ENG2021-0338 ROW PERMITRIGHT OF WAY EUC PERMIT
PERMIT NUMBER
City of Edmonds
. •:� i 1 1 '
. -. •.
Description: ZIPLY-MANHOLE ACCESS FOR MAINTENANCE AND NEW FIBER
ISSUED: 09/14/2021
Address: 7315 212TH ST SW EDMONDS WA 98026-7610
EXPIRES: 03/14/2022
rmit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00566900500600
i
NAME TYPE NAME ADDRESS PHONE
APPLICANT ZIPLY FIBER 1800 41ST ST, EVERETT WA 98201 (425)949-0230
CONTRACTOR PACIFIC CABLE CONSTRUCTION PO BOX 573, WOODINVILLE WA 98072 (425)348-7735
OWNER EDMONDS PROFESSIONAL CENTER 7315 212TH ST SW, EDMONDS WA 98026
LLC
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00
RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $0.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY I
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
09/14/2021
RELEASED BY
DATE
Printed: Tuesday, September 14, 2021 10:57:11 AM 1 of 2
-KRWOF WAY EUC PERMIT
City of • • •
Edmonds•:• •ENG2021-03,138
www.cityofedmonds.gov• •
CONDITIONS
CONDITION TYPE
Easement and/or permission from adjacent property owner is required prior to entry or work within
ADJACENT PROPERTY
an adjacent property.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
Alert affected residents and/or businesses prior to work start.
Verify clear bore crossings.
ENGINEERING OTHER
Restore landscape to like or better conditions.
Call for required inspections as noted.
ESC REQ
Maintain erosion and sedimentation control per City and SWMMW standard requirements.
Sound/Noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND OR NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites/activities must comply with the noise limits
of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
TRAFFIC CONTROL
Traffic Control per approved plan and MUTCD. All Flaggers shall be certified.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL"
E-7 TRAFFIC CTRL
Printed: Tuesday, September 14, 2021 10:57:11 AM 2 of 2
ENG2021-0338
of E°M°tio� RECEIVED
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION AUG 23 2021
Complete and submit this Application in accordance with the Submittal CITY OF EDMONDS
/Ivc. i sa° Requirements outlined in Right -of -Way permit Handout E6�. DEVELOPMENT
SERVICES DEPARTMENT
If any field is not applicable to your project, write "N/A' instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General •
Project Name 55044204-440
Site Address or if no site address use Property Address at NW corner of project area: 7315 212th St SW Edmonds, WA 98026
Associated Permits: BLD PLN ENG
Owner and Entity Holding Franchise (if applicable)
Name of Company Ziply Fiber Franchise Ordinance No: WN U-17
Point of Contact Stephen Ungerecht
Title Engineer
Address 1800 41 St St, Ste N 100
city Everett
State WA
Zip 98203
Phone 206-516-9038
Email stephen.ungerecht@ziply.com
Contractor and Authorized Agent of Owner (see note below)
Name of company Pacific Cable Construction
Contractor Contacts
Primary Name
During Construction
Danielle Harrera
Agent Name Danielle Herrera
Title
Permit Manager
Title Permit Manager
Mobile
425-348-7735
Address PO BOX 573
Email
danielle@paccab.com
City Woodinville
State WA
Zip 98072
Secondary Name
Phone 425-348-7735
Title
Email danielle@paccab.com
Mobile
City of Edmonds Business License No: PACI FCC954PJ
Email
State License No: 3636CON 1096
Of
Contractor verifies it is currently bonded
Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as welt
❑ Traffic Control Only (no associated development)
Ej Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
Telecommunications and broadband provider Ziply Fiber to test fiber at a man hole on 212th st SW. There
will be splicing of existing fiber on 212th st SW. There will also be a man hole access on the same east bound road of
212th st SW. This will close down the east bound right lane. Infrastructure that will be impacted will be the fiber in the
man holes. This is maintenance and putting in a new utility.
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
I x
LF
SF
none
Alley 72 hours +
LF
Ix
I LF
SF
none
Parking 72 hours +
LF
Ix
I LF
SF
none
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
VZtelecommunications ❑ cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
Details of Work to be Completed
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes
x
No
2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
x
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
x
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
x
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
x
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
Details
of Work to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
x
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
x
How many are existing? I I How many are to be added?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
x
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
x
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE:
APPLICANT PRINTED NAME:
APPLICANT TITLE:
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
72ND A VE W
(25 MPH)
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
WORK DETAILS:
@ SET UP MANHOLE
w SPOTTER NEEDED FOR PEDESTRIAN s
TRAFFIC AND DRIVEWAY ACCESS.
