Building Permit 2021Type: RESIDENTIAL BLDG Subtype: DECK I Status: ISSUED
Parcel No: 00434209003300
Subdivision: 004342
Fire Sprinklers:
Valuation: $7,020.00
Code Edition: 0
Site Address: 711 ALDER ST EDMONDS,WA 98020-3416
Lot: 0
Lot Area: 6600 Zoning: RS-6
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: GREGORY- GUARDRAILS ON DECK
Applied: 6/18/2021
Issued:8/23/2021
Final:
Expiration Date: 8/18/2022
Issued by: NED
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 1
CONTACTS
L
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
JOSEPH GREGORY
711 ALDER STREET, EDMONDS
(206)356-2902
JOSEPHSGREGORY@GMAIL.COM
WA 98020
CONTACT
JOSEPH GREGORY
711 ALDER STREET, EDMONDS
(206)356-2902
josephsgregory@gmail.com
WA 98020
CONTRACTOR
OWNER
JOSEPH S & LIAW HEATH
711 ALDER ST, EDMONDS WA
OWNER
GREGORY
98020
INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT#
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
6/18/21
R12990
PER PERMIT
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$259.00
$259.00
8/21/21
R14169
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$220.15
$220.15
6/18/21
R12990
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
8/21/21
R14169
TOTALS: $525.65
$525.65
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Monday, August 23, 2021 8:45:11 AM 1 of 2
'RESIDENTIAL
BLDG Permit
City of Edmonds PERMIT NUM —
59
www.edmondswa.gov-
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
INSPECTIONS•• •nli
ne at: https://Inspection.MyBuildingPermit.co
COMPLETED RESULT
SEQID
INSPECTION TYPE INSPECTOR
NOTES
DATE
A-1 BUILDING PRECON
B-4 FRAMING
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
Printed: Monday, August 23, 2021 8:45:11 AM 2 of 2