Building Permit 2020BLDG Permit
PERMITNUMM121
City of • • •
Ir'SIDENTIAL
5th Ave N, Edmonds WA 98020
ww.edmondswa.gov
Type: RESIDENTIAL BLDG Owner/ Business: ALBERT COHEN Status: ISSUED
Subtype: DECK
Parcel No: 00752000000400 Site Address: 7725 168TH ST SW EDMONDS,WA 98026
Applied: 9/25/2020
Subdivision: 007520, 006931, 005131, 006666 Lot: 0
Issued: 12/2/2020
Fire Sprinklers: Lot Area: Zoning:
Final:
Valuation: $24,400.00 Occupancy Type: Construction Type:
Expiration Date: 11/27/2021
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Issued by: NED
Scope of Work: WILLIAMS DECK, WINDOW, DOOR
WA State Contractor L & I #: LOWWEHL908B6 City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
ALBERT COHEN
330 DAYTON ST. SUITE 6,
(425)776-7373
ALCOHENDESIGN@GMAIL.COM
EDMONDS WA 98020
CONTACT
AL COHEN DESIGN COMPANY
330 DAYTON ST. SUITE 6,
(425)776-7373
alcohendesign@gmail.com
EDMONDS WA 98020
CONTRACTOR
LOEWEN HOMES LLC
, EDMONDS WA
LOEWENHOMES@HOTMAIL.COM
OWNER
ROBERT WILLIAMS
7725 168TH PL SW, EDMONDS
(425)879-8234
audiorob@outlook.com
WA 98026
INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT#
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$0.00
PER PERMIT
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$497.00
$0.00
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$422.45
$422.45
9/28/20
R7746
RECORDING FEE
001.000.345.89.030.00
$216.50
$216.50
12/2/20
R8846
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$0.00
TOTALS: $1,182.45 $638.95
CONDITIONS
CONDITION TYPE STATUS NOTES
Printed: Wednesday, December 02, 2020 2:05:16 PM 1 of 3
'SIDENTIAL BLDG Permit
PERMIT NUM
City of Edmonds
2020 992
-. •. •
il L
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
ALL BUILDING PERMITS
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
As required by Ord 3632 the geotechnical engineer of record shall monitor this site during
construction for compliance with the recommendations in the geotechnical report
including site excavation, shoring, soil support for foundation, including piles, soil bearing
capacity, sub drainage installation, soil compactions, and other geotechnical aspects of
the construction. Specific recommendations contained in the approved geotechnical
report must be implemented by the owner. The geotechnical engineer shall make
written dated reports on the progress of the construction and submit the report to the
City on a weekly basis until all site grading, drainage, foundation and associated ground
work is complete. Omissions or deviations from the approved geotechnical report and or
approved plans or specs shall be highlighted and immediately submitted in a separate
letter to the City for review. The City shall be advised in writing of work stoppages of
FOR
more than one week. In addition to the geotechnical monitoring special inspections
ESLHA REPORTS
INFORMATION
based on the provisions of IBC Section 1704 are required when specified. Other special
inspections may also be required by the geotechnical engineer, architect, or structural
engineer of record. At the completion of final site grading and all permitted structures a
final geo technical report prepared by the geotechnical engineer shall be submitted to
the City. This report shall contain a statement that, based upon his/her professional
opinion, site observations, and testing during the monitoring of the construction, the
completed development substantially complies with the recommendations in the
geotechnical report and with all geotechnical related requirements. Any deviations or
omissions in the report, plans, or specifications that occurred during construction shall be
addressed separately. Occupancy, final approval, or release of the bond for the project
shall not be granted until the report has been reviewed and accepted by the Building
Official.
Approval of this foundation design is conditional subject to inspection of existing site soil
FOR
conditions. Retaining walls must be designed and constructed to resist the lateral
FOUNDATION BEARING
INFORMATION
pressure of the retained material. Provisions must be made for the control and drainage
of surface water around buildings.
Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees
to indemnify defend and hold harmless the City of Edmonds, Washington, its officials,
FOR
employees, and agents from any and all claims for damages of whatever nature, arising
HOLD HARMLESS
INFORMATION
directly or indirectly from the issuance of this permit. Issuance of this permit shall not be
deemed to modify, waive or reduce any requirements of any City ordinance nor limit in
any way the City's ability to enforce any ordinance provision.
Printed: Wednesday, December 02, 2020 2:05:16 PM 2 of 3
SIDENTIAL BLDG Permit
PERMIT NUM
lir
City of Edmonds
12 l 5th
Ave N, Edmonds WA 98020 BLD2020-099912
ww.edmondswa.gov
FOR
LOT LINES STAKED
Lot line stakes must be in place at the time of foundation setback inspection.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
FOR
MANUFACTURER SPECS
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
REQUIRED SPECIAL
FOR
INSPECTIONS
INFORMATION
INSPECTIONS
- Schedule
Online
at: https://Inspection.MvBuildingPermit.com
COMPLETED RESULT
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
B-1 SETBACKS
B-2 FOOTINGS
B-5 BLDG SPECIAL
INSPECTION
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
A-1 BUILDING PRECON
Printed: Wednesday, December 02, 2020 2:05:16 PM 3 of 3