WORK
AREA
.ND:
250'
FFER SPA
O
SIGNALIZED IN7ERSECTIGN
O
CONE (CANIXESTICK)
®
TYPE III BARRICADE
WORK TRUCK
WORK ZONE UMI7S
WARNING SIGN
•�•
()
rNO PAOVEMENT
MMARIOC NGS)
(ASS NNMM)
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
212TH ST SW
(35 MPH)
PHASE 1-
N
6
ENGINEERING DIVISION
APPROVED AS NOTED
ddl W(Ul.,44L 09/13/2021
D
J
_ 225'
MERGING TAPER (L)
rnz
1 I
c 00
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
� � y
SIGN LEGEND:
ROAD RIGHT LANE
WORK CLOSED
AHEAD AHEAD
> <* <
W20-1 W4-2L W20-5R
CHANNELIZATION DEVICE
SPACING (feet)
MPH
TAPER
TANGENT
50 / 70
40
80
35/45
30
60
25/30
20
40
MINIMUM LANE CLOSURE TAPER LENGTH = L (feet)
LANE
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
10
105
150
205
270
450
1
500
550
600
650
700
11
115
165
225
295
495
550
605
660
715
770
12
125
180
245
320
540
600
660
720
780
840
RECEIVED
AUG 23 2021
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
O
ATCO COMMUNICATIONS SERVICES, LLC
www.atcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
WSTCS# 012911
zilyfiber
P
Everett, WA 98206
03:
V'
V
w
Q
z 3
Q
H
N
U
H
Ln
Ln
N
U
0
0
_J N
0
U)
O Ln
F-
N
^ /
1 Y
N
I-
z
O
U
N
N
I ,_
Z
-C
lyj
o
Q
W
W
Q
� Z
a
a
DATE: &19.2021
DESIGNED BY: S. UNGERECHT
ATCO CONTACT: 206.516.9038
stephen.ungerecht@atcotelecom.com
SCALE: SHEET-
1 40� 02
NO: 2OF5
70ND AVE W (25 MPH)
LLJ
z
1 tJ cJ 1V11 1 1
=I
U
Q
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25
30 35 40
45
50
55
60
64
70
LENGTH (feet)
155
200 1 250 305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
CHANNELIZATION DEVICE
SPACING (feet)
MPH
TAPER
TANGENT
50/70
40
80
35/45
30
60
25/30
20
40
MINIMUM LANE CLOSURE TAPER LENGTH = L (feet)
LANE
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
10
105
150
205
270
450
500
550
600
650
700
11
115
165
225
295
495
550
605
660
715
770
12
125
180
245
320
540
600
660
720
780
840
PHASE 1
WORK DETAILS:
0 TEST FIBER FROM EXISTING MP❑E
w SPOTTER NEEDED FOR PEDESTRIAN
TRAFFIC AND DRIVEWAY ACCESS.
N
6
SIGN LEGEND:
ROAD RIGHT LANE
WORK> <* CLOSED
AHEAD AHEAD
W20-1 W4-2L W20-5R
LEGEND:
O
SIGNALIZED INTERSECTION
O
CONE (CANDLESTICK)
TYPE III BARRICADE
WORK TRUCK
WORK ZONE LIMITS
MUM
WARNING SIGN
WHERE REWIRED)
IRECTION OF TRAFFIC
NOT PAVEMENT MARKINGS)
(ASGGER
NEEDED)
RECEIVEDI
AUG 23 2021 1
0
ATCO COMMUNICATIONS SERVICES. LLC
www.atcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
WSTCS# 012911
zilyfiber
p
Everett, WA 98206
IID
IAJ
IO
CITY OF EDMONDS I it
DEVELOPMENT \\\
SERVICES DEPARTMENT
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
LLJ
a
0
z
N
r
to
I—
tn
N
F
U
O
N
LL_
LL_
Q
3
v
F-
0
I
O
N
O
L0
L
n
w
DATE: &19.2021
DESIGNED BY: S. UNGERECHT
ATCO CONTACT: 206.516.9038
stephen.ungerecht@atcotelecom.com
SCALE: SHEET-
1 " = 40� 03
NO: 3OF5
SIGN LEGEND:
ROAD
RIGHT LANE CENTER LAN
WORK
CLOSED CLOSED
AHEAD
W20-1
AHEAD AHEAD
W4-2L W20-5R W20-51C
a
rel
F F
73W0-1�r350
LW20-5C
5O
WORK DETAILS:
0 SPLICE FIBER
0 TEST FIBER FROM EXISTING MP❑E
w SPOTTER NEEDED FOR PEDESTRIAN
TRAFFIC AND DRIVEWAY ACCESS,
ANY WORK AFFECTING TRANSIT
❑PERATI❑NS OR FACILITIES: CONTACT
CIC @ 206-477-1140
PR❑VIDE ONE WEEK N❑TIFICATI❑N FOR
BUS STOP IMPACTS
2
212TH ST SW
(3 5 MPH
1
250'
BUFFER SPA
N
PHASE 2 b
0
ATCO COMMUNICATIONS SERVICES. LLC
www.atcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
WSTCS# 012911
zi I fiber
I Everett, WA 98206
z V) z 3
w v
M 4L V Q
U
H
O N 0
4160 MITI ME
�WE 94
-
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25
