Building Permit'SIDENTIAL BLDG Permit
PERMIT N UM
City of Edmonds
1
. ••� i
1 11
www.edmondswa.gov
Type: RESIDENTIAL BLDG
Owner/ Business: TODD GUTHRIE
Status: ISSUED
Subtype: DECK
Parcel No: 00567600000300 Site Address: 18724 84TH AVE W EDMONDS,WA 98026-5703
Applied: 1/17/2021
Subdivision: 004346, 005676
Lot: 0
Issued: 2/9/2021
Fire Sprinklers: Lot
Area: Zoning:
Final:
Valuation: $7,720.00 Occupancy Type: Construction Type: VB
Expiration Date: 8/9/2021
Code Edition: 2015 No. Stories: 0 # of Dwelling Units: 0
Issued by: NED
Scope of Work: GUTHRIE- 2 DECKS +STAIRS ALREADY BUILT **COD**
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
TODD GUTHRIE
18724 84TH AVE W, EDMONDS
(206)902-0100
T_GUTHRIE@OUTLOOK.COM
WA 98026
CONTACT
TODD GUTHRIE
18724 84TH AVE W, EDMONDS
(206)902-0100
t_guthrie@outlook.com
WA 98026
CONTRACTOR
OWNER
OWNER
J TODD GUTHRIE
18724 84TH AVE W, EDMONDS
(425)672-3390
WA 98020
INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
2/9/21
R10348
PER PERMIT
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$259.00
$259.00
2/9/21
R10348
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$220.15
$220.15
1/26/21
R9927
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
2/9/21
R10348
TOTALS: $525.65 $525.65
CONDITION TYPE
STATUS NOTES
Printed: Friday, March 12, 2021 9:11:06 AM 1 of 2
' Permit
PERMIT NUM
of Edmonds
EdmondsCity
••� iJIL 1 11
Wiwi,-. •. •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
ALL BUILDING PERMITS
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
FOR
Maintain erosion and sedimentation control per City and SWMMW standard
ESC REQ
INFORMATION
requirements.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND OR NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
FOR
All utilities shall be located prior to any excavation. New locates shall be called for if at
UTILITY LOCATES
INFORMATION
time of excavation, original locates are no longer identifiable.
• -• •
111
• •- • C • •'- •
COMPLETED RES
SEQID INSPECTION TYPE INSPECTOR
DATE
X-3 BUILDING FINAL"
Printed: Friday, March 12, 2021 9:11:06 AM 2 of 2