APPROVED BLD BLD2021-0847+Plumbing_Plan+6.17.2021_9.32.24_AM+2255295PLUMBING FIXTURE SCHEDULE
PLAN ID
PLUMBING FIXTURE/ DESCRIPTION
CW
HW
WASTE
VENT
VOLTAGE
F.L. AMPS
NOTES
S-1
REUSE EXISTING
112"
112"
2"
1-112"
S-2, S-3
BASIN: 12" SINK BOWLS AND FAUCET SUPPLIED BY OWNER
112"
112"
2"
1-112"
VACCUM
SYSTEM
TAG
LOCATION
PUMP VOLTAGE
AMPERAGE
MIN LINE VOLTAGE
MAX LINE VOLTAGE
EXHAUST VENT
MODEL
V-I
I MECHANCIAL ROOM
230 V SINGLE MOTOR
12 AMPS
208V CONSTANT
253V CONSTANT
2"
ECO-VAC
FIGURE 2. VACUUM LINE SIZING CHART
NUMBER OF
OPERATORIES
SEE NOTE
VACUUM LINE PIPE DIAMETER
PVC sch 40
COPPER TYPE "M"
1
1 1/4"
1"
2
1 1 P4'*
ill
3
1 1 /4"
1 1/4"
4
1 112''
1 1/2"
5
1 112"
1 1i2"
6
2„
1 1/2"
7
2"
1 1/2"
8
2"
1 1/2"
Friction Loss
Flow Rate
Material
Type
Max Velocity
Fluid
Density
Friction Loss
Flow Rate
Material
Type
Max Velocity
Fluid
Density
21.15
20
Copper
Type L
8
Water 68°F
62.28
Calculated
Input Required
PSI/100ft
GPM
rtts
Ibs/ft3
21.15
20
Copper
Type L
6
Water 68°F
62.28
Calculated
Input Required
PSI/100ft
GPM
ft/s
Ibs/ft3
PIPE SIZING CRITERIA
BRANCH PIPE SIZING CHART
PI PE SIZE
1/2"
3/4"
1"
1-1/4"
1-1/2"
2"
2-1/2"
3"
4"
GPM
6
12
21
31
44
77
119
170
299
FU -FV
14
36
137
358
699
1743
FU - FT
7
16
31
57
104
260
472
747
1743
Velocity
8.000
8.000
8.000
8.000
8.000
8.000
8.000
8.000
8.000
ID
0.545
0.785
1.025
1.265
1.505
1.985
2.465
2.945
3.905
OD
0.625
0.875
1.125
1.375
1.625
2.125
2.625
3.125
4.125
WT
0.040
0.045
0.050
0.055
0.060
0.070
0.080
0.090
0.110
Coeff Fric
1 0.022
1 0.021
1 0.020
1 0.020
0.019
1 0.018
1 0.017
1 0.017
1 0.016
PIPE SIZING CRITERIA
BRANCH PIPE SIZING CHART
PI PE SIZE
1/2"
3/4"
1"
1-1/4"
1-1/2"
2"
2-1/2"
3"
4"
GPM
4
9
15
24
33
58
89
127
224
FU -FV
7
17
69
192
412
1124
FU - FT
5
12
22
38
61
164
322
519
1124
Velocity
6.000
6.000
6.000
6.000
6.000
6.000
6.000
6.000
6.000
ID
0.545
0.785
1.025
1.265
1.505
1.985
2.465
2.945
3.905
OD
0.625
0.875
1.125
1.375
1.625
2.125
2.625
3.125
4.125
WT
0.040
0.045
0.050
0.055
0.060
0.070
0.080
0.090
0.110
Coeff Fric
1 0.022
1 0.021
1 0.020
1 0.020
0.019
0.018
1 0.017
1 0.017
10.016
APPROVED
PLANS MUST BE
ON JOB SITE
ALL WORK SUBJECT
TO FIELD
INSPECTION FOR
CODE COMPLIANCE
Overview of Intego
G H I E JO F
0
D C B A
A Patient chair* G Assistant element
B Double-jointed head support H Cuspidor bowl
C Pneumatic foot control I Water unit
D C+ electronic foot control J Power switch and external
E TS dentist element device connection
F CS dentist element
* Maximum load exerted by patient and accessories: 185 kg
Dentist element instruments
Position 1 Positions Position 4 Position 5 Additional tray
2,3 (only for TS)
Standard 3-
Turbine
Turbine
SiroSonic L
SiroCam
way syringe
AF
Sprayvit E
Motor BL E/
Motor BL E/
SiroCamAF
BL ISO E
BL ISO E
SiroSonic L
Assistant element instruments
Position 1 Position 2 Position 3 Position 4
Standard 3-
additional
Spray aspirator
Saliva ejector
way syringe
spray aspirator
Sprayvit E
Dentsply Sirona 3
City Of Edmonds
Building Department
Work PLUMBING
Address 7631 212TH ST SW 109C
Owner SCOTT BABIN DDS
Approved Date 6-29-2021
Building Official ; Eric, C 4-te'r
------------------------
-------------------
Permit Number BLD2021-0847
RECEIVED
Jun 18 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
0
BULLDOG
PLUMBING
8-- Design, LLC
121 23PD ST SE
PUYALLUP, WA 98372
PHc 253-922-1100
U
M
O
V1 �
C9
P O
03
V1
C
CID
�O
JOB NO: 548
DATE: 06/01/2021
DWN. BY: CCF
Revisions
No.
Description
Date
t
Prelim. Design
Set
6/10/2021
2
3
4
DRAWING
TITLE
SHEET NO.
P 1 0
CONNECT TO EXSTI N C
HOT AND COD WATER
SU PPLY N CRAWLSPACE
RECEIVED
Jun 18 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
0
BULLDOG
PLUMBING
8c Design, LLC
121 23PD ST SE
PUYALLUP, WA 98372
PH= 253-922-1100
U
M
C
�n
V L
b9
P C
VL
b9
CID
JOB NO: 548
DATE:
06/01/2021
DWN.
BY: CCF
Revisions
No.
Description
Date
1
Prelim. Design
Set
6/10/2021
2
3
4
DRAWING
TITLE
SHEET
NO.
P2.0