Building Permit 2021Type: MECHANICAL Subtype: COMMERCIAL MECHANICAL I Status: ISSUED
Parcel No: 27032500306200 Site Address: 750 EDMONDS WAY EDMONDS,WA 98020-5126
Subdivision: 006107, BLA LL-2000-134, SP 93-30, 005546 Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $0.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: SUNRISE OF EDMONDS-2 MECHANICAL SYSTEMS (AC/HEAT PUMP)
Applied: 9/7/2021
Issued:9/23/2021
Final:
Expiration Date: 3/23/2022
Issued by: WAC
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 1
CONTACTS
NAME TYPE
NAME
ADDRESS I
PHONE
EMAIL
APPLICANT
MISTY POMADA
18702 NORTH CREEK PARKWAY
(425)883-9224
MISTY.POMADA@COMFORTSYSTEMS
110, BOTHELL WA 98011
USA.COM
CONTACT
COMFORT SYSTEMS
USA-
18702 NORTH CREEK PKWY,
(425)445-0904
dfrohardt@csusanw.com
NORTHWEST
BOTHELL WA 98011
COMFORT SYSTEM
18702 NORTH CREEK PKWY
MISTY.POMADA@COMFORTSYSTEMS
CONTRACTOR
(425)883-9224
NORTHWEST
SUITE 110, BOTHELL WA 98011
USA.COM
1920 MAIN ST 1200, IRVINE CA
OWNER
HCP INC PROPERTY
TAX DEPT
92614
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
1 - BASE FEE FOR MECHANICAL
001.000.322.10.000. 00
$50.00
$50.00
9/23/21
R14905
PERMITS
AIR CONITIONING SYSTEM OR HEAT
001.000.322.10.000.00
$50.00
$50.00
9/23/21
R14905
PUMP - 1.75 BTU OR LESS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
9/23/21
R14905
PER PERMIT
MECHANICAL PLAN REVIEW FEE
001.000.345.83.000.00
$55.00
$55.00
9/23/21
R14905
TOTALS: $195.00
$195.00
7
• •
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, September 23, 2021 9:07:46 AM 1 of 2
MECHANICAL
Permit
• • -
MIT NUM
City of • • •
ft• • • • 1 1
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
INSPECTIONS - Schedule Online at: https://Inspection.MyBuildingPermit.com
COMPLETED RESULT
SEQID INSPECTION TYPE INSPECTOR NOTES
DATE
X-0 MECH FINAL**
Printed: Thursday, September 23, 2021 9:07:46 AM 2 of 2