Loading...
Building Permit 2021Type: MECHANICAL Subtype: COMMERCIAL MECHANICAL I Status: ISSUED Parcel No: 27032500306200 Site Address: 750 EDMONDS WAY EDMONDS,WA 98020-5126 Subdivision: 006107, BLA LL-2000-134, SP 93-30, 005546 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $0.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: SUNRISE OF EDMONDS-2 MECHANICAL SYSTEMS (AC/HEAT PUMP) Applied: 9/7/2021 Issued:9/23/2021 Final: Expiration Date: 3/23/2022 Issued by: WAC WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 1 CONTACTS NAME TYPE NAME ADDRESS I PHONE EMAIL APPLICANT MISTY POMADA 18702 NORTH CREEK PARKWAY (425)883-9224 MISTY.POMADA@COMFORTSYSTEMS 110, BOTHELL WA 98011 USA.COM CONTACT COMFORT SYSTEMS USA- 18702 NORTH CREEK PKWY, (425)445-0904 dfrohardt@csusanw.com NORTHWEST BOTHELL WA 98011 COMFORT SYSTEM 18702 NORTH CREEK PKWY MISTY.POMADA@COMFORTSYSTEMS CONTRACTOR (425)883-9224 NORTHWEST SUITE 110, BOTHELL WA 98011 USA.COM 1920 MAIN ST 1200, IRVINE CA OWNER HCP INC PROPERTY TAX DEPT 92614 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 - BASE FEE FOR MECHANICAL 001.000.322.10.000. 00 $50.00 $50.00 9/23/21 R14905 PERMITS AIR CONITIONING SYSTEM OR HEAT 001.000.322.10.000.00 $50.00 $50.00 9/23/21 R14905 PUMP - 1.75 BTU OR LESS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 9/23/21 R14905 PER PERMIT MECHANICAL PLAN REVIEW FEE 001.000.345.83.000.00 $55.00 $55.00 9/23/21 R14905 TOTALS: $195.00 $195.00 7 • • CONDITION TYPE STATUS NOTES Printed: Thursday, September 23, 2021 9:07:46 AM 1 of 2 MECHANICAL Permit • • - MIT NUM City of • • • ft• • • • 1 1 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. INSPECTIONS - Schedule Online at: https://Inspection.MyBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE X-0 MECH FINAL** Printed: Thursday, September 23, 2021 9:07:46 AM 2 of 2