ENG2021-0363 ROW PERMITTE
RIGHT OF WAY EUC PERMIT
'All f
PERMIT NUMBER
City of • • •
Ave N, Edmonds WA 98020ENG2021-0363
www.cityofedmonds.gov
Description: ZIPLY-NEW FIBER SERVICE TO 5 APARTMENT BUILDINGS ISSUED: 10/04/2021
Address: 23207 HIGHWAY 99 S EDMONDS WA 98026
EXPIRES: 04/04/2022
Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00576700001411
NAME TYPE NAME ADDRESS PHONE
APPLICANT ZIPLY FIBER 1800 41ST ST, EVERETT WA 98201 (425)949-0230
CONTRACTOR PACIFIC CABLE CONSTRUCTION PO BOX 573, WOODINVILLE WA 98072 (425)348-7735
OWNER PAUL & BARBARA STEPHANUS LLC 1140 PARKSIDE DR E, SEATTLE WA 98112
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00
RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $0.00
•
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
10/04/2021
RELEASED BY
DATE
Printed: Monday, October 04, 2021 1:52:18 PM 1 of 2
-KRWOF WAY EUC PERMIT
City of • • •
•:• •ENG2021-03,163
www.cityofedmonds.gov• •
CONDITIONS
CONDITION TYPE
Easement and/or permission from adjacent property owner is required prior to entry or work within
ADJACENT PROPERTY
an adjacent property.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
Alert affected residents and/or businesses prior to work start.
Verify clear bore crossings.
ENGINEERING OTHER
Restore landscape to like or better conditions.
Call for required inspections as noted.
ESC REQ
Maintain erosion and sedimentation control per City and SWMMW standard requirements.
Sound/Noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on
SOUND OR NOISE
weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites/activities must comply with the noise limits
of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
TRAFFIC CONTROL
Traffic Control per approved plan and MUTCD. All Flaggers shall be certified.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL"
E-7 TRAFFIC CTRL
Printed: Monday, October 04, 2021 1:52:18 PM 2 of 2
ENG2021-0363
of EDMOtios RECEIVED
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION SEP 10 2021
Complete and submit this Application in accordance with the Submittal CITY OF EDMONDS
/Ivc. i sa° Requirements outlined in Right -of -Way permit Handout E6�. DEVELOPMENT
SERVICES DEPARTMENT
If any field is not applicable to your project, write "N/A' instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General •
Project Name Ziply Fiber 5505237
Site Address or if no site address use Property Address at NW corner of project area: 23231 Hwy 99, Edmonds
Associated Permits: BLD PLN ENG
Owner and Entity Holding Franchise (if applicable)
Name of Company Ziply Fiber Franchise Ordinance No: WN U-17
Point of Contact David Collins
Title Engineer
Address 1800 41 St St, Ste N 100
city Everett
State WA
Zip 98203
Phone
Email david.collins@ziply.com
Contractor and Authorized Agent of Owner (see note below)
Name of Company Pacific Cable Construction
Contractor Contacts
Primary Name
During Construction
Danielle Harrera
Agent Name Danielle Herrera
Title
Permit Manager
Title Permit Manager
Mobile
425-348-7735
Address PO BOX 573
Email
danielle@paccab.com
City Woodinville
State WA
Zip 98072
Secondary Name
Phone 425-348-7735
Title
Email danielle@paccab.com
Mobile
City of Edmonds Business License No: PACI FCC954PJ
Email
State License No: 3636CON 1096
Of
Contractor verifies it is currently bonded
Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as welt
❑ Traffic Control Only (no associated development)
Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
Telecommunications and broadband arovider Zialy Fiber to
Close SE bound right lane on 236th St SW to run red jumper to H40o6. Close E bound right lane on 234th St SW to
place new fiber cable. Close W bound right lane on 234th St SW to place new fiber cable. Close N bound right lane
on 77th PI W to place new fiber cable.
