Loading...
ENG2021-0363 ROW PERMITTE RIGHT OF WAY EUC PERMIT 'All f PERMIT NUMBER City of • • • Ave N, Edmonds WA 98020ENG2021-0363 www.cityofedmonds.gov Description: ZIPLY-NEW FIBER SERVICE TO 5 APARTMENT BUILDINGS ISSUED: 10/04/2021 Address: 23207 HIGHWAY 99 S EDMONDS WA 98026 EXPIRES: 04/04/2022 Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00576700001411 NAME TYPE NAME ADDRESS PHONE APPLICANT ZIPLY FIBER 1800 41ST ST, EVERETT WA 98201 (425)949-0230 CONTRACTOR PACIFIC CABLE CONSTRUCTION PO BOX 573, WOODINVILLE WA 98072 (425)348-7735 OWNER PAUL & BARBARA STEPHANUS LLC 1140 PARKSIDE DR E, SEATTLE WA 98112 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00 RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $0.00 • REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 10/04/2021 RELEASED BY DATE Printed: Monday, October 04, 2021 1:52:18 PM 1 of 2 -KRWOF WAY EUC PERMIT City of • • • •:• •ENG2021-03,163 www.cityofedmonds.gov• • CONDITIONS CONDITION TYPE Easement and/or permission from adjacent property owner is required prior to entry or work within ADJACENT PROPERTY an adjacent property. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. Alert affected residents and/or businesses prior to work start. Verify clear bore crossings. ENGINEERING OTHER Restore landscape to like or better conditions. Call for required inspections as noted. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on SOUND OR NOISE weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. TRAFFIC CONTROL Traffic Control per approved plan and MUTCD. All Flaggers shall be certified. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START X-2 ENGINEERING FINAL" E-7 TRAFFIC CTRL Printed: Monday, October 04, 2021 1:52:18 PM 2 of 2 ENG2021-0363 of EDMOtios RECEIVED RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION SEP 10 2021 Complete and submit this Application in accordance with the Submittal CITY OF EDMONDS /Ivc. i sa° Requirements outlined in Right -of -Way permit Handout E6�. DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A' instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A General • Project Name Ziply Fiber 5505237 Site Address or if no site address use Property Address at NW corner of project area: 23231 Hwy 99, Edmonds Associated Permits: BLD PLN ENG Owner and Entity Holding Franchise (if applicable) Name of Company Ziply Fiber Franchise Ordinance No: WN U-17 Point of Contact David Collins Title Engineer Address 1800 41 St St, Ste N 100 city Everett State WA Zip 98203 Phone Email david.collins@ziply.com Contractor and Authorized Agent of Owner (see note below) Name of Company Pacific Cable Construction Contractor Contacts Primary Name During Construction Danielle Harrera Agent Name Danielle Herrera Title Permit Manager Title Permit Manager Mobile 425-348-7735 Address PO BOX 573 Email danielle@paccab.com City Woodinville State WA Zip 98072 Secondary Name Phone 