Loading...
REVIEWED BLD Engineers Report-1RECEIVED Mar302021 5,"D E 5WAY ENGINEERING 20305 87" Ave. W. Edmonds, WA 98026 (425)673-4160 May 13, 2019 Eugene Bolin 7330 172nd Street S.W. Edmonds, WA 98026 1 — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — 1 This document to remain on site for inspection _ Subject: Post Installed Anchors Structural Observation Site Name: Bolin Residence Address: 7330 172nd Street S.W. Edmonds Summary: Conforms Sidesway Engineering has completed our structural observation of the post -installed anchors installed at the aforementioned residence as part of shear wall upgrades required in the Sidesway calculation package dated 11/07/18. The southeast wall required (3) 5/8"o anchor bolts with a 7" embed and (2) 5/8"0 holdown anchors with a 12" embed into the existing concrete basement wall. We performed visual observation of the anchor installation in accordance with Section 1705.3 of the 2015 International Building Code. All threaded rod diameters were measured to be 5/8" and all hole diameters were measured to be 3/4". The depth of the anchor bolt holes was measured at 10" and the depth of the holdown anchor holes was measured at 14". All holes appeared to be clean of debris at the time of installation. Simpson Set-XP Epoxy Adhesive with an expiration date of 08/19/20 was used. The epoxy and anchors were installed accordance with the manufacturer's instructions. Our observation was performed on May 8th subject to the standard of care applicable to professional services and doesn't warrant or guarantee that all conditions were discovered. Please call if you have any questions or concerns related to our observations. Sincerely, Chris Bernards, PE, SE, LEED AP Principal of 113119 Bolin Residence Sidesway Project No. 16074.05