APPROVED BLD BLD2020-0985 - 75% Form Revised 8-13-21Permit # BLD2020-0985
E b,N
�y
v REVISION
Address: 640 Dayton Street Aug 15 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
Home Owner: Soleta, Mark DEPARTMENT
Contractor: Rian Hayward / Cascade General Contracting
This form may be used to help establish the percentage of demolition work performed to an existing
home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing
home's replacement cost, the structure will be required to be rebuilt to the standards of new
construction.
Replacement cost of existing home $ 488,000
How was the value determined? NAHB Standards & Insurance Replacement Value
Component
Value of
Existing
Component
Percentage
removed
Replacement cost
of removed
component
Notes
Foundation
57,584
0%
0
Floor Framing
29,280
50%
14,640
Floor Insulation
9,760
85%
8,296
Wall Framing
19,520
71%
13,859
Wall Insulation
8,296
71%
5,890
Siding
31,720
100%
31.720
Roof Framing
19.520
100%
19,520
Attic Insulation
8,296
100%
8,296
Windows
19,520
85%
16,592
Doors
17,568
80%
14,054
Plumbing
24,400
75%
18,300
Electrical
22,936
85%
19,496
HVAC
23,424
10%
2,342
Drywall
17,568
77%
13,627
Cabinets
22,448
80%
17,958
Painting, Flooring
and Finishes
34,648
80%
27,718
Deck
5.856
100%
5,856
Other
115,656
75%
86,742
Total
488,000
324,808
% of total
removed
Owner
Contractor
of Removed equals Total of Column 4 divided by Full Replacement cost' equals 67% %
Date -5113 1 2 a Z
.Date 63 ! G'e-)Z