425-348-7735 Title Email danielle@paccab.com Mobile City of Edmonds Business License No: PACI FCC954PJ Email State License No: 3636CON 1096 Of Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as welt ❑ Traffic Control Only (no associated development) Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) Telecommunications and broadband arovider Zialy Fiber to Close SE bound right lane on 236th St SW to run red jumper to H40o6. Close E bound right lane on 234th St SW to place new fiber cable. Close W bound right lane on 234th St SW to place new fiber cable. Close N bound right lane on 77th PI W to place new fiber cable. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF I x LF SF o Alley 72 hours + LF Ix I LF SF o Parking 72 hours + LF Ix I LF SF o SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTIONC. 1. The work in the right of way is on or for the following type of facilities: VZtelecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes No x 2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? x If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? x 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? x 5. Does the work involve proposed additions to an aboveground utility stem? If es: x Are the additions for the purpose of serving new commercial development? x Are the additions for the purpose of serving a single-family residential subdivision? x Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the x project is proposed: 6a. Does your project involve wires/cables/lines? If yes: x How many are existing? I I How many are to be added? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: x How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: x How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: APPLICANT PRINTED NAME: APPLICANT TITLE: NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 Dnm:jI [I L SNOIlCDdSNI _1­1V 3-inaDHOS DIS02J3 JOORJ31 51419-H LLKWAXX-5505237 PACIFIC PARK APTS BF 177 MDU - READY LINK 23231 HWY 99, EDMONDS WA 98037 I•zoz/t,0/0 (1310N SV 43AO0 tlddV RED JUMPER AT FDH H4006 - FC1030, 263 -264 TO H4006, 301 - 304NOISIAId JNI2J33NIJN3 �I1f1 PLACE 300' OF 24F FROM SNOHOMISH OWNED POLE 7. S NO UNDERGROUND EXISTING PATH IS ESTABLISHED FROM POLE 7 TO HH 2 IN THE APT COMPLEX, '2J3NMO FIBER FOLLOWING 300 PAIR COPPER IN CONDUIT •joefoJd pallpied ayj 6uprip san000 Jo pasneo sl ;eLIj spJepue}s Alp Jad AERIAL SPLICE 24F TO 144F AT POLE 7 - 24-FIBER HLLKWAXX 4QQrM*1 14-A�q L9LU@noJdwi LEAVE 100' LOOP AT POLE 7 OF 24F abe;uoa; Jo saijilp of abewep PULL 300' OF 24F FROM POLE TO HH 2 INSTALL SPLICE CASE DHIft4MWdaJ/aled9a Ileys;ueollddV IN: H4006, 301-302 OUT: S4007, 1-16 PLACE 1209' OF 48F LEAVING TWO 50' FIBER LOOPS IN HH PLACE (1) 12-PORT MST TERMINAL & (1) 24 PORT RL SWITCH TO SERVE EACH BUILDING A - E 2301h St SW 2301h St SW Q Studio Sage Recording a m v f Public Storage Q m Kaman Auctions Les Schwab Tire Center V _ Q Another Castle /Video