RFI in field changes2132.k " "Alt
DOWEL HORIZONTAL FOOTING AND
STEM WALL REINF INTO EXISTING
FOUNDATION W/ HILTI
HIT-HY200 EPDXY AND 4" MIN EMBED y
D0.1LL&EPDXY HORIZ
`-' REINF INTO EXIST FOOTING
i+ W/ HILTI NIT-HY ZOO
` I S'-6' LONG x 2'-9" WIDE • 1'-0" DEEP EPDXY & 4" EMBED, TYP
/ FTG REINF W/ R4 @ 12' TRANSVERSE
/i & (3) R4 LONG WAY TOP & BOT
1'-O" z 1'-0" GRADE
ARROW INDICATES BEAM W/ (2) #4 TOP
.,..�,� BATTERED PILE DIRECTION AND BOTTOM, TYP
F3 F2
Ai'
PARTIAL FOUNDATION PLAN
SCALE: 1/8" = 1'-0"
19
Al'
2'-0f1 0 2'-0" 4'-0-1
may: S M. TI
4 of WAs.r����
�IonT L
07/ I5;` 21
ENGINEERING
ALOBAIDI RESIDENCE
18416 OLYMPIC VIEW DR
EDMONDS, WA 98020
DATE 07/15/21
SHEET
PROJECT NO. 21081-10
SCALE AS NOTED
250 4TH AVE. S.. SUITE 200
EDMONDS, WASHINGTON 98020
PHONE (425) 778-8500
FAX (425) 778-5536
TIT-E
PARTIAL FOUNDATION PLAN
.i ! REFER TO CL , REV #1
DRAWN BY LVW
S S _ 1
CHECKED BY LMS
APPROVED By DMT
FUJI UAIL. 1/'-/'"LL NAML: SS-1
2( - 7_171
COLUMN PER PLAN
(4) #3 TOTAL CLOSED TIES,
(3) LOCATED WITHIN TOP 5"
OF PILASTER
EXIST PATIO
0
w _
i N
p- U
W N
w
1z
cr
c+') U
Al
T.
PL 5/8" x 12 x V-0"
W/ (4) 3/4" 0 x V-10"
THREADED ROD, TYP
1" NON -SHRINK GROUT
W/ LEVELING NUTS
1'-4" x 1'-4" CONCRETE
PILASTER
1/2" EXPANSION
MATERIAL TYP
•at I�
!I II
00 0� o o� 00 i 00 00 00 00 00 00
II II
• • Oil II• •
it II
II II
II II
II II
• • •II II• •
SECTION
SCALE: 1" = V-0"
SIZE & REINF
PER PLAN & SCHED
#4 BARS @ 12"
OC TOP & BOT
EA WAY
0%l!5i 21
ENGINEERING
250 4TH AVE. S., SUITE 200
EDMONDS, WASHINGTON 98020 ;
PHONE (425) 70
FAX (425) 778-55368-5536it
ALOBAIDI RESIDENCE
18416 OLYMPIC VIEW DR
EDMONDS, WA 98020
DATE 07/15/21
SHEET
SS-2
PROJECT NO. 2108t.10
SCALE AS NOTED
DRAWN BY LVW
TITLE
SECTION DETAIL
'REFER TO 8 S4.1, REV 1
CHECKED BY LMS
APPROVED BY 0MT
YLUI UAIG: '/' /" 11U, NA61L: n-L