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
I x
LF
SF
o
Alley 72 hours +
LF
Ix
I LF
SF
o
Parking 72 hours +
LF
Ix
I LF
SF
o
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTIONC.
1. The work in the right of way is on or for the following type of facilities:
VZtelecommunications ❑ cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
Details of Work to be Completed
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
x
2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
x
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
x
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
x
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
x
Are the additions for the purpose of serving new commercial development?
x
Are the additions for the purpose of serving a single-family residential subdivision?
x
Details
of Work to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
x
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
x
How many are existing? I I How many are to be added?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
x
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
x
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE:
APPLICANT PRINTED NAME:
APPLICANT TITLE:
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
Dnm:jI [I L SNOIlCDdSNI _11V 3-inaDHOS
DIS02J3
JOORJ31
51419-H LLKWAXX-5505237
PACIFIC PARK APTS
BF 177 MDU - READY LINK
23231 HWY 99, EDMONDS WA 98037
I•zoz/t,0/0
(1310N SV 43AO0 tlddV
RED JUMPER AT FDH H4006 - FC1030, 263 -264 TO H4006, 301 - 304NOISIAId JNI2J33NIJN3
�I1f1
PLACE 300' OF 24F FROM SNOHOMISH OWNED POLE 7.
S NO
UNDERGROUND EXISTING PATH IS ESTABLISHED FROM POLE 7 TO HH 2 IN THE APT COMPLEX,
'2J3NMO
FIBER FOLLOWING 300 PAIR COPPER IN CONDUIT •joefoJd pallpied ayj 6uprip san000
Jo pasneo sl ;eLIj spJepue}s Alp Jad
AERIAL SPLICE 24F TO 144F AT POLE 7 - 24-FIBER HLLKWAXX 4QQrM*1 14-A�q L9LU@noJdwi
LEAVE 100' LOOP AT POLE 7 OF 24F abe;uoa; Jo saijilp of abewep
PULL 300' OF 24F FROM POLE TO HH 2 INSTALL SPLICE CASE DHIft4MWdaJ/aled9a Ileys;ueollddV
IN: H4006, 301-302
OUT: S4007, 1-16
PLACE 1209' OF 48F LEAVING TWO 50' FIBER LOOPS IN HH
PLACE (1) 12-PORT MST TERMINAL & (1) 24 PORT RL SWITCH TO SERVE EACH BUILDING A - E
2301h St SW 2301h St SW
Q Studio Sage Recording
a
m v
f
Public Storage Q
m
Kaman Auctions
Les Schwab Tire Center
V _
Q
Another Castle
/Video Games
Edm Inds 99
Apartments
f
234th St SW
234th S1 sw
Naz Auto Sales
car eea
U-Haul
Neighborhood Dealc-
Kim &Kim O
0
Caliber Collision
0
WhtrlyOallQ
RECEIVED
SEP 10 2021
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
-paainbaa si ABlJIano qjp m Iln} a u@qj sE)LPE4W4 11TOA\PPROVED FOR WORK THROUGH
ojul pualxe sepled Ajqp ajayM -ALnnpeol c I VVE
a.CONDUIT ONLY. NO BORING SHALL
aLlj o1 puaIxa Ileys /(elaano aLlj `aue laxu`�uigj!m �(laailue Ilej sepled �(j!pn aaayM -E)TAKAj4kCE. A REVISION SHALL BE
-auj uo 6u puadap pajin aj aq IIIm8W43 IJTTED PRIOR TO ANY BORING TAKING
jIeu ao gipinn Ilnj pue pauigwoo @%IIeus spe� �l11f1
O 19 I
O'Reilly Auto Parts
Armadillo Self Storage
SS Motors Q Q
!. ea car aver
Sunset Villa Apartments
Vikings Auto Services
El
•23231 Hwy 99,
Edmonds, WA 98026
QPacific Park
Apartment Homes
233rd PI SVV
231 at St SW
232nd St SW
234th St SVI 214th St CY; 2.111 St SW
WORK AREA
5SO5237 - PACIFIC PARK
23231 HWY 99, EDMONDS WA
Fashion Images
e
L..Sc
H n tI
0.