Games Edm Inds 99 Apartments f 234th St SW 234th S1 sw Naz Auto Sales car eea U-Haul Neighborhood Dealc- Kim &Kim O 0 Caliber Collision 0 WhtrlyOallQ RECEIVED SEP 10 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT -paainbaa si ABlJIano qjp m Iln} a u@qj sE)LPE4W4 11TOA\PPROVED FOR WORK THROUGH ojul pualxe sepled Ajqp ajayM -ALnnpeol c I VVE a.CONDUIT ONLY. NO BORING SHALL aLlj o1 puaIxa Ileys /(elaano aLlj `aue laxu`�uigj!m �(laailue Ilej sepled �(j!pn aaayM -E)TAKAj4kCE. A REVISION SHALL BE -auj uo 6u puadap pajin aj aq IIIm8W43 ­IJTTED PRIOR TO ANY BORING TAKING jIeu ao gipinn Ilnj pue pauigwoo @%IIeus spe� �l11f1 O 19 I O'Reilly Auto Parts Armadillo Self Storage SS Motors Q Q !. ea car aver Sunset Villa Apartments Vikings Auto Services El •23231 Hwy 99, Edmonds, WA 98026 QPacific Park Apartment Homes 233rd PI SVV 231 at St SW 232nd St SW 234th St SVI 214th St CY; 2.111 St SW WORK AREA 5SO5237 - PACIFIC PARK 23231 HWY 99, EDMONDS WA Fashion Images e L..Sc H n tI 0. Itebw. Ba. aclick eeror. rou dl4 �.nhhgtoY,,.a@ 24 FIBER - 450' 48 FIBER - 1309' 12 PORT MST TAIL 200' - 3 12 PORT MST TAIL 500' - 2 24 PORT READYLINK SWITCHES - 5 1 X8 SPUTTER - 2 CONSTRUCTION HOURS PLACING:31 SPLICING: 119 INSPECTORA FLAGGING:8 CONTACT LIST ENGINEER: MIKE HAKAHAN 425.949.0230 INSPECTOR: NICK NICHOLSON 208.255.9764 OPCEN: JOHN WOOD 425.261.1412 DESIGNED BY: MIKE PLANT - MICHAEL.PLANT@ATCOTELECOM.COM PERMIT MUNICIPALITY: ❑ BLANKET ® TCP/TRAFFIC DO DETAILED(NOT BLANKET) JOINT POLE JFN/NJUNS TICKET # POLE OWNER: TO: ONO PERMIT REQUIRED CONSTRUCTION REQUIREMENTS ® FLAGGING ❑ BRUSHING ® CONTRACTOR POINTS OF CONTACT SCHEDULING: JOHN WOOD 425.261.1412 ENGINEER: MIKE HAKAHAN 425-949-0230 FACILITIES: EVERETT CUSTOMER CONTACT: CALL BEFORE YOU DIG! - 811 CONSTRUCTION START: 6/25/21 IN SERVICE DATE: X I CERTIFY THAT THE WORK I COMPLETED ON THIS WORK ORDER AND AS -BUILT IS IN COMPLIANCE WITH ZIPLY FIBER QUALITY STANDARDS AS IDENTIFIED ON THE IPQIP CHECKLIST. IGNATURE AND DA II UNITS/ACCT CODES II REVISIONS I ziply BF 177 MDU - PACIFIC PARK APTS 23231 HWY 99 PROJECT NUMBER: 5505237 C.O.AREA, EXCH.CODE: WA HALLS LAKE 1 DRAWN DATE: ENGR: MICHAELPLANT CITY: 111111111 517/2021 PHONE:---- FILE: MDU - 23231 HWY 99 SCALE: 1:100 TAX DISTRICT: ---- DWG 1 OF 4 TWNSHP:27 RNG: 04 SEC 31 23530 76TH AVE W 236TH ST SW (236TH ST SW) RECEIVED w I R B N SEP 10 2021 Q XD,1-8+ = ~ HLLKWAXX H4006,249-340+ XD,101-144 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT w IIQ �I II V O �1 7515 236TH ST SW UNITS /ACCT CODES � I 236Ty \ � 1 7604 236TH ST SW I � II w I Q I RED JUMPER FC10307 263-264 (TO) H40067 301-304 �I Q0I HLLKWAXX H4006 \ FDH 48/432 IN:HLLKWAXX FC1030,241-246+ HLLKWAXX FC1030,247-249+ HLLKWAXX FC1030,250-264 OUT: HLLKWAXX H4006,1-432 II REVISIONS ziply fiber BF 177 MDU - PACIFIC PARK APTS 23231 HWY 99 PROJECT C.O. EA NUMBER: EXCH.CODE : 5505237 XCH.: WA HALLS LAKE 2 """'AT': RAWNDATE FNGR: MICHAEL PLANT