30 35 40
45
50
55
60
64
70
LENGTH (feet)
155
200 1 250 305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
NOTE:
MON. - FRI. = 7:OOam TO 4:OOpm
CHANNELIZATION DEVICE
SPACING (feet)
MPH
TAPER
TANGENT
50/70
40
80
35/45
30
60
25/30
20
40
MINIMUM LANE CLOSURE TAPER LENGTH = L (feet)
LANE
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
10
105
150
205
270
450
500
550
600
650
700
11
115
165
225
295
495
550
605
660
715
770
12
125
180
245
320
540
600
660
720
780
840
LEGEND:
o
SKNALMM 11147ERSECTION
o
COW«
®
TYPE IM BARRMADE
jl
WORK lwac
WORK ZONE LU75
WARN NG SM
FIC
AR o,"
�1 AppP�AVO—EIITM
(� �)
RECEIVED
AUG 23 2021
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
I'I
N r L
`n o
0 0
_j 0
0
O L
N
N
z
O
U
N
�
LL
o
LL
Z
L;;
o
Q
W
W
Q
� Z
a
a
DATE: &19.2021
DESIGNED BY: S. UNGERECHT
ATCO CONTACT: 206.516.9038
stephen.ungerecht@atcotelecom.com
SCALE: SHEET-
1 40� 04
NO: 4OF5
N
SIGN LEGEND: PHASE 2
ROAD RIGHT LAN> <( < E CENTER LANE ATCO COMMUNICATIONS SERVICES, IOLC
WORK CLOSED CLOSED www.atcotelecom.com
AHEAD AHEAD AHEAD WORK DETAILS: 360.563.9000
708 First Street
Snohomish, WA 98290
W20-1 W4-2L W20-5R W20-5C ( SPLICE FIBER WSTCS# 012911
JC4
T q� 02 TEST FIBER FROM EXISTING MP❑E �' I f i b e r
SPOTTER NEEDED FOR PEDESTRIAN
� TRAFFIC AND DRIVEWAY ACCESS, Everett, WA 98208
W ANY WORK AFFECTING TRANSIT
225' OPERATIONS OR FACILITIESi CONTACT
W 350' 350' 350' CIC @ 206-477-1140
MERGING TAPER (L) PR❑VIDE ONE WEEK N❑TIFICATI❑N FOR 3
BUS ST❑P IMPACTS 2>2TH ST SW � V Q Q
(� (35 MPH) W4-2L� W20-5R W20-1-\ oN = o
O N N
_ DRIVEWAY Ln N r
W • • u�
' ' Imo- —• >— • • • — r� I ON
w J O
^ ® O C� 0 L
v JAll 0
0 0 Lo
04
N
'gym DRIVEWAJ DRIVEWA
i O
LEGEND: U
W I O SMAUZ D INTERSECTION
Zo ME (CANXE87IpK)
C4 ® TYPE MI BARRICADE
W "- LL
q `� "- "w'a` RECEIVED
2 ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. YYORK ZONES z
I W20-1 APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY wARNrw slaty AUG 23 2021 ;� FO Q a
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN I I� ' Q z
U SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) 0 O U
.� • • • REQUIRED) I, Iz a:0
PAM DiT MINDS) CITY OF EDMONDS \ 1 a J
QDEVELOPMENT \
(ASSMUM) SERVICES DEPARTMENT
DATE: &16.2021
NOTE: DESIGNED BY: S. UNGERECHI
MON. - FRI. = 7:00am TO 4:00pm ATCO CONTACT: 206.516.9038
stephen.ungerecht0atcotelecom.com
SCALE: SHEET-
LANE
05
NO: 5OF5
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25
30 35 40
45
50
55
60
64
70
LENGTH (feet)
155
200 250 305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100'
123'
172'
74'
100'
150'
CHANNELIZATION DEVICE
SPACING (feet)
MPH
TAPER
TANGENT
50 / 70
40
80
35/45
30
60
25/30
20
40
MINIMUM LANE CLOSURE TAPER LENGTH = L (feet)
LANE
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
10
105
150
205
270
450
500
550
600
650
700
11
115
165
225
295
495
550
605
660
715
770
12
125
180
245
320
540
600
660
720
780
840
SIGN SPACING = X (1)
FREEWAY &EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS &URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS &URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL &BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
0 06.2008 7FOAOAC 2422.201
2408'
Xo,1R 36+ 7315 212TH ST SW, STE 104 W
HLLKWAXX F7304,61-72 HLLKWAXX 915074 ¢
I CERTFY TNAT THE WORK I COMPLETD ON THIS WORK ORDER
AND AS -BUILT IS IN COMPLIANCE WITH FRONTIER QUALITY
STANDARDS AS IDENTIFIED ON THE IPOIPCHECKLIST .
