Building Permit 2021Type: MECHANICAL Subtype: COMMERCIAL MECHANICAL I Status: ISSUED
Parcel No: 00610700202002
Subdivision: 006107
Fire Sprinklers:
Valuation: $0.00
Code Edition: 0
Site Address: 10200 EDMONDS WAY EDMONDS,WA 98020
Lot: 0
Lot Area: Zoning: WMU
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: PAGLIACCI-MECHANICAL-ROOF TOP UNITS
Applied: 8/18/2021
Issued: 9/7/2021
Final:
Expiration Date: 3/7/2022
Issued by: WAC
WA State Contractor L & I #: EMMAA1055BL City of Edmonds Business License #: 602454996-001-0001 1
CONTACTS
L
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
HALIE SCHULTZ
5108 D STREET NW, AUBURN
(253)872-5665
PERMITS@EMERALDAIRE.COM
WA 98001
CONTACT
EMERALD AIRE, INC
5108 D STREET NW, AUBURN
(253)872-5665
permits@emeraldaire.com
WA 98001
CONTRACTOR
EMERALD AIRE, INC.
5108 D STREET NW, AUBURN
(253)872-5665
PERMITS@EMERALDAIRE.COM
WA 98001
PAGLIACCI-CRETINI
423 E PIKE ST, SEATTLE WA
OWNER
EDMONDS LLC
98122
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
1 -BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
9/7/21
R14586
PERMITS
AIR CONITIONING SYSTEM OR HEAT
001.000.322.10.000.00
$100.00
$100.00
9/7/21
R14586
PUMP - 1.75 BTU OR LESS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
9/7/21
R14586
PER PERMIT
MECHANICAL PLAN REVIEW FEE
001.000.345.83.000.00
$110.00
$110.00
9/7/21
R14586
TOTALS: $300.00
$300.00
77
CONDITION TYPE
STATUS
NOTES
Printed: Tuesday, September 07, 2021 12:10:03 PM 1 of 2
MECHANICAL
Permit
• • -
MIT NU
I
City of • • •
ftwww.edmondswa.gov1 1
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
INSPECTIONS
- Schedule Online
at: https://Inspection.MyBuildingPermit.com
COMPLETED RESULT
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
X-0 MECH FINAL"
B-3 MECH EQUIP
ATTACHMENT
Printed: Tuesday, September 07, 2021 12:10:03 PM 2 of 2