Loading...
ENG2021-0295 ROW PERMITOF WAY EUC PERMIT PERMITNUMBER, City of Edmonds EdmondsRIGHT 98020 1 1 ' www.cityofedmonds.gov Description: PUD-REMOVE A 12KV WIRE BETWEEN POLES & INSTALL SPAN GUY ISSUED: 08/24/2021 Address: 23819 78TH AVE W EDMONDS WA 98026-8821 EXPIRES: 02/24/2022 Permit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00559300000200 NAME TYPE NAME ADDRESS PHONE APPLICANT SNOHOMISH COUNTY PUD P.O. BOX 1107, EVERETT WA 98206 (425)670-3216 CONTRACTOR SNOHOMISH COUNTY PUD P.O. BOX 1107, EVERETT WA 98206 (425)670-3216 OWNER KURNIK SUZANNE M 23819 78TH AVE W, EDMONDS WA 98026 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00 RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $0.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW Q -1 �/� � 08/24/2021 RELEASED BY DATE Printed: Tuesday, August 24, 2021 12:58:53 PM 1 of 2 -KRWOF WAY EUC PERMIT City of • • • Edmonds•:• • 1 1 ' www.cityofedmonds. ov/425.771.0220 CONDITIONS CONDITION TYPE Easement and/or permission from adjacent property owner is required prior to entry or work within ADJACENT PROPERTY an adjacent property. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. Alert affected residents and/or businesses prior to work start. Verify clear bore crossings. ENGINEERING OTHER Restore landscape to like or better conditions. Call for required inspections as noted. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. TRAFFIC CONTROL Traffic Control per approved plan and MUTCD. All Flaggers shall be certified. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION MEN RESULT A-1 JOB START X-2 ENGINEERING FINAL" E-7 TRAFFIC CTRL Printed: Tuesday, August 24, 2021 12:58:53 PM 2 of 2 ENG2021-0295 of EpM04O� RIGHT OF WAY CONSTRUCTION RECEIVED PERMIT APPLICATION J U L 30 2021 Complete and submit this Application in accordance with the Submittal CITY OF EDMONDS /'Vc. i sa° Requirements outlined in Right -of -Way permit Handout E6�. DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A' instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A WO 100082324 General • Project Name Remove 12kV wire & install span guy Site Address or if no site address use Property Address at NW corner of project area: 23819 78th Ave W, Edmonds, WA 98026 Associated Permits: BLD N/A PLN N/A ENG N/A Owner and Entity Holding Name of Company Snohomish County PUD Franchise Ordinance No: N/A Point of Contact Daniel Luu Title Distribution Engineer Address PO Box 1107 City Everett State WA Zip 982o6 Phone (425)783-4174 Email dcluu@snopud.com &jointuse@snopud.com Contractor and Authorized Agent of Owner Name of Company Same as above (see note below) Contractor Contacts During Construction Primary Name Same as above Agent Name Title Title Mobile Address Email City State Zip Secondary Name Phone Title Email Mobile City of Edmonds Business License No: Email State License No: 313-005-741 ® Contractor verifies it is currently bonded ® Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as welt ® Traffic Control Only (no associated development) ❑ Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) The PUD needs to remove a 12kV wire between poles 287424 and 287433• Work is expected to take less than one business day. Northbound lane/shoulder closure needed at intersection of 238th St SW & 78th Ave W, as well as along 78th Ave W. Tree trimming is not needed. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF x LF SF N/A Alley 72 hours + LF x LF SF N/A Parking 72 hours + LF Ix I LF SF N/A SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable o power ❑ gas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes x No 2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? x If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? x 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? x 5. Does the work involve proposed additions to an aboveground utility stem? If es: x Are the additions for the purpose of serving new commercial development? x Are the additions for the purpose of serving a single-family residential subdivision? x Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the x project is proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing? 1 1 1 How many are to be added? o City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: X How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? 1 0 1 What is the height of the additionalpoles? 