I N : X D,1 - 8+ 0
(X ) FT157,81+ N ORDER # PSR 3394119
______ XD,10-22+
HLLKWAXX FT157,23-24 v 100 MEG
INTEGRATED REHABILITATION
OUT: 3
TOTAL ALLOTTED HOURS
CONTACT SUPERVISOR IF ADDITIONAL
HOURS ARE REQUIRED TO COMPLETE PROJECT
1
CAP.
X-TIME
MAINT
CREW
o
0
0
SPLICING I
o
0
0
W.O. DRIVER
M ETHERNET
CONSTRUCTION START
1V25120
W GROUP
I
S16A TEST FIBER Q SITE LOON: MATT STEWART
IN SERVICE DATE
12/10/20
FROM MPOE TO HLLKWAXX 425-686-7664
Z i matt.stewary@Irgpt.com
BLDG TRM 100PR PROT 100 2422.101 N
C95ES D602 /�'
C95ES 26,1301-1 400
SPLICE FIBER I C. O•
C
720 09.2008 I •O i9
D CIAC
D OTHERE
0 CONSTRUCTION
FLAGGING O BRUSHING 0 CONTRACTOR
PERMITS
MUNICIPALITY:
D BLANKET
RBN 0
® TCP/TRAFFIC
XD,1-8+ S72A MH SETUP
(XD,9) FT157,81+ I CITY OF EDMONDS PERMIT
2422201 REQ'D TO ACCESS
HLLKWAXX FT157,23224 I ® S50A MH HLLKWAXX 7
C DETAILED (NOT BLANKET)
D NO PERMIT REQUIRED
JOINT POLE
FN/NJUN0 CITY OF DS
®NO JPN REQUIRED
/ I
I 553 06.2007
— I I YGD
=_ _—=----__ ------===----- I HLLKWAXX FT157,1-96
POLE JPN JPN
OWNER TO FROM
D D D POWER
0 0 o FRONTIER
��— —� ---- --- -----___—_----
ACCOUNT CODES
-�----�—�— _—_—_—_—_—_-- -_ ---—_—_—_—__ _—_—
0 2411.001 POLES 0 2422.201 UG FIBER
—�--_—___ __ ____ —_—_ -- __ =—
212TH ST SW ( 0 0--__—__ -- ==
212TH ST SW) I
02421.1 DI OH COPPER 02441.001 CONDUIT
02421.201 OH FIBER 0 34XX.XXX REMOVAL
Cl 2422.101 UG COPPER D 64XX.XXX MAINT.
I I
i
1640 06.200 i
POINT OF CONTACT
SITE CONTACT: MATT STEWART
YGD 96 I
HLLKWAXX FT157,1-22+ I I 980 06.2007
4zs-sa
SCHEDULING: JOHNOHN WOOD
PHONE azs-261-1s12
XD,23-24+ i IIII YJD 24
HLLKWAXX FT157,25-28+ XD,1-4+
ENGINEER: MIKE HAKAHAN
PHONE: 425-949-0230
FACILITIES: SHAWNCONKLIN
i XD,29-30+ HLLKWAXX FT157,29-30+
HLLKWAXX FT157,31-60+ XD,7-24
PHONE: 425-263-4010
FIELDED BY: N/A
HLLKWAXX FT304,61-72+
iHLLKWAXX FT157,73-96
•
ziplyfiber
HLLK 100 MEG INTEGRATED
i
RECEIVED
7315 212TH ST SW
I
PROJECT
5504204440 C.O. AREA. 962
NUMBER -
. EXCH. CODE: 51419
DRAWN DATE
ENGR M HAKAHAN
SNOHOMISH
AUG 23 2021
8/11/21
PHQNE425-949-0230
ILE
FILE:
SCALE'. 1:100
1 TAX DISTRICT
I DWG 1 OF 1
TWNSHP'.
RNG:
ISEC:
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, N
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) 41 ft
O
ATCO COMMUNICATIONS SERVICES, LLC
www.atcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
WSTCS# 012911
zilyfiber
_ p
Everett, WA 98208
,. ;
04
Lo
Me
Ld
.�,
04
V )
Ld
_�13lh PI SW
z
O
W Q Z
a a
DATE: 8.19.2021
RECEIVED DESIGNED BY: S. UNGERECHT
AUG 23 2021 ATCO CONTACT: 206.516.9038
stephen.ungerecht@atcotelecom.com
SCALE: SHEET:
CITY OF EDMONDS VICINITY M A P
DEVELOPMENT SERVICES DEPARTMENT � O T TO M
SCALE
NO: 1 OF 5