Loading...
Building Permit 2021Type: SOLAR Subtype: SOLAR RESIDENTIAL I Status: ISSUED Parcel No: 00548900001602 Subdivision: 005489, 005560 Fire Sprinklers: Valuation: $0.00 Code Edition: 0 Scope of Work: SOLAR Site Address: 1037 GLEN ST EDMONDS,WA 98020-2948 Lot: 0 Lot Area: Zoning: Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Applied: 8/19/2021 Issued:8/23/2021 Final: Expiration Date: 2/23/2022 Issued by: WAC WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 1 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT JOSH PECK 18001 73RD AVE NE, KENMORE (425)233-7767 NWESJPECK@GMAIL.COM WA 98028 CONTACT NORTHWEST ELECTRIC AND 18001 73RD AVE NE, KENMORE (425)233-7767 nwesjpeck@gmail.com SOLAR WA 98028 CONTRACTOR NORTHWEST ELECTRIC 18001 73RD AVE NE, KENMORE (206)356-0601 nwesjpeck@gmail.com &SOLAR LLC WA 98028 SCOTT D & KENDRA 1037 GLEN ST, EDMONDS WA OWNER AN DERSO N 98020-2948 •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 8/23/21 R14180 PER PERMIT RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 8/23/21 R14180 SOLAR - SUB RES BLDG PERMIT FEE 001.000.322.10.000.00 $60.00 $60.00 8/23/21 R14180 SOLAR - SUB RES FIRE INSP FEE 001.000.342.40.000.00 $60.00 $60.00 8/23/21 R14180 TOTALS: $166.50 $166.50 CONDITION TYPE STATUS NOTES Printed: Monday, August 23, 2021 1:29:37 PM 1 of 2 - SOLAR' tA - JA� • • • • •:� i 1 � www.edmondswa.gov 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION Installation, use and maintenance of equipment and components shall be per EQUIPMENT USAGE FOR manufacturer's specifications, installation instructions, and applicable state codes. INFORMATION provide manufacture's installation instructions on site for Building Inspector. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION provide manufactures installation instructions on site for Building Inspector. ' •NS - Schedule •nline at: https://Inspection.MVBuildingPermit.co COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE X-1 FIRE FINAL X-3 BUILDING FINAL" Printed: Monday, August 23, 2021 1:29:37 PM 2 of 2