ENG2021-0303 ROW PERMITRIGHT OF
WAY EUC PERMIT
PERMITNUMBER,
City
of Edmonds
•
••� 1 1 111
www.cityofedmonds.gov
Description: PSE-REPLACE GAS SERVICE
ISSUED: 08/25/2021
Address: 19622 82ND PL W EDMONDS WA 98026-6412
EXPIRES: 02/25/2022
it Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00595000002700
W
I 11-14111 a
NAME TYPE NAME
ADDRESS PHONE
APPLICANT PSE/INFRASOURCE
1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353
CONTRACTOR PSE/INFRASOURCE
1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353
OWNER TOWNSEND LORENZO L
17551 WALLINGFOR AVE N, SHORELINE WA 98133
FEE INFORMATION
DESCRIPTION
AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT
$40.00 $0.00
RIGHT OF WAY MINOR - EUC PERMIT FEE
$110.00 $0.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
Q W, �el_ � 08/25/2021
RELEASED BY DATE
Printed: Wednesday, August 25, 2021 9:20:12 AM 1 of 2
-KRWOF WAY EUC PERMIT
PERMIT NUMBER
City of • • •
Ave•:• • 1 1 1
www.cityofedmonds. ov/425.771.0220
CONDITIONS
CONDITION TYPE
Easement and/or permission from adjacent property owner is required prior to entry or work within
ADJACENT PROPERTY
an adjacent property.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
Alert affected residents and/or businesses prior to work start.
Verify clear bore crossings.
ENGINEERING OTHER
Restore landscape to like or better conditions.
Call for required inspections as noted.
ESC REQ
Maintain erosion and sedimentation control per City and SWMMW standard requirements.
Sound/Noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND OR NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites/activities must comply with the noise limits
of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
TRAFFIC CONTROL
Traffic Control per approved plan and MUTCD. All Flaggers shall be certified.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
RESULT
INSPECTION MEN
A-1 JOB START
X-2 ENGINEERING FINAL"
Printed: Wednesday, August 25, 2021 9:20:12 AM 2 of 2
of pMO4O�
ENG2021-0303
E
RIGHT OF WAY CONSTRUCTION RECEIVED
PERMIT APPLICATION
Aug 04 2021
Complete and submit this Application in accordance with the Submittal CITY OF EDMONDS
DEVELOPMENT SERVICES
/'V . i s')3 Requirements outlined in Right-of-Wgy permit Handout E6�. DEPARTMENT
If any field is not applicable to your project, write "N/A' instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General •
Project Name 109138309
Site Address or if no site address use Property Address at NW corner of project area: 19622 82nd PL W
Associated Permits: BLD PLN ENG X
Owner and Entity Holding Franchise (if applicable)
Name of Company PSE/Infrasource Franchise Ordinance No:
Point of Contact Susan Sid ick
Title SR Permit Specialist
Address 1660 Park lane
city Burlington
State WA
Zip 98233
Phone 425-457-6353
Email susan.sidickapse.com
Contractor and Authorized Agent of Owner
Name of Company
(see note below)
Contractor Contacts During Construction
Primary Name PSE/Infrasource Susan Sidick
Agent Name PSE/Infrasource
Title SR Permit Specialist
Title SR Permit Specialist
Mobile 425-457-6353
Address 1660 Park lane
Email susan.sidick@pse.com
City Burlington
State WA
Zip 98233
Secondary Name
Phone 425-457-6353
Title SR Permit Specialist
Email susan.sidick@pse.com
Mobile
City of Edmonds Business License No:
Email
State License No: INFRASL871 C2
[N Contractor verifies it is currently bonded
d( Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ixSingle family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as welt
❑ Traffic Control Only (no associated development)
❑ Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
To replace 3/4 gas service at approx 276' S c/I of 196th ST SW & 20' W c/I of 82nd PL W (1) 4x6 grass
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
I x
LF
SF
Alley 72 hours +
LF
Ix
I LF
SF
Parking 72 hours +
LF
Ix
I LF
SF
1-2 days
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable ❑ power r* gas
❑ water ❑ sewer ❑ storm
Details of Work to be Completed
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
x
2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
x
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
x
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
x
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
x
Are the additions for the purpose of serving new commercial development?
x
Are the additions for the purpose of serving a single-family residential subdivision?
x
Details
of Work to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
x
6a.
Does your project involve wires/cables/lines? If yes:
x
How many are existing? I I How many are to be added?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
x
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
X
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: Susan Sidick DATE: 08/04/2021
APPLICANT PRINTED NAME: Susan Sidick
APPLICANT TITLE: SR Permit Specialist
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
Job #: 109138309
Proj Rcvd Date: 07/20/21
Jurisdiction: Edmonds
Right of Way Permit? 711 YES ❑ NO
First Poss Start: 15D
First Poss Comp: 15D
PRE -INSPECTION REPORT R..�gE.tVED
Aug 04 2021
Address: 19622 82nd PI W CITY OF EDMONDS
City / Zip: Edmonds 98026 DEPARTMENT HVICES
Customer: Liana Widjaja
Cust. Email:
PM / Insp: Tanya Martinson
206-928-1547
425-417-0639
Job Description / Scope of Work:
iService Replacement 1
Est. Job Duration: 8-16hrs
NEW CONST.-
Replace 3/4" STW service with 1-1/8" PE or 5/8" PE. Possible CP short; if not, may be able to
❑ YES 0 NO
insert 5/8" PE into 3/4" STW.
IFS / PSE Dig
Call John Rockford (206) 255-2704 when complete.
