Loading...
APPLICANT RESPONSE TO PLNMark H. McDowell McDowell Design Build Inc. 12345 Lake City Way NE #223 Seattle, Wa. 98125 Michael Clugston, Senior Planner City of Edmonds RE: Response to Planning Review for #BLD2020-0142 at 23517 75th Ave W. The top of slope and buffer have been added to the sht A1 Site Plan. A Geotech review has been completed for the Lot 1 plans and letter submitted confirming the proposed building plans are consistent with ECDC 23.80.050, that they conform to the recommendations in the original Geotech Report dated 12/12/17 and that the proposed home is well away from the top of slope and recommended buffer. Thank you, Mark H. McDowell 206 949 9180 04/10/20