Building Permit 2021Type: COMMERCIAL BLDG Subtype: COM ALTERATION OR REPAIR I Status: ISSUED
Parcel No: 00580700000202 Site Address: 7300 213TH PL SW EDMONDS,WA 98026-7625
Subdivision: 005012, 005013, 008754, 008615, 007388, 007874, 004504,
Lot: 0
008265, 005807
Fire Sprinklers: Lot Area: Zoning:
Valuation: $104,079.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: PARK 212 APTS- FOUNDATION STABILIZATION, BUILDING B
Applied: 7/20/2021
Issued:8/12/2021
Final:
Expiration Date: 8/12/2022
Issued by: WAC
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 1
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
CHARLENE MARTINEZ
818 SW 142ND ST, BURIEN WA
(206)244-1023
CHARLENE@ROBBINSANDCO.COM
98166
ROBBINS & CO
818 SW 142ND ST, BURIEN WA
CONTACT
(206)244-1023
charlene@robbinsandco.com
HOUSEMOVING INC
98166
ROBBINS &CO
818 SW 142ND ST, BURIEN WA
CONTRACTOR
(206)244-1023
charlene@robbinsandco.com
HOUSEMOVING INC
98166
219 E GARFIELD ST 600, SEATTLE
OWNER
PARK 212 APT LLC
WA 98102
FEE •' •
DESCRIPTION
ACCOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00 $40.00
$40.00
7/21/21
R13545
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150 $25.00
$25.00
8/11/21
R13902
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00 $1,336.00
$1,336.00
8/11/21
R13902
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00 $1,135.60
$1,135.60
7/21/21
R13545
TOTALS: $2,536.60
$2,536.60
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, August 12, 2021 7:49:23 AM 1 of 2
•MERCIAL BLDG PermitCity
-
• • • •
98020 1 11
. •. •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
REQUIRED SPECIAL
FOR
INSPECTIONS
INFORMATION
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
SPECIAL INSPECTION REPORTS
FOR
Submit all special inspection reports to the City Building Official on a weekly basis.
NFORMATION
INSPECTIONS
-. •nline
at: https://Inspection.MVBuildingPermit.co
COMPLETED RESULT
SEQID INSPECTION TYPE
INSPECTOR
NOTES
DATE
A-1 BUILDING PRECON
B-5 BLDG SPECIAL
INSPECTION
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL**
Printed: Thursday, August 12, 2021 7:49:23 AM 2 of 2