Loading...
APPROVED BLD BLD2020-0985 - 75% Form Revised 8-13-21Permit # BLD2020-0985 E b,N �y v REVISION Address: 640 Dayton Street Aug 15 2021 CITY OF EDMONDS DEVELOPMENT SERVICES Home Owner: Soleta, Mark DEPARTMENT Contractor: Rian Hayward / Cascade General Contracting This form may be used to help establish the percentage of demolition work performed to an existing home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing home's replacement cost, the structure will be required to be rebuilt to the standards of new construction. Replacement cost of existing home $ 488,000 How was the value determined? NAHB Standards & Insurance Replacement Value Component Value of Existing Component Percentage removed Replacement cost of removed component Notes Foundation 57,584 0% 0 Floor Framing 29,280 50% 14,640 Floor Insulation 9,760 85% 8,296 Wall Framing 19,520 71% 13,859 Wall Insulation 8,296 71% 5,890 Siding 31,720 100% 31.720 Roof Framing 19.520 100% 19,520 Attic Insulation 8,296 100% 8,296 Windows 19,520 85% 16,592 Doors 17,568 80% 14,054 Plumbing 24,400 75% 18,300 Electrical 22,936 85% 19,496 HVAC 23,424 10% 2,342 Drywall 17,568 77% 13,627 Cabinets 22,448 80% 17,958 Painting, Flooring and Finishes 34,648 80% 27,718 Deck 5.856 100% 5,856 Other 115,656 75% 86,742 Total 488,000 324,808 % of total removed Owner Contractor of Removed equals Total of Column 4 divided by Full Replacement cost' equals 67% % Date -5113 1 2 a Z .Date 63 ! G'e-)Z