Building Permit 2021Type: RESIDENTIAL BLDG Subtype: ADDITION I Status: ISSUED
Parcel No: 00500900000302 Site Address: 15516 72ND AVE W EDMONDS,WA 98026-4013 Applied: 5/29/2020
Subdivision: 005009, SP S-16-87, LL-2009-01 Lot: 0 Issued: 8/18/2021
Fire Sprinklers: Lot Area: Zoning: Final:
Valuation: $35,065.80 Occupancy Type: Construction Type: Expiration Date: 8/13/2022
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED
Scope of Work: ESLHA - NAMKUNG- NEW PORTICO & ADDITION TO EXISTING GARAGE
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 1
CONTACTS
NAME TYPE NAME
ADDRESS
PHONE
EMAIL
APPLICANT
DOUG ENGELSON
2418 CALIFORNIA STREET C,
(425)252-9200
IMPRESSIONDESIGN@HOTMAIL.COM
EVERETT WA 98201
CONTACT
IMPRESSION DESIGN
2418 CALIFORNIA STREET C,
(425)252-9200
impressiondesign@hotmail.com
EVERETT WA 98201
CONTRACTOR
CONTRACTOR UNKNOWN
YONG & KEESOON
15516 72ND AVE W, EDMONDS
OWNER
(425)772-7978
NAMKUNG
WA 98026
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
8/18/21
R14080
PER PERMIT
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$220.00
$220.00
8/18/21
R14080
ESLHA MINOR PROJECT
001.000.322.10.000.00
$300.00
$300.00
6/22/20
R5878
ADMINISTRATIVE PROCESSING FEE
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$518.50
$518.50
6/22/20
R5878
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$200.00
$200.00
8/18/21
R14080
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
8/18/21
R14080
TOTALS: $1,285.00
$1,285.00
7
CONDITION TYPE
STATUS
NOTES
Printed: Wednesday, August 18, 2021 2:45:06 PM 1 of 3
'RESIDENTIAL
BLDG Permit
City of Edmonds PERMIT NUM
www.edmondswa.gov•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
ALL BUILDING PERMITS
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
As required by Ord 3632 the geotechnical engineer of record shall monitor this site during
construction for compliance with the recommendations in the geotechnical report
including site excavation, shoring, soil support for foundation, including piles, soil bearing
capacity, sub drainage installation, soil compactions, and other geotechnical aspects of
the construction. Specific recommendations contained in the approved geotechnical
report must be implemented by the owner. The geotechnical engineer shall make
written dated reports on the progress of the construction and submit the report to the
City on a weekly basis until all site grading, drainage, foundation and associated ground
work is complete. Omissions or deviations from the approved geotechnical report and or
approved plans or specs shall be highlighted and immediately submitted in a separate
letter to the City for review. The City shall be advised in writing of work stoppages of
FOR
more than one week. In addition to the geotechnical monitoring special inspections
ESLHA REPORTS
INFORMATION
based on the provisions of IBC Section 1704 are required when specified. Other special
inspections may also be required by the geotechnical engineer, architect, or structural
engineer of record. At the completion of final site grading and all permitted structures a
final geo technical report prepared by the geotechnical engineer shall be submitted to
the City. This report shall contain a statement that, based upon his/her professional
opinion, site observations, and testing during the monitoring of the construction, the
completed development substantially complies with the recommendations in the
geotechnical report and with all geotechnical related requirements. Any deviations or
omissions in the report, plans, or specifications that occurred during construction shall be
addressed separately. Occupancy, final approval, or release of the bond for the project
shall not be granted until the report has been reviewed and accepted by the Building
Official.
Approval of this foundation design is conditional subject to inspection of existing site soil
FOR
conditions. Retaining walls must be designed and constructed to resist the lateral
FOUNDATION BEARING
INFORMATION
pressure of the retained material. Provisions must be made for the control and drainage
of surface water around buildings.
Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees
to indemnify defend and hold harmless the City of Edmonds, Washington, its officials,
FOR
employees, and agents from any and all claims for damages of whatever nature, arising
HOLD HARMLESS
INFORMATION
directly or indirectly from the issuance of this permit. Issuance of this permit shall not be
deemed to modify, waive or reduce any requirements of any City ordinance nor limit in
any way the City's ability to enforce any ordinance provision.
Printed: Wednesday, August 18, 2021 2:45:06 PM 2 of 3
'RESIDENTIAL BLDG PermitCity
-
• • • •
ALIwww.edmondswa.gov
REQUIRED SPECIAL
FOR
INSPECTIONS
INFORMATION
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
FOR
SPECIAL INSPECTION REPORTS
Submit all special inspection reports to the City Building Official on a weekly basis.
NFORMATION
INSPECTIONS
- Schedule Online
at: https://Inspection.MvBuildingPermit.com
COMPLETED
RESULT
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
A-1 BUILDING PRECON
B-2 FOOTINGS
B-2 FOUNDATION WALL
B-3 EXT WALL SHEATHING
B-3 ROOF SHEATHING
B-4 DRYWALL FASTENING
B-4 FIRESTOPPING
B-4 FRAMING
B-S BLDG SPECIAL
INSPECTION
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
A-1 TESC AND MOBILIZE
X-2 ENGINEERING FINAL
E-5 ENG SPECIAL INSPECTION
APPROVED
Printed: Wednesday, August 18, 2021 2:45:06 PM 3 of 3