Itebw. Ba. aclick eeror. rou dl4 �.nhhgtoY,,.a@
24 FIBER - 450'
48 FIBER - 1309'
12 PORT MST TAIL 200' - 3
12 PORT MST TAIL 500' - 2
24 PORT READYLINK SWITCHES - 5
1 X8 SPUTTER - 2
CONSTRUCTION HOURS
PLACING:31
SPLICING: 119
INSPECTORA
FLAGGING:8
CONTACT LIST
ENGINEER: MIKE HAKAHAN 425.949.0230
INSPECTOR: NICK NICHOLSON 208.255.9764
OPCEN: JOHN WOOD 425.261.1412
DESIGNED BY: MIKE PLANT -
MICHAEL.PLANT@ATCOTELECOM.COM
PERMIT
MUNICIPALITY:
❑ BLANKET
® TCP/TRAFFIC
DO DETAILED(NOT BLANKET)
JOINT POLE
JFN/NJUNS TICKET #
POLE OWNER:
TO:
ONO PERMIT REQUIRED
CONSTRUCTION REQUIREMENTS
® FLAGGING
❑ BRUSHING
® CONTRACTOR
POINTS OF CONTACT
SCHEDULING: JOHN WOOD 425.261.1412
ENGINEER: MIKE HAKAHAN 425-949-0230
FACILITIES: EVERETT
CUSTOMER CONTACT:
CALL BEFORE YOU DIG! - 811
CONSTRUCTION START: 6/25/21
IN SERVICE DATE: X
I CERTIFY THAT THE WORK I COMPLETED ON THIS WORK ORDER AND
AS -BUILT IS IN COMPLIANCE WITH ZIPLY FIBER QUALITY STANDARDS AS
IDENTIFIED ON THE IPQIP CHECKLIST.
IGNATURE AND DA
II UNITS/ACCT CODES
II REVISIONS I
ziply
BF 177 MDU - PACIFIC PARK APTS
23231 HWY 99
PROJECT
NUMBER: 5505237 C.O.AREA,
EXCH.CODE: WA HALLS LAKE
1 DRAWN DATE: ENGR: MICHAELPLANT CITY: 111111111
517/2021 PHONE:---- FILE: MDU - 23231 HWY 99
SCALE: 1:100 TAX DISTRICT: ---- DWG 1 OF 4
TWNSHP:27 RNG: 04 SEC 31
23530 76TH AVE W
236TH ST SW (236TH ST SW)
RECEIVED
w I
R B N
SEP 10 2021
Q
XD,1-8+
=
~
HLLKWAXX H4006,249-340+
XD,101-144
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
w
IIQ
�I
II
V O
�1
7515 236TH ST SW
UNITS /ACCT CODES
� I 236Ty \
� 1
7604 236TH ST SW
I
� II
w I
Q I
RED JUMPER
FC10307 263-264
(TO)
H40067 301-304
�I
Q0I
HLLKWAXX H4006 \
FDH 48/432
IN:HLLKWAXX FC1030,241-246+
HLLKWAXX FC1030,247-249+
HLLKWAXX FC1030,250-264
OUT: HLLKWAXX H4006,1-432
II REVISIONS
ziply
fiber
BF 177 MDU - PACIFIC PARK APTS
23231 HWY 99
PROJECT C.O. EA
NUMBER: EXCH.CODE : 5505237 XCH.: WA HALLS LAKE
2 """'AT':
RAWNDATE FNGR: MICHAEL PLANT CNTY: SNOHOMISH
517/2021 PHONE---- FILE: MDU - 23231 HU 99
SCALE, 1:45.8 TAX DISTRICT: ---- DWG 2 OF 4
ITWNSHR 27 RING 04 ISEC 31
OP43H
- 300 - PLACE CABLE IN OCC DUCT - 2422.201
