temporarily restore the ramp with asphalt until the City can install the specific ADA ramp at a later date. 2) March 30, 2021: The new pole location has been approved per clear zone requirements and per City’s future bulb out design. Ans: Thank you. December 17, 2020: The proposed new pole location does not meet clear zone requirements. Please verify that the property line is at the back of sidewalk. City records RESUB May 03 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Page 3 of 3 indicate that the property line may be further back from the back of sidewalk. If this is the case, please revise the plans to show the new pole at the back of sidewalk. 3) Ok 4) Ok Phase 2 Application ENG2020-0461 Boring on Sunset crossing Main St: 1) March 30, 2021: Partially addressed. Please show all underground utilities and services as they are located per actual field locates. Show potholing for all crossings. See attached survey at the corner of Sunset and Bell for reference. Ans: The attached survey does not apply for Sunset crossing and Main St. and your recent email (attached below) says that you do not have a survey that covers that intersection. Therefore, I have drawn the other utilities in that intersection based on actual locates that I have ordered and also from your Utility website. See the drawing below: RE_ PUD Phase 1 & 2 ROW Permit Apps ENG PH2 - OTHER UTILITIES.pdf December 17, 2020: Show all underground utilities and appurtenances between the pole at the northwest corner of Sunset and Main St (PLI 157897) and the vault (A-53757) on Railroad St. 2) March 30, 2021: Partially addressed. Please ensure that all surface features match field locates. See attached survey at the corner of Sunset and Bell for reference. Ans: As mentioned above on #1, the drawing below shows the location of Other Utilities based on painted locates. I have tried my best to draw bushes, tree, curb, sidewalk, edge of pavement, ROW, etc. along the bore route from the transformer to the corner of Sunset and Main St. PH2 - OTHER UTILITIES.pdf RESUB May 03 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Page 4 of 3 December 17, 2020: Show all surface features as they are actually located in the proposed bore path, including the ROW line, sidewalk, curb-gutter, edge of pavement, trees, and any other surface features that may affect boring feasibility. 3) Pole removal to be reviewed under ENG2020-502 for Phase 4. Phase 1 and 2 for undergrounding only. 4) Ok, to be reviewed under ENG2020-0502 for Phase 4. TRAFFIC CONTROL PLANS 1) Please resubmit all applicable traffic control plans for Phase 1 and 2 with the next plan resubmittal. Answer: Please see Traffic Control Plans (TCP) with Pedestrian Control Plan (PCP) for Phase 1 and Phase 2 below. EDMONDS TCP wd PCP - PH 2.pdf TCP wd PCP - PH 1.pdf 2) Will portions of the sidewalk need to be closed for the proposed work? If so, please provide pedestrian detour plans in addition to the vehicular traffic control plans with signage to divert pedestrians to cross at the nearest designated intersections. Answer: Please see Traffic control Plans with Pedestrian route included. TCP wd PCP - PH 1.pdf EDMONDS TCP wd PCP - PH 2.pdf 3) If revising the plans changes the location of work so that different traffic lanes or sections of sidewalk or parking need to be closed, please submit updated traffic control plans for review. Answer: The Plans for the bore route is not changing. The Traffic Control Plans above are going to be used. RESUB May 03 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT (SUPPLEMENT ANSWERS) (These are answers to the Phase 2 questions that were asked or included on the comments for Phase 4 dated April 16, 2021) February 5, 2021 Comments CONSTRUCTION PLANS 1.April 16, 2021: The boring plan from Sunset across Main St was submitted with Resub 2 for ENG2020-0460 and -0461 for Phase 1 and 2 of the underground project. a)The “Other Utility Location” plan shows the boring as a perpendicular crossing across Main St – this would be approved. The other plan sheet in this packet, however, shows the boring across Main St at an angle – this will not be approved. Please revise all plan sheets with parallel and perpendicular borings only. Ans: We already addressed that crossing being not so perpendicular on the phone when Jeff and I were at Main St. and you were on the other line. There is a Water meter that Jeff pointed out on that corner which will make a 90 degree crossing difficult. Maybe you just forgot that conversation already but Jeff agreed that the crossing is not a perfect 90 degree angle but close and it will miss the water meter. b) Two lines are shown on the “Other Utility Location” plan – the new boring in blue, and an existing power conduit in red. What