APPROVED BLD BLD2020-0992+Signed_Special_Inps_Form+10.12.2020_9.53.48_AM (1)SPECIAL INSPECTION AND TESTING AGREEMENT
RESUB
Permit #: BLD2020-0992 Oct 12 2020
CITY OF EDMONDS
' h Project: William, 7725 168th Street SW DEVELOPMENT DEPARTMENT
Prior to issuance of a permit, this form must be completed in its entireh' and returned to the City for
approval. The completed fern: must have signatures of acknowledgment bv all parties.
DUTIES AND RESPONSIBILITIES
Special Inspection Firm and Special Inspectors:
The Special inspection firm of F
= 0Ib+� pg �will perform special
inspection for the following types of work (separate forms must be submitted if more than one firm is to be
employed):
_ Reinforced Concrete
_ Bolting in Concrete
Prestressed Concrete
_ Shotcrete
Structural Masonry
Structural Epoxy
High Strength Bolting
Spray applied Fireproofing
Smoke Control Systems
Lateral Wood
_ Structural Observation by design professional
X Soils
Fxpansion Bolts -Threaded Expansion Inserts
All individual inspectors to be employed on this project will be WABO certified for the type of work they are to
inspect. if inspection is for work that is not covered by the WABO categories, or the inspector is not WABO
certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector
and the firm are qualified by education and experience to perform the work and testing required by the project
design and specifications.
The work shall be inspected for confonnance with the plans and specifications approved by the City. Revisions
and addenda sheets will not be used for inspection, unless they have been approved by the City. inspection
records shall include:
A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work
shall be brought to the immediate attention of the contractor for resolution.
A weekly report shall be submitted to the City: detailing the inspections and testing; performed_ listing any
nonconfor ping work and resolution of nonconforming items.
A final report shall be submitted to the building department prior to the Certificate of Occupancy being
issued. This report will indicate that inspection and testing was completed in conf<innance with the
approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be
detailed in the final report.
Contractor:
edmsvr-userfs\uscrprot$\dakauir)esktop\Comments Letters and special Inspection fornis 2019\Special Inspection forms\St 2020-0992
wilharn.doc 10,6/2020
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specifications must he made available. at the jobs ite for the use of the special
inspector and the City Inspector. The contractor shall maintain all daily inspection reports, on site, for review by
all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by the City
and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be
poured or other work covered until approval is given by the City inspector.
Building Department:
The building department shall review any revisions and addenda, The City inspector will monitor the special
inspection functions for compliance with the agreement and the approved plans. The City inspector shall be
responsible for approving various stages of construction to be covered and for work to proceed.
Design Professionals:
The architect andior engineer will clearly indicate on the plans and specifications the specific types of special
inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will
coordinate their revision and addenda process in such a way as to ensure that all required City approvals are
obtained. prior to work shown on the revisions being pert`6rmed in the field.
Owner:
The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of the iBC, the approved
plans and this document, may void this agreement and the Building Official's approval of the special inspector.
In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the
design andior constriction parties to perform in accordance with this agreement may result in a STOP WORK
notice being posted on the project until nonconforming items have been resolved.
ACK.` OWLEItX; NIFNTS
1 hjt _ read and <agrre to comply Nvith the; terms and ,omlitions of this agreement.
t)„ lrr- �� `i�.!1 �it�!► r1 Signattue �+J' Datc _#_-f ._?0zo
C .,s,::.t r �'v,l ��iZJ�� 1 i l ,cure �)al� i
Arch. Date:
ln,e
Special insp. Agency
ACCEPTED FOR THE CiTY OF EDMONDS BUILDING DIVISION
By: zpW.7 Date: 10/14/2020
cdm,�r-used', uacrproly, dakau rk,ktop`,('onnncnls Letters and Special Itinpcoion form. 2010`Spccial Inspection Iorms`SI 20-20-0992
WiIIiam.doc 10 (,2020