Building Permit 2021Type: RESIDENTIAL BLDG Subtype: NEW SINGLE FAMILY I Status: ISSUED
Parcel No: 00484500703100
Subdivision: 004845
Fire Sprinklers:
Valuation: $395,669.01
Code Edition: 2018
Site Address: 729 LAUREL ST EDMONDS,WA 98020-4027
Lot: 0
Lot Area: 9,894
Occupancy Type: R3
No. Stories: 2
Scope of Work: GREY SEA LLC- NEW SFR P&M INCL
Zoning: RS-6
Construction Type: VB
# of Dwelling Units: 1
Applied: 4/26/2021
Issued:8/27/2021
Final:
Expiration Date: 8/22/2022
Issued by: NED
WA State Contractor L & I #: LZLCOI*085BA City of Edmonds Business License #: 602454996-001-0001 1
ji CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
MEREDITH KELLY
1148 NW LEARY WAY, SEATTLE
(206)258-5243
MEREDITH@DEFORESTARCHITECTS.0
WA 98107
OM
CONTACT
DEFOREST ARCHITECTS
1148 NW LEARY WAY, SEATTLE
(206)258-5243
meredith@deforestarchitects.com
WA 98107
CONTRACTOR
LZL CONSTRUCTION
10604 E RIVERSIDE DR, BOTHELL
(206)371-6737
JAMES@LZLCONSTRUCTION.COM
WA 98011
66 S HANFORD ST, SEATTLE WA
OWNER
GREY SEA LLC
98134
•' •
DESCRIPTION
11'BASE
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
8/26/21
R14316
PERMITS
1 - BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
8/26/21
R14316
PERMITS
AIR CONITIONING SYSTEM OR HEAT
001.000.322.10.000.00
$50.00
$50.00
8/26/21
R14316
PUMP - 1.75 BTU OR LESS
AIR HANDLERS - 10,000 CFM OR
001.000.322.10.000.00
$30.00
$30.00
8/26/21
R14316
LESS
APPLIANCE VENTS
001.000.322.10.000.00
$30.00
$30.00
8/26/21
R14316
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
5/6/21
R12199
PER PERMIT
EACH PLUMBING FIXTURE ON ONE
001.000.322.10.000.00
$210.00
$210.00
8/26/21
R14316
TRAP
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$990.00
$990.00
8/26/21
R14316
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$75.00
$75.00
8/26/21
R14316
PARK IMPACT - ADMIN FEE RES
001.000.322.10.000.00
$50.00
$50.00
8/26/21
R14316
PARK IMPACT FEE - SINGLE FAMILY
332.100.345.85.000.00
$2,734.05
$2,734.05
8/26/21
R14316
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$2,876.00
$2,876.00
8/26/21
R14316
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$2,444.60
$2,444.60
5/6/21
R12199
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
8/26/21
R14316
Printed: Friday, August 27, 2021 12:03:29 PM 1 of 4
DESCRIPTION
ACCOUNT AMOUNT
PAID PAID DATE
RECEIPT #
STORMWATER ENGINEER REVIEW
001.000.341.82.000.00
$130.00
$130.00
8/26/21
R14316
FEE
WATER HEATER - INCLUDING
001.000.322.10.000.00
$15.00
$15.00
8/26/21
R14316
EXPANSION TANK
WATER SERVICE LINE - REPAIR OR
001.000.322.10.000.00
$15.00
$15.00
8/26/21
R14316
REPLACEMENT
TOTALS: $9,796.15 $9,796.15
CONDITIONS
CONDITION TYPE
STATUS
NOTES
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
FOR
CARBON MONOXIDE SYSTEMS
CARBON MONOXIDE SYSTEMS
NFORMATION
Pre -inspection required. Street to be cleaned of debris. Side sewer must be capped at
DEMOLITION REQUIREMENTS
FOR
property line. Water Service must be disconnected from Water Meter and or hose bib
INFORMATION
with AVB installed. Dump at approved dump site only.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
FIRE FINAL INSPECTION
FOR
Request final Fire Department Inspection 425-775-7720.
NFORMATION
Approval of this foundation design is conditional subject to inspection of existing site soil
FOR
conditions. Retaining walls must be designed and constructed to resist the lateral
FOUNDATION BEARING
INFORMATION
pressure of the retained material. Provisions must be made for the control and drainage
of surface water around buildings.
GAS PIPE TEST
FOR
Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted
NFORMATION
Printed: Friday, August 27, 2021 12:03:29 PM 2 of 4
'RESIDENTIAL BLDG Permit
PERMIT NUM
City of Edmonds
121
. •:� i 1 1 •
. •. •
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
FOR
HOSE BIBBS
Hose Bibbs are required to have a permanently affixed anti -siphon device installed.
NFORMATION
LOT LINES STAKED
FOR
Lot line stakes must be in place at the time of foundation setback inspection.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Final approval on a project or final occupancy approval must be granted by the Building
OCCUPANCY
FOR
Official prior to use or occupancy of the building or structure. Check the job card for all
INFORMATION
required City inspections including final project approval and final occupancy inspections.
-PLANTING PLAN PROVIDED IN CRITICAL AREA REPORT DATED JULY 16, 2021 IS REQUIRED
TO BE INSTALLED IN ACCORDANCE WITH THE REPORT.
FOR
PLANNING CONDITION
INFORMATION
-ONGOING MONITORING REQUIRED AS PROVIDED IN CRITICAL AREA REPORT DATED
JULY 16, 2021.
FOR
Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water
PRV REQUIRED
INFORMATION
shutoff.
FOR
Heat pumps, AC units and similar equipment greater than 36 inches in height are not
SIDE YARD EQUIPMENT
INFORMATION
allowed within required building setbacks.
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND OR NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
Installer shall provide the manufacturer installation, operating instructions, and a whole
WHOLE HOUSE FAN
FOR
house ventilation system operation description. A label shall be affixed to the whole
INFORMATION
house timer control that reads "Whole house ventilation, see operating instructions".
INSPECTIONS
- Schedule
Online
at: https://Inspection.MvBuildingPermit.com
COMPLETED
SEQID
INSPECTION TYPE
INSPECTOR
RESULT NOTES
DATE
A-1 BUILDING PRECON
B-2 DEMO AMT
VERIFICATION
B-2 FOOTINGS
B-2 FOUNDATION WALL
B-2 SLAB INSULATION
B-3 EXT WALL SHEATHING
B-3 GAS PIPING TEST
B-3 MECH ROUGH IN
B-3 PLUMB ROUGH IN
B-3 ROOF SHEATHING
Printed: Friday, August 27, 2021 12:03:29 PM 3 of 4
RESIDENTIAL BLDG PermitCity • • • • 98020 1 1 •
www.edmondswa.gov
E%L
B-3 UNDERFLR FRAMING
B-4 DRYWALL FASTENING
B-4 FRAMING
B-S INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
X-1 PLANNING FINAL
A-1 TESC AND MOBILIZE
E-3 STRM FOOTING DRAIN
E-3 STRM TIGHTLINE
E-4 STRM STUB CONNECT
E-4 WATER SERVICE LINE
E-5 DRIVEWAY SLOPE
E-9 COMPOST AMEND
E-9 PROJECT ASBUILTS
X-2 ENGINEERING FINAL
A-1 ENGINEERING PRECON
Printed: Friday, August 27, 2021 12:03:29 PM 4 of 4