P22E - 25 - PLACE AERIAL CABLE - 2421.201
/
/
- 310 - PLACE CABLE IN OCC DUCT - 2422.201
OP43H
2
P43J - 130 - PLACE FIBER TAIL - 2422.201
/
- 275- PLACE CABLE IN OCCDUCT - 2422.201
/
OP43H
P43J - 96 -PLACE FIBER TAIL - 24422.201
P43H - 425 - PLACE CABLE IN OCC DUCT - 2422.201
,
4
P43J - 140 - PLACE FIBER TAIL - 2422.201
/ HLLKWAXX
OP43J
- 341 - PLACE FIBER TAILS - 2422.201
O 12-PORT 500' TAIL ,Z /
HLLKWAXX FT-693105
IN: H LLKWAXX S4007,1-2+ /
XD,3-12
SERVING RANGE /
FIBER LOOP 353503
101-312
48-FIBER
PLACE (1) GL-24XT-2400-RV /
OI HLLKWAXX S4007,1-6+ /
B 12-PORT 200TAIL XD,7-48 /
HLLKWAXX 1
IN:HLLKWAXXX S4054007,3-4+ HLLKW � X 4
XD,3-12 / /
SERVING RANGE 50' FIBER LOOP
C PLACE ( / 48-FIjE
PLACE (1) GL-24XT-2400-RV /^`
O
T 500' TAIL HLLKWAXX
HLLKWAXX FT-693103
IN: HLLKWAXX S4007,9-10+
-XD,3-12
SERVING RANGE /1717
101-313 /
PLACE (1) GL-24XT-2400-RV
534'
48-FIBER
HLLKWAXX S4007,1-4+
XD,5-48
�yo
P�
50' FIB4R L P HLLKWAXX 6
8RME�,�
G_�
- - -
- - - g2gO2� 15 �yo
225--
1-2„O
96' P3g6o1
1-20
I CGyS 528,
IV 112'
1-2"
23211 HWY 99 5 16
200' �Q_`O�p BUILDING A
1-2., Q b�^ PA��a 36 UNITS
PL (1) 24 PORT RI SWITCH I
/4 5 0 2�211p1
X�P
140'
\`\ 1-2., OL�GES P'1601,6yo
C,9 �528, PL (1) 24 PORT RL SWITCH
O \\ Cgy 23223 HWY 99
PL (1) 24 PORT RL SWITCH BUILDING C
39 UNITS
/
405'
11
O 12-PORT 200' TAIL /
HLLKWAXX FT-693102
48-FIBER
HLLKWAXX S4007,1-6+
,
\�275'
1-2"
IN:HLLKWAXX S4007,7-8+
XD,7-48
XD,3-12 /
SERVING RANGE
/
r
101-311
PL (1I12 P(
PLACE (1) GL-24XT-2400-RV /
50' FIBER LOOP
O 12-PORT 500' TAIL / /
48-FIBER
HLLKWAXX FT-693104
IN: H LLKWAXX S4007,5-6+
II
XD,3-12
SERVING RANGE
/
3
101-311 /
PLACE (1) GL-24XT-2400-RV
HLLKWAXX
3
C
23207 HWY 99
BUILDING E
33 UNITS
RT RL SWITCH A
C�
m°C
23229 HWY 99
BUILDING D
33 UNIT 96' 1 310'
Ile
4� .b ' //
W / I
HLLKWAXX S4007
SPLICE - TERM SPUTTER
IN:HLLKWAXX H4006,301-302+
XD,3-24
OUT:HLLKWAXX S4007,1-16
4A / HLLKWAXX 2 ,I
50' FIBER LOOP
48-FIBER
FIBER LOOP 353502
369'
48-FIBER
/
48-FIBER 48
HLLKWAXX S4007,1-8+
HLLKWAXX S4007,1-8+
/ XD,9-48
XD,9-48
I
SPLICING TASKS
BS14 - 1 -FIBER SETUP - 2422.201
2 S50A - 4 - SPLICE 48 OR LESS - 2421.201
S12D -1 - REARRANGE CLOSURE - 2422.201