50' 6c. Are any poles to be modified/rebuilt/replaced? If yes: X How many? 1 2 1 What is the height of the poles after? 50' Describe the modification rebuild: Removing (i) span of wire and installing (i) overhead span guy wire SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: � ZZ" DATE: 7/29/2021 APPLICANT PRINTED NAME: Daniel Lim APPLICANT TITLE: Engineer NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 WORK ON SHOULDER OR PARKING LANE ROAD W20-1 WORK = AHEAD Q O O O O O ° Q' O w Ld ° m > Q o Cr O WQf = O L,J F— CL O o= a 00 O N I� ° Q s SHOULDER W21_5 WORK m ROAD s WORK W20-1 AHEAD SHOULDER OR PARKING LANE SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM LOCATION A SPEED LIMIT SIGN SPACING A, B,C (FT) BUFFER (FT) 25 200 55 30 200 85 35 350 120 40 350 170 45 1 500 220 50 500 280 55 500 335 Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. ENGINEERING DIVISION APPROVED AS NOTED LANE CLOSURE IN ADVANCE OF AN INTERSECTION (WORK AREA ON THE SIDE ROAD) ROAD W20-1 WORK AHEAD W20-1 4<- W 2 0 - 4= W 2 0- 7 A ROAD WORK AHEAD W2_ 0� A B STOP + ++ 7 7 238TH ST SW O O O STOP B A NO i TH BUFFER ROAD TAPER < LLJ WORK AHEAD W20-7A ° O 50' MIN O 100' MAX W20-1 > a • s ET W20-7A F m 00 ONE LANE i ROAD W20-4 AHEAD LOCATION B ROAD s WORK W20-1 AHEAD Jill UI1,.41, ,4az 08/24/2021VV RECEIVED J U L 30 2021 PUD CREWS TO MAINTAIN DRIVEWAY ACCESS FOR RESIDENTS DURING CONSTRUCTION. CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT =O PUBLIC UTILITY DISTRICT NO.1 OF SNOHOMISH COUNTY LOCATION 23901 78TH AVE W. EDMONDS, WA 98026 LYNNWOODAREA POLE NO. PLI 287433 SE1/4S 31 T 27 R 4 DATE 7/14/2021 ORDER 100082324 REASON FOR WORK REPLACE 12KV WIRE & INSTALL ENGINEER DCLUU OPERATION 0030 SPAN GUY Q PL1 287433 TO DRAFTER U.G. NO. PL1 287424 SCALE 1" = 100' APPROVED & DATE PRINTED DATE WORK COMPLETED FOREMAN FEES REQ'D ❑ YES ■ NO PRIMARY OVERHEAD ■ RESIDENTIAL ❑ COMMERCIAL LEO NO. SECONDARY OVERHEAD ENG AS -BUILT VERIFICATION DATE ❑ PHASING, TAPS & FUSING SUBSTATION BAL / RPK ❑ POLE & VAULT STENCILS ❑ CABLE TAGS CIRCUIT NO. 261/5217 PHASE 1 / 2 ❑ FRAMING ❑ EQUIPMENT LOCATION VERIFIED BY DATE NESC VIOLATIONS BASIC FEE E ■ NO ❑ YES (SEE NOTES) @$ .=s PERMITS (DATE GRANTED) ❑ TREE TRIM ❑ STATE METER/CONV. POLE 3 PRIMARY UNDERGROUND ❑ RESIDENTIAL ❑ COUNTY ❑ COMMERCIAL ■ CITY -- BASIC FEE S ❑ EASEMENTS LEU NO. @$ _� ❑ REQUIRED ■ NOT REQUIRED SECONDARY UNDERGROUND BASIC FEE DATE RELEASED @$ ._s UNDERGROUND PLAT FOREIGN CONTACTS ❑ JPN# BASIC FEE E ri FT.@S _$ ❑ JOINT TRENCH FRONTIER & CATV Cl JOINT BORE FRONTIER & CATV STREET LIGHTING FTADS =3 ❑ POLE STENCILING WORK IN RIGHT OF WAY FROM TO ❑ PRIMARY TAKE OFF POLE ❑ SECONDARY PRE-CONST. REQUIRMENTS ❑ TREE TRIM ❑ PUD LOCATOR ri FT.@S '=3 MISCELLANEOUS FEES ❑ BACKHOE ❑ FLAGGING VAULT 3 ❑ ONE CALL DATE PERMIT ;; No. STREET LIGHTING $ $ ❑ YES ■ NO 3 M&R AS -BUILT S GIS TOTAL DUE S DATE PAID GIS QC M&R GIS Ph JOINT USE RECEIPT N0, I LOCATION MAP PAGE 475 A2 SERVICE ORDER NO. FC;FNn: O EXISTING POLE X EXISTING POLE -TO BE REMOVED • NEW POLE NEW POLE TO REPLACE EXISTING POLE ENGR'S TEL. # 425-783-4174 ENGR'S CELL # 425-315-3529 1 AL N CONSTRUCTION NOTES O POLE PL1287433: - REMOVE DE -ENERGIZED #2ACSR PRIMARY AND NEUTRAL CONDUCTORS TO PLI 287424 - INSTALL (1) 3/8" PRIMARY SPAN GUY TO PLI 287424 (G0202) O POLE PLI 287424: - REMOVE DE -ENERGIZED #2ACSR PRIMARY AND NEUTRAL CONDUCTORS TO PLI 287433 - INSTALL (1) 3/8" PRIMARY SPAN GUY TO PLI 287433 (G0202) PLAN VIEW 1" = 100' 11/1A SCHEMATIC NTS BEFORE 37 TO BALLINGER CKT# 12-261 L 15• AFF25 O 40 15 \�D 25 TO RICHMOND PARK CKT* 12-2048 37 15 O 15 N.O. FU65 TO RICHMOND PARK llt"37 CKT 12-5217 AFTER 25 15• 37 F25 O TO BALLINGER 15 F40 CKT# 12-261 15 EBG-10 25 TO RICHMOND PARK 02 CKT# 12-2048 37 RECEIVED 15 0 15 J U L 30 2021 25 N.O. FU65 CITY OF EDMONDS TO RICHMOND PARK �j37 DEVELOPMENT CKT 12-5217 ` - SERVICES DEPARTMENT SHEET 1 OF 1 224TH ST SW 3 3 _ 3 �. > 3 N ¢ > > BALLINGER PARK GOLF 1 00 COURSE �* F- x cn ~ F o LAKE 236TH ST T) SW LA > 241ST T T 3 BALLINGER NILE x ST SW / COUNTRY o a CLUB , co 0 w 1 (l U 244TH ST — KIN G SW > COUNTS I— z w \z a L, (If ¢ �9! ! ftic11 h r RECEIVED JUL 30 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT SNOHOMISH COUNTY G�CMa) VICINITY MAP PUBLIC UTILITY DISTRICT NO 1 PROJECT REMOVE 12KV WIRE AND INSTALL SPAN GUY LOCATION 23819 78TH AVE W, EDMONDS, WA 98026 ENGINEER DANIEL LUU DATE 7/29/2021 ORDER 100082324 PHONE (425) 783-4174 CELLULAR (425) 315-3529