Loading...
BLD2021-1279+Other+9.14.2021_4.00.11_PM+2408349Branch 1 6 modules X Z Branch 2 \ 6 modules + 0 Equipment Schedule I I I _ 20A/2p I 20A/2p--------------- A A Ref. Category Equipment QTY 1 Modules Solaria 40OR-PM 12 2 Inverters Enphase IQ7A-2-US 12 3 Jbox Jbox 1 41 LoadCenters Enphase IQ Combiner Panel 80A, 240V 1 Breakers (2)2p2OA 5 Disconnect 30A 600V 2 Pole I Heavy Duty, No Fuse, Lockable 1 6 MeterBase MeterBase-125A 4 Jaw w/ 3.5" AWCAP 1 Meter Landis Gyr EA110000-OP29 240V 1 Monitoring Enphase IQ Consumption Monitoring 1 0 Conductor Schedule A r----------- I I I Line O L� — — — Load 05 Co -Located 6 with Net Meter (less than 10' away) Customer Owned Production Meter ■ = A & R Scope `,'I' _ I = Existing or A&RSOLAR Others Scope 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 (Existing) O Main Service Panel (lph 240V Service) Main Breaker: 200A THIS DRAWING CONSTTUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR Bus Rating:200A AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN Solar OCPD: 2p30A RIGHTNOR ANY REPRODUCE DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. (Existing) Meter Main (1ph 240V Service) — 200A Service Disconnect nverter Specs Watts LwJ Output LA � AC Voltage #of Inverters OCPD Branch Enphase IQ7A-2-US 349 1.45 240 12 20 ****N/A**** 0 0 0 0 0 ****N/A**** 0 0 0 0 0 Module Specs Watts w imp Vmp Voc Isc Solaria 40OR-PM 400 9.41 42.4 51.1 9.82 Temp. Adjusted 0 0 38.2 55.8 0 Summary Distance (ft) Current @125% Operating Voltage Voltage Drop Volt. Drop (total) A (2)#10 CU, (1)#6 EGC, Q Cable, AIR 50 10.88A 240V 0.45% 1.13% B (4)#10 CU, (1)#10 EGC, THWN-2, 0.75"EMT(min) 50 10.88A 240V 0.45% C (2)#8 CU, (1)#8 N, (1)#10 EGC, THWN-2, 0.75"EMT(min) 10 21.75A 240V 0.11% D (2)#8 CU, (1)#8 N, (1)#10 EGC, THWN-2, 0.75"EMT(min) 10 21.75A 240V 0.11% General Notes: M, M NU Q O C N _ O� � 000 v 00 L 00 M i 00 fa U 00 4 Q 00 0 U u ,—I Ln C a� �L � C10 :OM O .0 L N 2 N `/ N b-) E 00 w 2 � U a� �O L a REVISIONS Rev. #: IDate: Utility: PSE Designed by: Thomas N 1. EGC Where exposed to physical damage will be #6AWG Project Manager: Bare CU Arthur Eith 2. If installing conduit on the roof, maintain greater than 7/8" (612) 298-1795 above the surface 3. NEC 690.12: Rapid Shutdown initiated by loss of Grid or AC Current Date:Aug 27, 2021 Disconnect 4. For supply side taps, a #6 GEC (min.) will be run separately from the disconnect and connected to the grounding electrode E1 Single Line with an irreversible crimp PV Electrical Calculations Inverter Specs Watts Output AC Voltage # of Inverters OCPD Total AC Comb. EGC AC W (A) Branch out.(A) OCPD Enphase IQ7A-2-US 349 1.45 240 12 20 17.4 25 410 r Ampe ****N/A**** 0 0.00 0 0 0 ****N/A**** 0 0.00 0 0 0 Module Specs Wks Imp Vmp Voc Is Temp. Coef V(oc) GLQ- Volt Solaria 40OR-PM 400 9.41 42.4 51.1 9.82 -0.29 #10 Max V( Max, Temp. Adjusted 38.2 55.8 Optimizer? N/A Equipment Enphase IQ7A-2-US Enphase IQ7A-2-US ****N/A**** Mppt Input 1 2 3 1 2 3 1 2 3 Module Solaria 400R-PM Solaria 400R-PM ****SELECT**** # Modules per String 1 0 0 1 0 0 0 0 0 #Strings 1 0 0 1 0 0 0 0 0 # of Mods per group 1 0 0 1 0 0 0 0 0 # of Mods/inverter 1 1 0 # of Inverters 6 6 0 Total # of Modules 12 Ref. Conductor Description Distace AL CU A Longest Branch toJbox 50 Cu B Jbox to Combiner 50 CU C Combiner to Disconnect 10 CU D Disconnect to I nterconne 10 Cu E F G H Inverter npptinpul -age (Imp) ige (Vmp) iltage(DC) Imps (DC) Array Specs (Adjusted for Temperature) Enphase IQ7A-2-US Enphase IQ7A-2-US ****N/A**** 1 2 3 1 2 3 1 2 3 9.41 0.00 0.00 9.41 0.00 0.00 0.00 0.00 0.00 38.2 0.0 0.0 38.2 0.0 0.0 0.0 0.0 0.0 55.8 0.0 0.0 55.8 0.0 0.0 0.0 0.0 0.0 9.82 0.00 1 0.00 1 9.82 0.00 0.00 0.00 0.00 0.00 Max Array Power(5TC): 4.8 kW DC Max Continuous AC Power: 4.188kW AC Interconnection Calcs Main Breaker 200 Bus Bar 200 Max PV OCD Al lowed 40 PV OCPD Device Used 30 Tap or Breaker? Breaker Wire iaut;e (QTY) Phase Neutral Neutral EGC (AW0) Wire Type Conduit Min. Conduit 90°C Rating Temp Correct. Fill Derate Derated Ampacity Conductors AW0 QTY) Type #10 2 N/A N/A #6 QCable AIR N/A 40 1 100% 40.00 #10 4 N/A N/A 1 #10 THWN-2 EMT 0.75" 40 1 80% 32.00 #8 2 #8 1 #10 THWN-2 EMT 0.75" 55 1 100% 55.00 #8 2 #8 1 #10 THWN-2 EMT 0.75" 55 1 100% 55.00 7YC al Me rl*J Site Conditions ASHRAE Site: Seattle Low Temp(°F) 19 High 2%Temp (°F) 84 High 0.4%Temp (1) 91 &*41./��. A&RSOL_AR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. C O C7 M NU o1 Q c � O 4- U 00 7 00 L � c � U U O 0 C1 00 Current Operating_ Voltage @125 Voltage Drop v 10.9 240 0.45% '^ O 10.9 240 0.45% L a 218 240 0 11% 0 _ � N � 0000 O0 L00 L.M U 00 V) a -'Z T--1 C: 3: U Ln N �-0 C p M O N N N E LU REVISIONS 21.8 240 0.11% Rev. #: Date: Designed by: Thomas N Total Voltage Drop: 1Project Manager: b p � .13°/ � Arthur Eith (612)298-1795 Current Date:Aug 27, 2021 E2 Electrical Calculations Typical Placards Custom Placards A) NEC 2020 690.13 & 691.15 B) NEC 2020 705.12 (13)(3)(2) C) Utility Requirement D) Utility Requirement (Commercial Only) D) A&R Solar Requirement (Residential Customer -Owned) E) A&R Solar Requirement * if combiner used F) NEC 2020 690.13 (B) I) NEC 2020 690.31 (D)(2) K) NEC 2020 690.13 (B) SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE SOLAR "OFF" POSITION TO ELECTRIC PV PANELS SHUTDOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY L) NEC 2020 690.56 (C) *Used with Micro Inverters or DC Optimizers O) A&R Solar Requirement * if multiple inverters IAWARNING DUAL POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM P) NEC 2020 705.12(C) & 690.59 R) AHJ Requirement * if combiner used S) NEC 2020 230.85(1) T) NEC 2020 230.85(3) PLACARD SPECS Q)TY NEC 690.54 Letter Heigh#: 1J8" L , ■ } , AC Maintain 1/4" border 2 Branch of 6 kPERATING Lrr Red f White NEC 690.54 Letter Height: 1/8" (1) for earh PV load ■ L renter, + Maintain1/4" border 4 ■ PERATING AC VOLTAGE:E V AC Disconnect, Red White MSPluostrearn A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OFA&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. C O �4'1 M N U 01 Q i C v 00 �00 C U U W CM �00 O 2 � U O O L a O _ N O0 � �00 00 (3) U 00 cn Q U Lr) N ��0-0 C O M O N N N Y �rn E LU REVISIONS Rev. #: I Date: Designed by: Thomas N Project Manager: Arthur Eith (612) 298-1795 Current Date:Aug 27, 2021 G4 Placards J) NEC 2020 690.56 (C)(2)