Loading...
Building Permit 2020BLDG Permit PERMITNUMM121 City of • • • Ir'SIDENTIAL 5th Ave N, Edmonds WA 98020 ww.edmondswa.gov Type: RESIDENTIAL BLDG Owner/ Business: ALBERT COHEN Status: ISSUED Subtype: DECK Parcel No: 00752000000400 Site Address: 7725 168TH ST SW EDMONDS,WA 98026 Applied: 9/25/2020 Subdivision: 007520, 006931, 005131, 006666 Lot: 0 Issued: 12/2/2020 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $24,400.00 Occupancy Type: Construction Type: Expiration Date: 11/27/2021 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: WILLIAMS DECK, WINDOW, DOOR WA State Contractor L & I #: LOWWEHL908B6 City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT ALBERT COHEN 330 DAYTON ST. SUITE 6, (425)776-7373 ALCOHENDESIGN@GMAIL.COM EDMONDS WA 98020 CONTACT AL COHEN DESIGN COMPANY 330 DAYTON ST. SUITE 6, (425)776-7373 alcohendesign@gmail.com EDMONDS WA 98020 CONTRACTOR LOEWEN HOMES LLC , EDMONDS WA LOEWENHOMES@HOTMAIL.COM OWNER ROBERT WILLIAMS 7725 168TH PL SW, EDMONDS (425)879-8234 audiorob@outlook.com WA 98026 INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $0.00 PER PERMIT PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $497.00 $0.00 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $422.45 $422.45 9/28/20 R7746 RECORDING FEE 001.000.345.89.030.00 $216.50 $216.50 12/2/20 R8846 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $0.00 TOTALS: $1,182.45 $638.95 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Wednesday, December 02, 2020 2:05:16 PM 1 of 3 'SIDENTIAL BLDG Permit PERMIT NUM City of Edmonds 2020 992 -. •. • il L 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION As required by Ord 3632 the geotechnical engineer of record shall monitor this site during construction for compliance with the recommendations in the geotechnical report including site excavation, shoring, soil support for foundation, including piles, soil bearing capacity, sub drainage installation, soil compactions, and other geotechnical aspects of the construction. Specific recommendations contained in the approved geotechnical report must be implemented by the owner. The geotechnical engineer shall make written dated reports on the progress of the construction and submit the report to the City on a weekly basis until all site grading, drainage, foundation and associated ground work is complete. Omissions or deviations from the approved geotechnical report and or approved plans or specs shall be highlighted and immediately submitted in a separate letter to the City for review. The City shall be advised in writing of work stoppages of FOR more than one week. In addition to the geotechnical monitoring special inspections ESLHA REPORTS INFORMATION based on the provisions of IBC Section 1704 are required when specified. Other special inspections may also be required by the geotechnical engineer, architect, or structural engineer of record. At the completion of final site grading and all permitted structures a final geo technical report prepared by the geotechnical engineer shall be submitted to the City. This report shall contain a statement that, based upon his/her professional opinion, site observations, and testing during the monitoring of the construction, the completed development substantially complies with the recommendations in the geotechnical report and with all geotechnical related requirements. Any deviations or omissions in the report, plans, or specifications that occurred during construction shall be addressed separately. Occupancy, final approval, or release of the bond for the project shall not be granted until the report has been reviewed and accepted by the Building Official. Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, FOR employees, and agents from any and all claims for damages of whatever nature, arising HOLD HARMLESS INFORMATION directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Printed: Wednesday, December 02, 2020 2:05:16 PM 2 of 3 SIDENTIAL BLDG Permit PERMIT NUM lir City of Edmonds 12 l 5th Ave N, Edmonds WA 98020 BLD2020-099912 ww.edmondswa.gov FOR LOT LINES STAKED Lot line stakes must be in place at the time of foundation setback inspection. NFORMATION Installation, use and maintenance of equipment and components shall be per FOR MANUFACTURER SPECS manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. REQUIRED SPECIAL FOR INSPECTIONS INFORMATION INSPECTIONS - Schedule Online at: https://Inspection.MvBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE B-1 SETBACKS B-2 FOOTINGS B-5 BLDG SPECIAL INSPECTION B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" A-1 BUILDING PRECON Printed: Wednesday, December 02, 2020 2:05:16 PM 3 of 3