Loading...
roof height verificationBLID Zb7.6_ 0�.jS0 LI Lp EmmTerrane Donovan Akau City of Edmonds Building Department March 1, 2021 Terrane 10841 Main Street, Sulto 102, Bellevue, WA 98404 phone 425.458.4488 tax 425.67L0170 Www.terrane.net Re: Roof Height Verification - 20018 83rd Ave W., Edmonds, WA 98026 On 03/01/2021, I field verified the elevation of the ridge elevation of the new residence located at 20018 83rd Ave W., Edmonds, WA 98026. The elevation of the roof ridge is 435.73' (NAVD 88). A maximum roof elevation of 436.18 above sea level is indicated on the approved site plan for permit number BLD2020-0250, as approved by Donovan Akau on 07/06/2020. Regards, 4 4v"-t� Michael Merritt, PLS, CFeds Construction Survey Manager Roddy Yates <roddy@eakmanconstruction.com> RFI Evans House 20020 83rd Ave W Edmonds WA Roddy Yates <roddy@eakmanconstruction.com> To: Chris Bernards <chrisb@sideswayengineering.com> Mon, Mar 1, 6:00 AM Good morning, after checking our system. We do not have a RFI form in our system . I'll mention this to our office for the future. The inspector was fine with a email reply from you. If you don't mind that. This is time sensitive as well . If it is ok with you I will send you the questions in this email and if you could reply that would be great. Much appreciated. 1. HDU2 will have to be drilled at 12" in depth for retro fit /Epoxy 2. Can we use the H2.5T in lieu of H1s Thanks Chris and I hope this is will work for you [Quoted text hidden] Q _ Roddy Yates <roddy@eakmanconstruction.com> RFI Evans House 20020 83rd Ave W Edmonds WA Chris Bernards<chrisb@sideswayengineering.com> To: Roddy Yates <roddy@eakmanconstruction.com> Yes, the HDU2 can be post installed with a 12" embed and H2.5s work for the trusses. [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] Thanks and Much appreciated Error! Filename not specified. [Quoted text hidden] Mon, Mar 1, 8:24 AM