Loading...
LetterOfCompliance re framingMcCann Structural MSSolutions September 17, 2021 Building Inspector City of Edmonds Subject: Prosser / Soleta Residence 643 Dayton Edmonds, WA Reviewer: STRUCTURAL REVIEW — Statement of Compliance Please be advised that on August 27, 2021, Michael McCann, SE, of McCann Structural Solutions, the Project Engineer of Record, conducted a site visit to examine the status of the current framing. Numerous photos of the existing framing were taken. During the site visit, the locations of the shear wall hold downs and anchor bolts to the existing CMU wall below at the main floor were determined and marked with the contractor, and the glulam beam hangers were noted as installed correctly and in the proper locations. Therefore, the framing as observed is in compliance with the approved plan set and the intent of the structural drawing set. If YoL. have any questions or concerns, please call (425-879-7949) or email me at ms uared48 ahoo.com.