is the proposed separation between the two? There are other utility companies proposing future work in the sidewalk in this location and it would preferred if these two conduits were as close as possible to leave room for future utility projects. Ans: Yes, we can have both our new electrical and existing as close as possible. accommodate other RESUB May 03 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Page 2 of 3 2.April 8, 2021: Northwest corner of Main and Sunset: a)The pole at northwest corner of Sunset and Main shall be removed, not topped to be a meter pole. Revise the plans accordingly. The City will coordinate with PUD outside of this permit to find a new location for this meter. Ans: The Overhead Pole removal plan has been revised. That plan is under Phase 4 but see a snapshot of the notes below. It says to “Pull out and remove existing pole”. b)What are the specifications for Ped #1 and Ped #2 shown next pole PLI 157897 (the pole to be removed)? Ans: The measurements of the 2 pedestals are below. c)What are the specifications for vault A-53758 shown behind Ped #1 and Ped #2? The lid of this vault will need to be pedestrian rated since it is in the sidewalk. Ans: The Vault lid will be a “Non-slip” type lid. See below. RESUB May 03 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Page 3 of 3 d)Why do both a vault and two pedestals need to be installed at this location? With this configuration, the entire width of the sidewalk will be occupied by PUD equipment and would limit any other utility companies from being able to install underground facilities in this area. Could this arrangement be consolidated? No. Please clarify. Ans: It is necessary to separate the Primary wires/connections from the secondary connections. It is a safety requirement /standard that we have to abide with. e)What power source will be feeding the streetlight at this corner? Will the new underground feed the streetlight or will PUD need a new source that is not shown on the plans? The City will need to review this if it is outside the scope of work that was submitted on the site plan. Ans: If the Streetlight at this corner is currently being fed by the overhead transformer located on that pole that is going away, one of the pedestals will be feeding the streetlight. 3.April 8, 2021: The plans are not to scale, so it is unclear how far the proposed conduit will be from City utilities. Please provide plans that are to scale and that show minimum separation requirements can be met. The conduit can be 5’ from City utilities and appurtenances but will need to be 10’ from any bends in City water mains or behind hydrants or blowoffs to provide sufficient space around blocking. Ans: See “Other Utility Location” drawing below. I cannot draw plans that are to scale without potholing the actual locations of the Utilities. The separation that is being asked for will be maintained horizontally and if there is no room, the conduit will maintain vertical separation. The included chart will be strictly followed by the contractor that will be doing the bore. RESUB May 03 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Page 4 of 3 February 5, 2021: For all boring locations, show all underground utilities and appurtenances within the vicinity of the boring. Any new conduit shall maintain minimum utility separation—5’ horizontal, 1’ vertical, and at least 10’ from utility appurtenances. Please show that minimum separation requirements can be achieved on the plans. a)Show all surface features as they are actually located in the proposed bore path, including the ROW line, sidewalk, curb-gutter, edge of pavement, trees, and any other surface features that may affect project feasibility. b)Please refer to the attached plan sheet for the Site Utilities Plan at Lift Station 8. TRAFFIC CONTROL PLAN b. The TCP for the work on Main St and Sunset/Railroad does not show sidewalk closures or pedestrian detours. Please revise the plans accordingly. Ans: Ans: See updated TCP w/ Pedestrian control plan below. c. The TCP that shows the work on Main and Sunset does not show any traffic control measures for the boring pit on north side of Railroad St. Please revise. Ans: See updated TCP w/ Pedestrian control plan below. February 5, 2021: Will at least a 5’-wide sidewalk remain open during the proposed work? If not, please ensure ADA accessibility during construction or provide a pedestrian detour plan to have pedestrians cross at the nearest designated crosswalks. Please update the traffic control plan accordingly. Ans: See updated TCP w/ Pedestrian control plan below. PH2 - OTHER UTILITIES.pdf TCP wd PCP - PH 2.pdf TCP wd PCP - PH 2.pdf TCP wd PCP - PH 2.pdf RESUB May 03 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT