Building PermitPLUMBING
PERMIT NUM
City of Edmonds
'121 5th Ave N, Edmonds WA 98020 BLD2021-03314
www.edmondswa.gov
Type: PLUMBING Owner/ Business: HANNAH MANNING Status: ISSUED
Subtype: COMMERCIAL PLUMBING
Parcel No: 00688700300900 Site Address: 8723 238TH ST SW C-9 EDMONDS,WA 98026-8982
Applied: 3/5/2021
Subdivision: 004633, 006887, 010627 Lot: 0
Issued: 3/5/2021
Fire Sprinklers: Lot Area: Zoning:
Final:
Valuation: $0.00 Occupancy Type: Construction Type:
Expiration Date: 9/1/2021
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Issued by: JOK
Scope of Work: PLUMBING - REPLACE ELEC WATER HEATER
WA State Contractor L & I #: FASTWWH948BC City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE
NAME
ADDRESS I
PHONE
EMAIL
APPLICANT
HANNAH MANNING
11715 NORTH CREEK PARKWAY
(425)636-7054
HMANNING@FASTWATERHEATER.CO
SOUTH, BOTHELL WA 98011
M
CONTACT
FAST WATER HEATER
11715 NORTH CREEK PARKWAY
(425)636-7054
hmanning@FASTWATERHEATER.COM
COMPANY
SOUTH, BOTHELL WA 98011
CONTRACTOR
FAST WATER HEATER
11715 NORTH CREEK PARKWAY
(425)636-7054
hmanning@FASTWATERHEATER.COM
COMPANY
SOUTH, BOTHELL WA 98011
OWNER
RACHEL ECLAND
1415 N 200TH ST B6, SHORELINE
(206)819-6321
WA 98133
F�::::
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
1 -BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$0.00
PERMITS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$0.00
PER PERMIT
WATER HEATER - INCLUDING
001.000.322.10.000.00
$15.00
$0.00
EXPANSION TANK
TOTALS: $105.00 $0.00
CONDITION TYPE
STATUS I NOTES
Printed: Wednesday, March 24, 2021 1:18:33 PM 1 of 2
PLUMBING
PERMIT NUM
of Edmonds
EdmondsCity
98020 BLD2021-03314
www.edmondswa.gov/425.77
•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
Installation, use and maintenance of equipment and components shall be per
EQUIPMENT USAGE
FOR
manufacturer's specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufacture's installation instructions on site for Building Inspector.
INSPECTIONS - Schedule Online
at: https://Inspection.MyBuildingPermit.com
COMPLETED RESULT
SEQID INSPECTION TYPE INSPECTOR
NOTES
DATE
X-0 PLUMBING FINAL"
B-3 PLUMB ROUGH IN
Printed: Wednesday, March 24, 2021 1:18:33 PM 2 of 2