Service Work - Yes Stub Ftg: 10 Ext Ftg:
78 Tot Svc Ftg: 88'
Main Ext Work - No
PLAT MAP# 162 069 FIELD INSPECT-M.I.W.ON:
07/22/21 BY: Dave Nichols
360-913-3739
NOT TO SCAL
196TH ST SWOWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
C/L — — ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY - • -- N
UTILITIES
MAY REQUIRE A SEPERATE
PERMIT.
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
N�rn
I
Na
NV
00
/
ooQoASPHpwAV
�0000
/ 1
78, o00000
: 0 5
Applicant shall repair/replac
damage to utilities or front
7O,
improvements in City right-o
/U
SCHEDULE ALL INSPECTIONS THROUGH P/L
1
per city standards that is cau,
�� occurs during the permitted p
MYBUILDINGPERMIT.COM
1
82ND PL W WAS OVERLAYED IN 2019. IF
wl a ®
I ENGINEERING DIVISIO
PAVEMENT CUTS ARE NEEDED CUT FEES AND
wl
I APPROVED AS NOTE[
RESTORATION SHALL BE REQUIRED.
CIO Q
i ^jell W441M+04z 08/24i
RESTORATION LIMITS TO BE DETERMINED BY
VV
CITY ENGINEERING INSPECTOR
,
0 60' ROW
Work Location
Size of Cut
I Surface Type_
276' S of CL 196th St SW & 20' W of CL 82nd PI W
4x6
Grass
of CL &
of CL
of CL &
of CL
❑✓ FLAGGERS #: 2 25 MPH ❑ TROLLEY LINES ❑ BUS STOP #:
❑ METER HOODS #:
❑OFFICERS M SPEED LIMIT ❑ TRAFFIC
❑ ARTERIAL
❑ NO PARKS #:
WORK TYPES
Pipe Size EFV
Meter (Q, tY.
Pressure
Misc Meter Stuff
❑ COMMERCIAL [—]STUB ❑POTHOLE
❑ 1/2" ❑ 775
❑ EXTENSION ❑ MAIN MAINT.
❑✓ RESIDENTIAL
❑ 5/8 ❑ 1800
❑ 3/4"
❑ 250
❑ 6"wc
❑ Tempi Bar Size:
❑ COMPLETE
SVC MAINT.
❑ MULTI -FAMILY ❑TWIN ❑
❑ 2600
❑ 11/8�
42
❑ 5
❑ 2#
❑ Bollards 2.5" M
❑ 11/4" ❑ 10,000
❑ NEW CONST. ❑ ALTER COMM SVC ❑ VALVE MAINT.
❑ 2" ❑ N/A
❑ 630
❑ 5#
❑Bollards 4" #:
❑ ALTER RESID. SVC LEAK REPAIR
❑
❑ 4
❑ 6
❑ 1000
Li Fuel Line Permit
Fuel Line Length:
❑ CUT & CAP ❑ SERVICE REPL.
❑ CP WORK
❑ 8"
I Mtr Loc:
03
Fuel Line Diameter:
all
Ige
-way
,ed or
-oject.
1
2021
TEMPORARY TRAFFIC CONTROL PLAN
19622 82nd PI W
Edmonds
WA 98026
USA
RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Edmonds standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
8. Work area for 19622 82ND PL W, will be at 276'
South of centerline of 196TH ST SW, and at 20'
West of centerline of 82ND PL W.
W3-4 —
"V3HV
O
I
O
O
ad3H`d
� ad08
3Nt/13NO
� I
0 13
O
I
o
�V •
0
sss e
Orb aN e��,
b
OM01 o
•
•
0
0
Q
O
N
o
I O
0
O
13
'NE LANE p
ROAD c�
AHEAD
WORK
AHEAD
SIGN SPACING
MPH
"X"
60/65
1000,
45/55
500,
35/40
350'
30
200'
25
100'
O
N
E
RECEIVED
Aug 04 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
CHANNELIZATION
DEVICE SPACING
MPH
TAPER
TANGENT
55/70
40
80
35/45
30
60
25/30
20
40
LEGEND
®
28" TRAFFIC CONE
®
WORK PIT
TRAFFIC FLOW
FLAGGER
WORK VEHICLE/
II
FLASHING LIGHTS
SIGN LOCATION
RIGHT OF WAY
NOW
Puget Sound Energy REV
PUGET Designer: Traffic Control SupeMsor:
Gregory Harwood 08/03/2021 0
SOUND MATLOCK HIGHBARGER Card No.012238
ENERGY 808-375-4152 Card ry.hamood@ps Job #
g regory. ha rwood@pse. com
MATLOCK.HIGHBARGER@PSE.COM (425)424-642 � 109138309
Project Address:
19622 82ND PL W, EDMONDS, WA Page 1 OF 1
8224
1
3/4" STW-U
1963
19628
8220
2�Os
3/4" ST
1963
3/4" STW
1963
33jS
No electric grid information available
S 160068,
07-20-2021
The information on the attachetl maps is subject to change without notice. Puget Sound Energy makes no warranty. expressed or implied concerning
the sui}ability of this infonnafion for any purpose. Recipien}agrees to not disclose this confide%Information to any o}her person orentity.
unless authorized in writing by Puget Sound Energy. This map is not to be used for tletermining the actual location of any PSE facilities (call 811)."
24,s
19601
19621
3/4" STW-U
1963
3/4" STW-U
1963
19627
Scale 1:450
Lat\Long=47.8209,-122.3445
OD
1962
1960
3/4" ST
1962
1961
1962
3/4" ST
1962
3/4" ST L7\`
1962
1962
Aug 04 2021
DEVELOPMENT SERVICES
DEPARTMENT
QPUGET SOUND ENERGY