Loading...
Planning Comments 1 BLD2020-0142OF Eb4fO� CITY OF EDMONDS v ° PLAN REVIEW COMMENTS PLANNING DIVISION 425.771.0220 DATE: March 3, 2020 TO: Mark McDowell FROM: Mike Clugston, AICP, Senior Planner michael.clugston@edmondswa.gov RE: Planning Comments 1- Plan Check BLD2020-0142 New SFR at proposed 23517 75t" Ave. W I have reviewed this building permit application on behalf of the Planning Division. During review, it was found that the following corrections need to be addressed. Please submit updated plans with changes called out, any requested reports, and summarize the changes in a cover letter: 1. Geotech report: Please update the December 12, 2017 report consistent with ECDC 23.80.050 for the specific improvements proposed on Lot 1 addressing the standards in ECDC 23.80.060 and .070. Indicate the top of slope on Sheet Al as well as the buffer distance determined in the geotech report. If you have any questions, please contact me at 425.771.0220 ext. 1330. Please make all submittals to a Permit Coordinator, Monday — Friday between 8:00 am 4:30 pm (8:30 am to 12:00 pm only on Wednesdays). Applicable codes, handouts and the City's GIS are available at: http://www.edmondswa.gov/handouts.html Page 1 of 1