Building Permit 2021Type: PLUMBING Subtype: COMMERCIAL PLUMBING I Status: ISSUED
Parcel No: 00539600100100 Site Address: 7614 195TH ST SW 200/201 EDMONDS,WA 98026- Applied: 8/14/2021
6260
Subdivision: 005396 Lot: 0 Issued: 9/28/2021
Fire Sprinklers: Lot Area: Zoning: Final:
Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 9/28/2022
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: WAC
Scope of Work: SVREAL EDMONDS MEDICAL CLINIC- PLUMBING FOR T/I
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 1
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
BRENT DEIDE
6161 175TH 101, KENMORE WA
(206)682-5000
BDEIDE@CORNERSTONEARCH.COM
98028
CORNERSTONE
6161 175TH 101, KENMORE WA
CONTACT
(206)682-5000
sbarnes@cornerstonearch.com
ARCHITECTURAL GROUP
98028
OWNER -GENERAL
CONTRACTOR
AUTHORIZING TENANT
OWNER
EDMONDS MEDICAL CLINIC-
7614 195TH ST SW 201,
(206)818-3927
SVREAL, LLC
EDMONDS WA 98026
FEE
•' •
DESCRIPTION
ACCOUNT
PAID
PAID DATE
RECEIPT #
1 - BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$0.00
PERMITS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$0.00
PER PERMIT
EACH PLUMBING FIXTURE ON ONE
001.000.322.10.000.00
$135.00
$0.00
TRAP
PLUMBING - PLAN REVIEW FEE
001.000.322.10.000.00
$110.00
$0.00
HOURS
TOTALS: $335.00
$0.00
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Tuesday, September 28, 2021 3:01:21 PM 1 of 2
Permit
City of Edmonds PERMIT NU
EdmondsPLUMBING
98020 1
www.edmondswa.gov
•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
FOR
In addition to the required pressure relief valve an approved listed expansion tank shall
EXPANSION TANK
INFORMATION
be installed on all hot water tanks per UPC 608.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
provide manufactures installation instructions on site for Building Inspector.
L INSPECTIONS - Schedule Online
at: https://Inspection.MvBuildingPermit.com
COMPLETED RESULT
SEQID INSPECTION TYPE INSPECTOR
NOTES
DATE
X-0 PLUMBING FINAL"
B-3 PLUMB ROUGH IN
Printed: Tuesday, September 28, 2021 3:01:21 PM 2 of 2