Building Permit 2021Type: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED
Parcel No: 00409600100102
Subdivision: 004096
Fire Sprinklers:
Valuation: $125,000.00
Code Edition: 2018
Site Address: 507 3RD AVE S EDMONDS,WA 98020-4103
Lot: 0
Lot Area: 10,410
Occupancy Type: R3
No. Stories: 2
Scope of Work: INT REMODEL, DECK AND DECK COVER
Zoning: RS-6
Construction Type: VB
# of Dwelling Units: 1
Applied: 2/4/2021
Issued:8/12/2021
Final:
Expiration Date: 8/12/2022
Issued by: WAC
WA State Contractor L & I #: JOHNSSC921KZ City of Edmonds Business License #: 602454996-001-0001 1
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
GARY RAMM
5011 19TH AVENUE NE,
(206)524-4116
GARYRAMM77@GMAIL.COM
EDMONDS WA 98105
CONTACT
KADS CONSULTANTS LLC
10605 SE 240 ST 584, KENT WA
(425)572-6355
eallen@kadsconsultants.com
98031
CONTRACTOR
JOHNSON AND SONS
6618 MARINE VIEW DR,
(425)308-3961
CONSTRUCTION LLC
EDMONDS WA 98026
5011 19TH AVENUE NE,
OWNER
GARY & CHARLENE
RAMM
SEATTLE,WA, SEATTLE WA
(206)524-4116
98105
7DESCRIPTION
ACCOUNT COUNTAMOUNT
PAID
PAID DATE
RECEIPT#
1 - BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
8/12/21
R13926
PERMITS
1 - BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
8/12/21
R13926
PERMITS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
8/12/21
R13926
PER PERMIT
EACH PLUMBING FIXTURE ON ONE
001.000.322.10.000.00
$165.00
$165.00
8/12/21
R13926
TRAP
EACH VENT OR EXHAUST NOT
CONNECTED TO A HEATING OR AC
001.000.322.10.000.00
$45.00
$45.00
8/12/21
R13926
SYTEM
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$15.00
$15.00
8/12/21
R13926
FURNACE OR FIREPLACE
001.000.322.10.000.00
$30.00
$30.00
8/12/21
R13926
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$1,250.00
$1,250.00
8/12/21
R13926
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$467.50
$467.50
2/5/21
R10308
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
8/12/21
R13926
TOTALS: $2,119.00
$2,119.00
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, August 12, 2021 3:48:32 PM 1 of 3
'RESIDENTIAL
BLDG Permit
City of Edmonds PERMIT NUM
www.edmondswa.gov•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
CLEAR LANDINGS
FOR
CLEAR LANDINGS
NFORMATION
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
INSPECTIONS-.
•nline
at: https://Inspection.MyBuildingPermit.co
COMPLETED
SEQID
INSPECTION TYPE
INSPECTOR
RESULT NOTES
DATE
A-1 BUILDING PRECON
B-1 SETBACKS
B-2 FOOTINGS
B-3 ROOF SHEATHING
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
Printed: Thursday, August 12, 2021 3:48:32 PM 2 of 3
RESIDENTIAL BLDG Permit
PERMIT NUM
j City of Edmonds
121 5th Ave N, Edmonds WA 98020 BLD2021-0208
mi
www.edmondswa.gov / 425.771.0220
AAL A&L
-
' ..
--
B-3 MECH ROUGH IN
-
B-3 PLUMB ROUGH IN
--
B-3 ROOF SHEATHING
B-4 DRYWALL FASTENING
B-4 SHOWER PAN
-
:-7 BUILDING OTHER INSPX-3
-
BUILDING FINAL"
Printed: Thursday, August 12, 2021 3:48:32 PM 3 of 3