Loading...
Building Permit 2020'SIDENTIAL BLDG Permit PERMIT NUM City of Edmonds wWA.edmondswa.gov Type: RESIDENTIAL BLDG Owner/ Business: SIMON J AND MARNE C EVANS Status: ISSUED Subtype: NEW SINGLE FAMILY Parcel No: 00431200000201 Site Address: 20018 83RD AVE W EDMONDS,WA 98026-6726 Applied: 2/27/2020 Subdivision: 004312 Lot: 0 Issued: 7/24/2020 Lot Area: 11,731 gross, 8,841 Fire Sprinklers: Yes Zoning: RS-8 Final: net Valuation: $399,945.88 Occupancy Type: R-3 Construction Type: VB Expiration Date: 7/24/2021 Code Edition: 0 No. Stories: 2 # of Dwelling Units: 1 Issued by: NED Scope of Work: EVANS- NEW SFR P&M INCL WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL SIMON J AND MARNE C 20020 83RD AVENUE W, APPLICANT SJEVANS242@GMAIL.COM EVANS EDMONDS WA98026 ARCHITECT CARL COLSON 23623 20TH AVE W, BOTHELL (425)806-3703 CARL@CARLCOLSONARCHITECT.COM WA 98021 CONTRACTOR EAKMAN CONSTRUCTION SEATTLE WA98115-2842 (206)972-2275 INFO@EAKMANCONSTRUCTION.COM COMPANY SIMON J AND MARNE C 20020 83RD AVENUE W, OWNER SJEVANS242@GMAIL.COM EVANS EDMONDS WA98026 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 - BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 7/24/20 R6589 PERMITS 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 7/24/20 R6589 PERMITS 2020 TRANSPORTATION IMPACT 112.502.345.86.000.00 $6,249.14 $6,249.14 7/24/20 R6589 FEE APPLIANCE VENTS 001.000.322.10.000.00 $30.00 $30.00 7/24/20 R6589 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 7/24/20 R6589 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $270.00 $270.00 7/24/20 R6589 TRAP ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $880.00 $880.00 7/24/20 R6589 FAN CONNECTED TO SINGLE DUCT 001.000.322.10.000.00 $75.00 $75.00 7/24/20 R6589 FURNACE OR FIREPLACE 001.000.322.10.000.00 $90.00 $90.00 7/24/20 R6589 GAS PIPING - NEW OR LOCATED 001.000.322.10.000.00 $30.00 $30.00 7/24/20 R6589 LETTER OR LEGAL COPY FEE 001.000.341.81.000.00 $11.10 $11.10 7/24/20 R6589 PARK IMPACT - ADMIN FEE RES 001.000.322.10.000.00 $50.00 $50.00 7/24/20 R6589 PARK IMPACT FEE - SINGLE FAMILY 332.100.345.85.000.00 $2,734.05 $2,734.05 7/24/20 R6589 PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $2,900.00 $2,900.00 7/24/20 R6589 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $2,465.00 $2,465.00 2/27/20 R4001 Printed: Friday, July 24, 2020 11:29:48 AM 1 of 3 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 7/24/20 R6589 STORMWATER GENERAL FACILITY 422.000.379.00.000.00 $799.00 $799.00 7/24/20 R6589 CHARGE SFR UNDER 5000 TRANSPORTATION IMPACT ADMIN 001.000.341.82.000.00 $50.00 $50.00 7/24/20 R6589 FEE - SFR WATER HEATER - TANKLESS 001.000.322.10.000.00 $15.00 $15.00 7/24/20 R6589 TOTALS: $16,794.79 $16,794.79 CONDITIONS CONDITION TYPE STATUS NOTES 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests ALL BUILDING PERMITS FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. FIRE FINAL INSPECTION FOR Request final Fire Department Inspection 425-775-0215. NFORMATION Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish FOR the datum point and the point of average grade. Call for inspections to verify. These items MAXIMUM HEIGHT INFORMATION must be consistent with the approved plan. If the proposed height of a building is within 12 inches of the maximum height permitted for the zone an elevation survey is required. Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. FOR At time of issuance: The water meter and side sewer permits still need to be paid for and OTHER INFORMATION issued. This will need to be done prior to work starting. FOR Not approved for an accessory dwelling unit. Accessory dwelling unit use requires PLANNING CONDITION INFORMATION separate land use approval. REQUIRED SPECIAL FOR INSPECTIONS INFORMATION IL INSPECTIONS - Schedule Online EEL- at: https://Inspection.MvBuildingPermit.com COMPLETED SEQID INSPECTION TYPE INSPECTOR RESULT NOTES DATE B-2 FND DAMPPROOFING B-2 FOOTINGS Printed: Friday, July 24, 2020 11:29:48 AM 2 of 3 'SIDENTIAL BLDG Permit City of • • • PERMITNUM 98020 BLD2020-0250 wwWA li7i-. •. B-2 FOUNDATION WALL B-2 SLAB INSULATION B-3 EXT WALL SHEATHING B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 PLUMB GROUND WK B-3 PLUMB ROUGH IN B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-3 WATER SERVICE LINE B-4 DRYWALL FASTENING B-4 FIRESTOPPING B-4 HEIGHT VERIFICATION B-5 BLDG SPECIAL INSPECTION B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP E-3 STRM FOOTING DRAIN A-1 BUILDING PRECON X-3 BUILDING FINAL" B-4 FRAMING A-1 TESC AND MOBILIZE E-3 STRM CONVEYANCE E-3 STRM FOOTING DRAIN E-3 STRM MGMT FACILITY E-3 STRM TIGHTLINE E-4 WATER SERVICE LINE E-5 DRIVEWAY SLOPE E-9 COMPOST AMEND X-2 ENGINEERING FINAL Printed: Friday, July 24, 2020 11:29:48 AM 3 of 3