CNTY: SNOHOMISH 517/2021 PHONE---- FILE: MDU - 23231 HU 99 SCALE, 1:45.8 TAX DISTRICT: ---- DWG 2 OF 4 ITWNSHR 27 RING 04 ISEC 31 OP43H - 300 - PLACE CABLE IN OCC DUCT - 2422.201 P22E - 25 - PLACE AERIAL CABLE - 2421.201 / / - 310 - PLACE CABLE IN OCC DUCT - 2422.201 OP43H 2 P43J - 130 - PLACE FIBER TAIL - 2422.201 / - 275- PLACE CABLE IN OCCDUCT - 2422.201 / OP43H P43J - 96 -PLACE FIBER TAIL - 24422.201 P43H - 425 - PLACE CABLE IN OCC DUCT - 2422.201 , 4 P43J - 140 - PLACE FIBER TAIL - 2422.201 / HLLKWAXX OP43J - 341 - PLACE FIBER TAILS - 2422.201 O 12-PORT 500' TAIL ,Z / HLLKWAXX FT-693105 IN: H LLKWAXX S4007,1-2+ / XD,3-12 SERVING RANGE / FIBER LOOP 353503 101-312 48-FIBER PLACE (1) GL-24XT-2400-RV / OI HLLKWAXX S4007,1-6+ / B 12-PORT 200TAIL XD,7-48 / HLLKWAXX 1 IN:HLLKWAXXX S4054007,3-4+ HLLKW � X 4 XD,3-12 / / SERVING RANGE 50' FIBER LOOP C PLACE ( / 48-FIjE PLACE (1) GL-24XT-2400-RV /^` O T 500' TAIL HLLKWAXX HLLKWAXX FT-693103 IN: HLLKWAXX S4007,9-10+ -XD,3-12 SERVING RANGE /1717 101-313 / PLACE (1) GL-24XT-2400-RV 534' 48-FIBER HLLKWAXX S4007,1-4+ XD,5-48 �yo P� 50' FIB4R L P HLLKWAXX 6 8RME�,� G_� - - - - - - g2gO2� 15 �yo 225-- 1-2„O 96' P3g6o1 1-20 I CGyS 528, IV 112' 1-2" 23211 HWY 99 5 16 200' �Q_`O�p BUILDING A 1-2., Q b�^ PA��a 36 UNITS PL (1) 24 PORT RI SWITCH I /4 5 0 2�211p1 X�P 140' \`\ 1-2., OL�GES P'1601,6yo C,9 �528, PL (1) 24 PORT RL SWITCH O \\ Cgy 23223 HWY 99 PL (1) 24 PORT RL SWITCH BUILDING C 39 UNITS / 405' 11 O 12-PORT 200' TAIL / HLLKWAXX FT-693102 48-FIBER HLLKWAXX S4007,1-6+ , \�275' 1-2" IN:HLLKWAXX S4007,7-8+ XD,7-48 XD,3-12 / SERVING RANGE / r 101-311 PL (1I12 P( PLACE (1) GL-24XT-2400-RV / 50' FIBER LOOP O 12-PORT 500' TAIL / / 48-FIBER HLLKWAXX FT-693104 IN: H LLKWAXX S4007,5-6+ II XD,3-12 SERVING RANGE / 3 101-311 / PLACE (1) GL-24XT-2400-RV HLLKWAXX 3 C 23207 HWY 99 BUILDING E 33 UNITS RT RL SWITCH A C� m°C 23229 HWY 99 BUILDING D 33 UNIT 96' 1 310' Ile 4� .b ' // W / I HLLKWAXX S4007 SPLICE - TERM SPUTTER IN:HLLKWAXX H4006,301-302+ XD,3-24 OUT:HLLKWAXX S4007,1-16 4A / HLLKWAXX 2 ,I 50' FIBER LOOP 48-FIBER FIBER LOOP 353502 369' 48-FIBER / 48-FIBER 48 HLLKWAXX S4007,1-8+ HLLKWAXX S4007,1-8+ / XD,9-48 XD,9-48 I SPLICING TASKS BS14 - 1 -FIBER SETUP - 2422.201 2 S50A - 4 - SPLICE 48 OR LESS - 2421.201 S12D -1 - REARRANGE CLOSURE - 2422.201 BS14 - 5 - FIBER SETUP - 2422.201 S50A - 17 - SPLICE 48 OR LESS - 2422.201 3 S13D - 1 - FIXED COUNT TERMINAL - 2422.201 S14B - 1 - PLACE CARRIER UNIT - 2422.201 S12C - 1 - PLACE CLOSURE NON-RDY ACCESS - 2422 BS14 - 2 - FIBER SETUP-2422.201 S14B - 1 - PLACE CARRIER UNIT - 2422.201 S13D - 1 - FIXED COUNT TERMINAL - 2422.201 S12C - 1 - PLACE CLOSURE NON-RDY ACCESS - 2422.201 BS14 - 2 - FIBER SETUP-2422.201 S14B - 1 - PLACE CARRIER UNIT - 2422.201 S13D - 1 - FIXED COUNT TERMINAL - 2422.201 S12C - 1 - PLACE CLOSURE NON-RDY ACCESS - 2422.201 BS14 - 2 - FIBER SETUP-2422.201 S14B - 2 - PLACE CARRIER UNIT - 2422.201 S13D - 2 - FIXED COUNT TERMINAL - 2422.201 S12C - 1 - PLACE CLOSURE NON-RDY ACCESS - 2422.201 450' 24-FIBER CW H4006,301-304+ �I XD,5-24 d 100' 24F LOOP 309202 � I HLLKWAXX H4006,301-304+ I --�-24.