Loading...
RFI in field changes2132.k " "Alt DOWEL HORIZONTAL FOOTING AND STEM WALL REINF INTO EXISTING FOUNDATION W/ HILTI HIT-HY200 EPDXY AND 4" MIN EMBED y D0.1LL&EPDXY HORIZ `-' REINF INTO EXIST FOOTING i+ W/ HILTI NIT-HY ZOO ` I S'-6' LONG x 2'-9" WIDE • 1'-0" DEEP EPDXY & 4" EMBED, TYP / FTG REINF W/ R4 @ 12' TRANSVERSE /i & (3) R4 LONG WAY TOP & BOT 1'-O" z 1'-0" GRADE ARROW INDICATES BEAM W/ (2) #4 TOP .,..�,� BATTERED PILE DIRECTION AND BOTTOM, TYP F3 F2 Ai' PARTIAL FOUNDATION PLAN SCALE: 1/8" = 1'-0" 19 Al' 2'-0f1 0 2'-0" 4'-0-1 may: S M. TI 4 of WAs.r���� �IonT L 07/ I5;` 21 ENGINEERING ALOBAIDI RESIDENCE 18416 OLYMPIC VIEW DR EDMONDS, WA 98020 DATE 07/15/21 SHEET PROJECT NO. 21081-10 SCALE AS NOTED 250 4TH AVE. S.. SUITE 200 EDMONDS, WASHINGTON 98020 PHONE (425) 778-8500 FAX (425) 778-5536 TIT-E PARTIAL FOUNDATION PLAN .i ! REFER TO CL , REV #1 DRAWN BY LVW S S _ 1 CHECKED BY LMS APPROVED By DMT FUJI UAIL. 1/'-/'"LL NAML: SS-1 2( - 7_171 COLUMN PER PLAN (4) #3 TOTAL CLOSED TIES, (3) LOCATED WITHIN TOP 5" OF PILASTER EXIST PATIO 0 w _ i N p- U W N w 1z cr c+') U Al T. PL 5/8" x 12 x V-0" W/ (4) 3/4" 0 x V-10" THREADED ROD, TYP 1" NON -SHRINK GROUT W/ LEVELING NUTS 1'-4" x 1'-4" CONCRETE PILASTER 1/2" EXPANSION MATERIAL TYP •at I� !I II 00 0� o o� 00 i 00 00 00 00 00 00 II II • • Oil II• • it II II II II II II II • • •II II• • SECTION SCALE: 1" = V-0" SIZE & REINF PER PLAN & SCHED #4 BARS @ 12" OC TOP & BOT EA WAY 0%l!5i 21 ENGINEERING 250 4TH AVE. S., SUITE 200 EDMONDS, WASHINGTON 98020 ; PHONE (425) 70 FAX (425) 778-55368-5536it ALOBAIDI RESIDENCE 18416 OLYMPIC VIEW DR EDMONDS, WA 98020 DATE 07/15/21 SHEET SS-2 PROJECT NO. 2108t.10 SCALE AS NOTED DRAWN BY LVW TITLE SECTION DETAIL 'REFER TO 8 S4.1, REV 1 CHECKED BY LMS APPROVED BY 0MT YLUI UAIG: '/' /" 11U, NA61L: n-L