Building Permit 2021Type: PLUMBING Subtype: COMMERCIAL PLUMBING I Status: ISSUED
Parcel No: 00735400230400 Site Address: 1220 6TH AVE S B304 EDMONDS,WA 98020-4643
Subdivision: 005391, 007354, 007364, 006569, 006465 Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $0.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: PLUMBING -WATER HEATER
Applied: 7/29/2021
Issued:7/29/2021
Final:
Expiration Date: 1/25/2022
Issued by: NED
WA State Contractor L & I #: FASTWWH948BC City of Edmonds Business License #: 602454996-001-0001 1
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
HANNAH MANNING
11715 NORTH CREEK PARKWAY
(425)636-7054
HMANNING@FASTWATERHEATER.CO
SOUTH, BOTHELL WA 98011
M
CONTACT
FAST WATER HEATER
11715 NORTH CREEK PARKWAY
(425)636-7054
hmanning@FASTWATERHEATER.COM
COMPANY
SOUTH, BOTHELL WA 98011
CONTRACTOR
FAST WATER HEATER
11715 NORTH CREEK PARKWAY
(425)636-7054
hmanning@FASTWATERHEATER.COM
COMPANY
SOUTH, BOTHELL WA 98011
OWNER
JOHN D S BROOKES
1220 6TH AVE S B304,
(425)778-2718
EDMONDS WA 98020-4643
DESCRIPTION
71BASEcFEE
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.007/29/21
R13684
MIT
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
7/29/21
R13684
PER PERMIT
WATER HEATER - INCLUDING
001.000.322.10.000.00
$15.00
$15.00
7/29/21
R13684
EXPANSION TANK
TOTALS: $105.00
$105.00
• 0 •
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, July 29, 2021 4:48:26 PM 1 of 2
Permit
City of Edmonds PERMIT NUM
EdmondsPLUMBING
98020 1 1
www.edmondswa.gov
•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
FOR
In addition to the required pressure relief valve an approved listed expansion tank shall
EXPANSION TANK
INFORMATION
be installed on all hot water tanks per UPC 608.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
provide manufactures installation instructions on site for Building Inspector.
L INSPECTIONS - Schedule Online
at: https://Inspection.MvBuildingPermit.com
COMPLETED RESULT
SEQID INSPECTION TYPE INSPECTOR
NOTES
DATE
B-3 PLUMB ROUGH IN
X-0 PLUMBING FINAL"
Printed: Thursday, July 29, 2021 4:48:26 PM 2 of 2