--_ I -�I PL (1) 24 PORT RL SWITCH 23215 HWY 99 BUILDING B 33 UNITS I 1' FIBER LOOP l-FIBER / 445' / AEF 300 24 C95ES 28,601-675+ C95ES 28,701-900 __HLLKWAXX 1 SNOHOMISH COUNTY PUD #1 300, 1-2" FTTP PIGTAIL 1000FT 4 HLLKWAXX H4006,296-299 // CONSTRUCTION NOTE: ALL HANDHOLES ARE EXISTING, SIZE IS UNKNOWN UG EXSITING PATH IS ESTABLISHED FROM POLE 7 TO HH 2 IN THE APT COMPLEX, PULL FIBER FOLLOWING 300 PAIR COPPER IN CONDUIT 234TH ST SW HLLKWAXX 7 SNOHOMISH COUNTY PUD #1 / RBN D XD,1-8+ XD HLLKWAXX H4006,249-340+ XD,101-144 C 24F UG AT POLE 7 I 3 RECEIVED SEP 10 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT II UNITS/ACCT CODES I II REVISIONS I Zlply BF 177 MDU - PACIFIC PARK APTS 23231 HWY 99 PROJECNUMBER: 5505237 C.O.AREA, EXCH.CODE: WA HALLS LAKE DRAWN DATE: ENGR: MICHAEL PLANT CNTY: SNOHOMISH 517/2021 PHONE:---- FILE: MDU - 23231 HWY 99 SCALE, 1:100 TAX DISTRICT: ---- DWG 3 OF 4 TWNSHP:27 RNG, 04 SEG 31 12-PORT 500' TAIL HLLKWAXX FT-693105 IN:HLLKWAXX S4007,1-2+ XD,3-12 SERVING RANGE 101-312 PLACE (1) GL-24XT-2400-RV 12-PORT 200' TAIL HLLKWAXX FT-693106 IN:HLLKWAXX S4007,3-4+ XD,3-12 SERVING RANGE 101-311 PLACE (1) GL-24XT-2400-RV 12-PORT 500' TAIL HLLKWAXX FT-693103 IN:HLLKWAXX S4007,9-10+ XD,3-12 SERVING RANGE 101-313 PLACE (1) GL-24XT-2400-RV 12-PORT 200' TAIL HLLKWAXX FT-693102 IN:HLLKWAXX S4007,7-8+ XD,3-12 SERVING RANGE 101-311 PLACE (1) GL-24XT-2400-RV 12-PORT 500' TAIL HLLKWAXX FT-693104 IN:HLLKWAXX S4007,5-6+ XD,3-12 SERVING RANGE 101-311 PLACE (1) GL-24XT-2400-RV 23211 HWY 99 BUILDING A HLLKWAXX S4007 SPLICE - TERM SPUTTER IN:HLLKWAXX H4006,301-302+ XD,3-24 OUT:HLLKWAXX S4007,1-16 23215 HWY 99 BUILDING B 48F 4 300' 24-FIBER 23223 HWY 99 HLLKWAXX H4006,301-304+ BUILDING C XD,5-24 23229 HWY 99 BUILDING D 23207 HWY 99 BUILDING E RECEIVED SEP 10 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT II UNITS /ACCT CODES I II REVISIONS Zlply fiber BF 177 MDU - PACIFIC PARK APTS 23231 HWY 99 PROJECT 5505237 C.O. AREA', NUMBER: EXCH.CODE: WA HALLS LAKE 4ITWNSHR DRAWN DATE: FNGR: MICHAEL PLANT CNTY: SNOHOMISH 517/2021 PHONE:---- FILE: MDU - 23231 HU 99 SCALE, 1:52.6 TAX DISTRICT: ---- DWG 4 OF 4 27 RING 04 ISEC 31 ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, N MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) 41 ft O RECEIVED ATCO COMMUNICATIONS SERVICES, LLC www.atcotelecom.com / f 360.563.9000 Armadillo Self Storage Q SEP 10 2021 708 First Street Snohomish, WA 98290 3 WSTCS# 012911 > _ _ CITY OF EDMONDS Q — DEVELOPMENT o Les Schwab Tire Center SERVICES DEPARTMENT zI I f i be r n? py Everett, WA 98208 23231 Hwy 99, Edmonds, WA 98026 rM N 3 Ln c0 > � Another Castle 3 Video Games a o � r Q 9 u a- o� 99 t 0 0 0 I w Cr W ai �! rn W Ln 234th St SW 234th St SW n = _ o WORK AREA N cf) N WhirlyBall 7 LLJ D < \ A nr O WW U CT 130 St r M o 236th St SW 236th St SW i W z Dollar Tree � / > ; a Z WORK AREA s a� a a o < a' cD s� t DATE: 09.08.2021 Family Pancake DESIGNED BY: K. BUXTON House Edmonds � ATCO CONTACT: 360.853.6418 kateryno.buxton®atcotelecom.com SCALE: SHEET: VICINITY MAP JOT To 01 SCALE NO: 1 OF 5 LEGEND: 2 SIGNALIZED INTERSECTION O CONE (CANDLESTICK) TYPE III BARRICADE WORK TRUCK WORK ZONE LIMITS OWE WARNING SIGN ARROW BOARD (WHERE REQUIRED) DIRECTION OF TRAFFIC NOT PAVEMENT MARKINGS) FLAGGER (AS NEEDED) ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM INSPECTION REQUIRED BUFFER AREA LONGITUDINAL BUFFER SPACE = B POSTED SPEED (MPH) 25 30 35 40 45 50 55 60 64 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R HOST VEHICLE WEIGHT (Ibs) 9,900 TO 22,000 HOST VEHICLE WEIGHT (Ibs) > 22,000 < 45 MPH 45 - 55 MPH > 55 MPH < 45 MPH 45 - 55 MPH > 55 MPH 100, 123' 172' 74' 100, 150' 76th Ave W (25 MPH) 19 NOTE: MON. - FRI. = 7:00am TO 4:00pm I 10' CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 50/70 40 80 35/45 30 60 25/30 20 40 MINIMUM LANE CLOSURE TAPER LENGTH = L (feet) LANE POSTED SPEED (MPH) WIDTH (feet) 25 30 35 40 45 50 55 60 1 65 70 10 105 150 205 270 450 500 550 600 650 700 11 115 165 225 295 495 550 605 660 715 770 12 125 180 245 320 540 600 660 720 780 840 PHASE 1- ENGINEERING DIVISION APPROVED AS NOTED JA (,V6,1,H..44z 10/04/2021 VV 6 RECEIVED SEP 10 2021 ilk"O ATCO COMMUNICATIONS SERVICES. LLC www.atcotelecom.com 360.563.9000 708 First Street Snohomish, WA 98290 WSTCS# 012911 CITY OF EDMONDS DEVELOPMENT I I f i b e r SERVICES DEPARTMENT Everett, WA 98206 SIGN SPACING = X (1) FREEWAY & EXPRESSWAYS 55 / 70 MPH 1500' ± RURAL HIGHWAYS 60 / 65 MPH 800' ± RURAL ROADS 45 / 55 MPH 500' ± RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH 350' ± RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200' ± (2) URBAN STREETS 25 MPH OR LESS 100'± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. M04 N O O N z 3 -o ~ L0 cy) Q W Q Of r o c O c 0 U � E I t7 O) N O 0 O T 3 = M Lr) ry � N M N PO C14 O U N � o Z -C W o Q W W Q � Z a a DATE: 09.08.2021 DESIGNED BY: K. BUXTON ATCO CONTACT: 360.853.6418 kateryna.buxton@atcotelecom.com SCALE: 1 50' SHEET- 22 NO: 2OF5 LEGEND: O SIGNALIZED INTERSECTION O CONE (CANDLESTICK) TYPE III BARRICADE WORK TRUCK WORK ZONE LIMITS OWE WARNING SIGN (WHERE REQUIRED) DIRECTION OF TRAFFIC NOT PAVEMENT MARKINGS) FLAGGER (AS NEEDED) ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) �W20-4Z7A— 200'200' 0 1. /-W20-1 78th Ave W (25 MPH) BUFFER AREA LONGITUDINAL BUFFER SPACE = B POSTED SPEED (MPH) 25 30 35 40 45 50 55 60 64 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R HOST VEHICLE WEIGHT (Ibs) 9,900 TO 22,000 HOST VEHICLE WEIGHT (Ibs) > 22,000 < 45 MPH 45 - 55 MPH > 55 MPH < 45 MPH 45 - 55 MPH > 55 MPH 100, 123' 172' 74' 100, 150' 77th Pl W (25 MPH) I n O O 50' — 100' —LANE, TWO WA