Loading...
Building Permit 2020'S IDENTIAL BLDG Permit PERMIT NUM City of Edmonds www.edmondswa.gov wwm Type: RESIDENTIAL BLDG Owner/ Business: BETH CAMPBELL Status: ISSUED Subtype: ALTERATION OR REMODEL Parcel No: 00513100008803 Site Address: 16515 74TH PL W EDMONDS,WA 98026-4911 Applied: 8/10/2020 Subdivision: 005131, 004616, SP S-8-73 Lot: 0 Issued: 9/29/2020 Fire Sprinklers: Lot Area: Zoning: RS-20 Final: Valuation: $10,000.00 Occupancy Type: Construction Type: Expiration Date: 9/29/2021 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: LIEU- FOUNDATION STABILIZATION WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT BETH CAMPBELL 250 4TH AVE SOUTH 2O0, (425)778-8500 BETH@CGENGINEERING.COM EDMONDS WA 98020 CONTACT CG ENGINEERING 250 4TH AVE SOUTH 2O0, (425)778-8500 beth@cgengineering.com EDMONDS WA 98020 CONTRACTOR CONTRACTOR UNKNOWN 16515 74TH PL W, EDMONDS OWNER CHARLENE A LIEU 206.779.1290 WA 98026-4911 INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 8/31/20 R7366 PER PERMIT PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $287.00 $287.00 8/31/20 R7366 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $243.95 $243.95 8/14/20 R7059 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 8/31/20 R7366 TOTALS: $577.45 $577.45 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Tuesday, September 29, 2020 6:59:41 AM 1 of 2 Permit PERMIT NUM City of Edmonds 7121 BLD2020-089311 -. •. • il 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. REQUIRED SPECIAL FOR INSPECTIONS INFORMATION Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays SOUND OR NOISE INFORMATION and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. SPECIAL INSPECTION REPORTS FOR Submit all special inspection reports to the City Building Official on a weekly basis. NFORMATION INSPECTIONS - Schedule Online at: https://Inspection.MyBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE A-1 BUILDING PRECON B-S BLDG SPECIAL INSPECTION B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" Printed: Tuesday, September 29, 2020 6:59:41 AM 2 of 2