Loading...
APPROVED BLD BLD2020-0992+Signed_Special_Inps_Form+10.12.2020_9.53.48_AM (1)SPECIAL INSPECTION AND TESTING AGREEMENT RESUB Permit #: BLD2020-0992 Oct 12 2020 CITY OF EDMONDS ' h Project: William, 7725 168th Street SW DEVELOPMENT DEPARTMENT Prior to issuance of a permit, this form must be completed in its entireh' and returned to the City for approval. The completed fern: must have signatures of acknowledgment bv all parties. DUTIES AND RESPONSIBILITIES Special Inspection Firm and Special Inspectors: The Special inspection firm of F = 0Ib+� pg �will perform special inspection for the following types of work (separate forms must be submitted if more than one firm is to be employed): _ Reinforced Concrete _ Bolting in Concrete Prestressed Concrete _ Shotcrete Structural Masonry Structural Epoxy High Strength Bolting Spray applied Fireproofing Smoke Control Systems Lateral Wood _ Structural Observation by design professional X Soils Fxpansion Bolts -Threaded Expansion Inserts All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. if inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and specifications. The work shall be inspected for confonnance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. inspection records shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City: detailing the inspections and testing; performed_ listing any nonconfor ping work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conf<innance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. Contractor: edmsvr-userfs\uscrprot$\dakauir)esktop\Comments Letters and special Inspection fornis 2019\Special Inspection forms\St 2020-0992 wilharn.doc 10,6/2020 The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must he made available. at the jobs ite for the use of the special inspector and the City Inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. Building Department: The building department shall review any revisions and addenda, The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Design Professionals: The architect andior engineer will clearly indicate on the plans and specifications the specific types of special inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to ensure that all required City approvals are obtained. prior to work shown on the revisions being pert`6rmed in the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of the iBC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the design andior constriction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACK.` OWLEItX; NIFNTS 1 hjt _ read and <agrre to comply Nvith the; terms and ,omlitions of this agreement. t)„ lrr- �� `i�.!1 �it�!► r1 Signattue �+J' Datc _#_-f ._?0zo C .,s,::.t r �'v,l ��iZJ�� 1 i l ,cure �)al� i Arch. Date: ln,e Special insp. Agency ACCEPTED FOR THE CiTY OF EDMONDS BUILDING DIVISION By: zpW.7 Date: 10/14/2020 cdm,�r-used', uacrproly, dakau rk,ktop`,('onnncnls Letters and Special Itinpcoion form. 2010`Spccial Inspection Iorms`SI 20-20-0992 WiIIiam.doc 10 (,2020