TRAFFIC TAPER NOTE: MON. - FRI. = 7:00am TO 4:00pm PHASE 2 WORK DETAILS: 0 PLACE NEW FIBER CABLE. w SPOTTER NEEDED FOR PEDESTRIAN TRAFFIC AND DRIVEWAY ACCESS, 200"J�200'�200"� W20-7A W20-4 W20-11 G— 10 MIN. ==> � Y XX�a� bl X O O 0 234th St SW (25 MPH) CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 50/70 40 80 35/45 30 60 25/30 20 40 MINIMUM LANE CLOSURE TAPER LENGTH = L (feet) LANE POSTED SPEED (MPH) WIDTH (feet) 25 1 30 35 40 45 50 1 55 60 1 65 70 10 105 150 205 270 450 500 550 600 650 700 11 115 165 225 295 495 550 605 660 715 770 12 125 180 245 320 540 600 660 720 780 840 N (b RECEIVEDATCO COMMUNICATIONS SERVICES, LLLC www.atcotelecom.com SEP 10 2021 360-563.9000 I 708 First Street Snohomish, WA 98290 WSTCS# 012911 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT z ipy I f I b e r Everett, WA 98206 SIGN LEGEND: ROAD ONE LANE � WORK ROAD AHEAD AHEAD W20-1 W20-4 W20-7A SIGN SPACING = X (1) FREEWAY & EXPRESSWAYS 55 / 70 MPH 1500' ± RURAL HIGHWAYS 60 / 65 MPH 800' ± RURAL ROADS 45 / 55 MPH 500' ± RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH 350' ± RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200' ± (2) URBAN STREETS 25 MPH OR LESS 100'± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. M04 N O O N z 3 -o ~ L0 L0 � < Q � < Q D_ � r o c O c 0 U � ;_ W I I J M O) O N 0 0 = M `n N N PO C14 O U N N LL M G z -C I; i Q O W W Q � Z a a DATE: 09.08.2021 DESIGNED BY: K. BUXTON ATCO CONTACT: 360.853.6418 kateryna.buxton@atcotelecom.com SCALE: SHEET- 1 50' 03 NO: 3OF5 LEGEND: 0 SIGNALIZED INTERSECTION O CONE (CANDLESTICK) TYPE III BARRICADE WORK TRUCK WORK ZONE LIMITS OWE WARNING SIGN (WHERE REQUIRED) DIRECTION OF TRAFFIC NOT PAVEMENT MARKINGS) FLAGGER (AS NEEDED) ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, OAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) W20-7A 78th Ave W (25 MPH) BUFFER AREA LONGITUDINAL BUFFER SPACE = B POSTED SPEED (MPH) 25 30 35 40 45 50 55 60 64 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R HOST VEHICLE WEIGHT (Ibs) 9,900 TO 22,000 HOST VEHICLE WEIGHT (Ibs) > 22,000 < 45 MPH 45 - 55 MPH > 55 MPH < 45 MPH 45 - 55 MPH > 55 MPH 100, 123' 172' 74' 100, 150' 4 7A NOTE: MON. - FRI. = 7:00am TO 4:00pm 77th Pl W (25 MPH) d G�= 10' MIN. ==> 50' — 100' E—LANE, TWO WA TRAFFIC TAPER CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 50/70 40 80 35/45 30 60 25/30 20 40 MINIMUM LANE CLOSURE TAPER LENGTH = L (feet) LANE POSTED SPEED (MPH) WIDTH (feet) 25 30 35 40 45 50 55 60 1 65 70 10 105 150 205 270 450 500 550 600 650 700 11 115 165 225 295 495 550 605 660 715 770 12 125 180 245 320 540 600 660 720 780 840 PHASE 3 WORK DETAILS: 0 PLACE NEW FIBER CABLE. N RECEIVED SEP 10 2021 CITY OF EDMONDS ,itO ATCO COMMUNICATIONS SERVICES. LLC www.atcotelecom.com 360.563.9000 708 First Street Snohomish, WA 98290 WSTCS# 012911 DEVELOPMENT SERVICES DEPARTMENT I I f i b e r py Everett, WA 98206 w SPOTTER NEEDED FOR PEDESTRIAN TRAFFIC