Building Permit 2020'S IDENTIAL BLDG Permit
PERMIT NUM
City of Edmonds
www.edmondswa.gov
wwm
Type: RESIDENTIAL BLDG Owner/ Business: BETH CAMPBELL Status: ISSUED
Subtype: ALTERATION OR REMODEL
Parcel No: 00513100008803 Site Address: 16515 74TH PL W EDMONDS,WA 98026-4911
Applied: 8/10/2020
Subdivision: 005131, 004616, SP S-8-73 Lot: 0
Issued: 9/29/2020
Fire Sprinklers: Lot Area: Zoning: RS-20
Final:
Valuation: $10,000.00 Occupancy Type: Construction Type:
Expiration Date: 9/29/2021
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Issued by: NED
Scope of Work: LIEU- FOUNDATION STABILIZATION
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
BETH CAMPBELL
250 4TH AVE SOUTH 2O0,
(425)778-8500
BETH@CGENGINEERING.COM
EDMONDS WA 98020
CONTACT
CG ENGINEERING
250 4TH AVE SOUTH 2O0,
(425)778-8500
beth@cgengineering.com
EDMONDS WA 98020
CONTRACTOR
CONTRACTOR UNKNOWN
16515 74TH PL W, EDMONDS
OWNER
CHARLENE A LIEU
206.779.1290
WA 98026-4911
INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
8/31/20
R7366
PER PERMIT
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$287.00
$287.00
8/31/20
R7366
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$243.95
$243.95
8/14/20
R7059
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
8/31/20
R7366
TOTALS: $577.45 $577.45
CONDITIONS
CONDITION TYPE STATUS NOTES
Printed: Tuesday, September 29, 2020 6:59:41 AM 1 of 2
Permit
PERMIT NUM
City of Edmonds
7121
BLD2020-089311
-. •. •
il
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
ALL BUILDING PERMITS
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
REQUIRED SPECIAL
FOR
INSPECTIONS
INFORMATION
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays
SOUND OR NOISE
INFORMATION
and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
SPECIAL INSPECTION REPORTS
FOR
Submit all special inspection reports to the City Building Official on a weekly basis.
NFORMATION
INSPECTIONS
- Schedule Online
at: https://Inspection.MyBuildingPermit.com
COMPLETED RESULT
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
A-1 BUILDING PRECON
B-S BLDG SPECIAL
INSPECTION
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
Printed: Tuesday, September 29, 2020 6:59:41 AM 2 of 2