Loading...
Building Permit 2021Type: RESIDENTIAL BLDG Subtype: DECK I Status: ISSUED Parcel No: 27032400223500 Subdivision: 004635, 004186 Fire Sprinklers: Valuation: $10,680.00 Code Edition: 2018 Site Address: 1036 8TH AVE N EDMONDS,WA 98020-2657 Lot: 0 Lot Area: 13,068 Zoning: RS-12 Occupancy Type: Construction Type: VB No. Stories: 0 # of Dwelling Units: 0 Scope of Work: MCQUIRE- UPPER DECK Applied: 6/21/2021 Issued:8/30/2021 Final: Expiration Date: 8/25/2022 Issued by: NED WA State Contractor L & I #: BENNEI*984NG City of Edmonds Business License #: 602454996-001-0001 1 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT KRISTIN HANSON 652 ALDER STREET, EDMONDS (425)774-7129 HANSONDESIGN@HOTMAIL.COM WA 98020 CONTACT HANSON DESIGN 652 ALDER STREET, EDMONDS (425)774-7129 hansondesign@hotmail.com WA 98020 BENNETT CONSTRUCTION, 16506 68TH AVE W, CONTRACTOR INC. LYNNWOOD WA 98037- OWNER ANGIE MCQUIRE 1036 8TH AVE N, EDMONDS WA (425)431-6167 98020-2657 •' 1 • OM por DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 6/21/21 R13026 PER PERMIT PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $301.00 $301.00 7/12/21 R13460 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $255.85 $255.85 6/21/21 R13026 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 7/12/21 R13460 TOTALS: $603.35 $603.35 CONDITION TYPE STATUS NOTES Printed: Monday, August 30, 2021 11:28:32 AM 1 of 2 'RESIDENTIAL BLDG Permit C-A - �1. I City • • • • 98020 1 1:. . •. • Ah 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE B-2 FOOTINGS B-4 FRAMING X-3 BUILDING FINAL" Printed: Monday, August 30, 2021 11:28:32 AM 2 of 2