AND DRIVEWAY ACCESS, 234th St SW (25 MPH) SIGN LEGEND: ROAD ONE LANE � WORK ROAD AHEAD AHEAD W20-1 W20-4 W20-7A SIGN SPACING = X (1) FREEWAY & EXPRESSWAYS 55 / 70 MPH 1500' ± RURAL HIGHWAYS 60 / 65 MPH 800' ± RURAL ROADS 45 / 55 MPH 500' ± RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH 350' ± RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200' ± (2) URBAN STREETS 25 MPH OR LESS 100'± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. M04 N O O N z 3 -o ~ L0 L0 � < Q � < Q D_ � � r o c 0 � c 0 U � E w I t7 O) N O 0 O T 3 = M Lr) ry � N N PO C14 O U N N LL_ M G LL z < W O w W WQ Q � Z a a DATE: 09.08.2021 DESIGNED BY: K. BUXTON ATCO CONTACT: 360.853.6418 kateryna.buxton@atcotelecom.com SCALE: 1 50' SHEET- 04 NO: 4OF5 LEGEND: O SIGNALIZED INTERSECTION O CONE (CANDLESTICK) TYPE III BARRICADE WORK TRUCK WORK ZONE LIMITS OWE WARNING SIGN (WHERE REQUIRED) IRECTION OF TRAFFIC NOT PAVEMENT MARKINGS) FLAGGER AS NEEDED) w2o-1 0 N WORK DETAILS: (D PLACE NEW FIBER CABLE, SPOTTER NEEDED FOR PEDESTRIAN TRAFFIC AND DRIVEWAY ACCESS, o\R DEAD END 233rd Pl SW (25 MPH) 2pb, SIGN LEGEND: ROAD ONELANE WORK ROAD AHEAD AHEAD W20-1 W20-4 W20-7A �q ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) BUFFER AREA LONGITUDINAL BUFFER SPACE = B POSTED SPEED (MPH) 25 30 35 40 45 50 55 60 64 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R HOST VEHICLE WEIGHT (Ibs) 9,900 TO 22,000 HOST VEHICLE WEIGHT (Ibs) > 22,000 < 45 MPH 45 - 55 MPH > 55 MPH < 45 MPH 45 - 55 MPH > 55 MPH 100, 123' 172' 74' 100, 150' NOTE: MON. - FRI. = 7:00am TO 4:00pm f_'•�iC�Iif[' RIM--012 (25 MPH) W20-1 I 0 I 0 N tW20-741 0 0 N rW20-71 0 I 0 N I • O CC 10' MIN. 77th Pl W (25 MPH) CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 50/70 40 80 35/45 30 60 25(30 20 40 MINIMUM LANE CLOSURE TAPER LENGTH = L (feet) LANE POSTED SPEED (MPH) WIDTH (feet) 25 1 30 35 40 45 50 1 55 60 1 65 70 10 105 150 205 270 450 500 550 600 650 700 11 115 165 225 295 495 550 605 660 715 770 12 125 180 245 320 540 600 660 720 780 840 PHASE a 78th Ave W 0 (25 MPH) 0 �W20-1 N � 12 4 "-0 ECEIVED ,EP 10 2021 A" O __N ATCO COMMUNICATIONS SERVICES. LLC www.atcotelecom.com 360.563.9000 708 First Street Snohomish, WA 98290 WSTCS# 012911 ITV OF EDMONDS I I f i b e r DEVELOPMENT p y VICES DEPARTMENT Everett, WA 98206 SIGN SPACING = X (1) FREEWAY & EXPRESSWAYS 55 / 70 MPH 1500' ± RURAL HIGHWAYS 60 / 65 MPH 800' ± RURAL ROADS 45 / 55 MPH 500' ± RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH 350' ± RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200' ± (2) URBAN STREETS 25 MPH OR LESS 100'± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. M04 N O O N z 3 -o ~ L0 L0 cy) < Q -r- < _j Of � r o c 0 � c 0 U � ;_ w I _j r- O) N 0 O L0 O T 3 = M Lr) ry � N M N PO C14 O U N M G z -C I; i o Q WW Q Z a a DATE: 09.08.2021 DESIGNED BY: K. BUXTON ATCO CONTACT: 360.853.6418 kateryna.buxton@atcotelecom.com SCALE: SHEET- 1 50' 0b NO: 5OF5