Re: Roof Height Verification - 20018 83rd Ave W., Edmonds, WA 98026
On 03/01/2021, I field verified the elevation of the ridge elevation of the new residence
located at 20018 83rd Ave W., Edmonds, WA 98026. The elevation of the roof ridge is
435.73' (NAVD 88).
A maximum roof elevation of 436.18 above sea level is indicated on the approved site
plan for permit number BLD2020-0250, as approved by Donovan Akau on 07/06/2020.
Regards,
4 4v"-t�
Michael Merritt, PLS, CFeds
Construction Survey Manager
Roddy Yates <roddy@eakmanconstruction.com>
RFI Evans House 20020 83rd Ave W Edmonds WA
Roddy Yates <roddy@eakmanconstruction.com>
To: Chris Bernards <chrisb@sideswayengineering.com>
Mon, Mar 1, 6:00 AM
Good morning, after checking our system. We do not have a RFI form in our system . I'll mention this to our office for the
future.
The inspector was fine with a email reply from you. If you don't mind that.
This is time sensitive as well . If it is ok with you I will send you the questions in this email and if you could reply that would
be great. Much appreciated.
1. HDU2 will have to be drilled at 12" in depth for retro fit /Epoxy
2. Can we use the H2.5T in lieu of H1s
Thanks Chris and I hope this is will work for you
[Quoted text hidden]
Q
_
Roddy Yates <roddy@eakmanconstruction.com>
RFI Evans House 20020 83rd Ave W Edmonds WA
Chris Bernards<chrisb@sideswayengineering.com>
To: Roddy Yates <roddy@eakmanconstruction.com>
Yes, the HDU2 can be post installed with a 12" embed and H2.5s work for the trusses.
[Quoted text hidden]
[Quoted text hidden]
[Quoted text hidden]
[Quoted text hidden]
[Quoted text hidden]
[Quoted text hidden]
[Quoted text hidden]
Thanks and Much appreciated
Error! Filename not specified.
[Quoted text hidden]
Mon, Mar 1, 8:24 AM