BS14 - 5 - FIBER SETUP - 2422.201
S50A - 17 - SPLICE 48 OR LESS - 2422.201
3 S13D - 1 - FIXED COUNT TERMINAL - 2422.201
S14B - 1 - PLACE CARRIER UNIT - 2422.201
S12C - 1 - PLACE CLOSURE NON-RDY ACCESS - 2422
BS14 - 2 - FIBER SETUP-2422.201
S14B - 1 - PLACE CARRIER UNIT - 2422.201
S13D - 1 - FIXED COUNT TERMINAL - 2422.201
S12C - 1 - PLACE CLOSURE NON-RDY ACCESS - 2422.201
BS14 - 2 - FIBER SETUP-2422.201
S14B - 1 - PLACE CARRIER UNIT - 2422.201
S13D - 1 - FIXED COUNT TERMINAL - 2422.201
S12C - 1 - PLACE CLOSURE NON-RDY ACCESS - 2422.201
BS14 - 2 - FIBER SETUP-2422.201
S14B - 2 - PLACE CARRIER UNIT - 2422.201
S13D - 2 - FIXED COUNT TERMINAL - 2422.201
S12C - 1 - PLACE CLOSURE NON-RDY ACCESS - 2422.201
450'
24-FIBER
CW
H4006,301-304+
�I
XD,5-24
d
100' 24F LOOP 309202
� I
HLLKWAXX H4006,301-304+
I
--�-24.--_ I -�I
PL (1) 24 PORT RL SWITCH
23215 HWY 99
BUILDING B
33 UNITS I
1' FIBER LOOP
l-FIBER
/ 445'
/ AEF 300 24
C95ES 28,601-675+
C95ES 28,701-900
__HLLKWAXX 1
SNOHOMISH COUNTY PUD #1
300,
1-2"
FTTP PIGTAIL 1000FT 4
HLLKWAXX H4006,296-299
//
CONSTRUCTION NOTE:
ALL HANDHOLES ARE EXISTING, SIZE
IS UNKNOWN
UG EXSITING PATH IS ESTABLISHED FROM POLE 7 TO
HH 2 IN THE APT COMPLEX, PULL FIBER FOLLOWING
300 PAIR COPPER IN CONDUIT
234TH ST SW
HLLKWAXX 7
SNOHOMISH COUNTY PUD #1
/
RBN
D
XD,1-8+
XD
HLLKWAXX H4006,249-340+
XD,101-144
C
24F UG AT POLE 7 I 3
RECEIVED
SEP 10 2021
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
II UNITS/ACCT CODES I
II REVISIONS I
Zlply
BF 177 MDU - PACIFIC PARK APTS
23231 HWY 99
PROJECNUMBER: 5505237 C.O.AREA, EXCH.CODE: WA HALLS LAKE
DRAWN DATE: ENGR: MICHAEL PLANT CNTY: SNOHOMISH
517/2021 PHONE:---- FILE: MDU - 23231 HWY 99
SCALE, 1:100 TAX DISTRICT: ---- DWG 3 OF 4
TWNSHP:27 RNG, 04 SEG 31
12-PORT 500' TAIL
HLLKWAXX FT-693105
IN:HLLKWAXX S4007,1-2+
XD,3-12
SERVING RANGE
101-312
PLACE (1) GL-24XT-2400-RV
12-PORT 200' TAIL
HLLKWAXX FT-693106
IN:HLLKWAXX S4007,3-4+
XD,3-12
SERVING RANGE
101-311
PLACE (1) GL-24XT-2400-RV
12-PORT 500' TAIL
HLLKWAXX FT-693103
IN:HLLKWAXX S4007,9-10+
XD,3-12
SERVING RANGE
101-313
PLACE (1) GL-24XT-2400-RV
12-PORT 200' TAIL
HLLKWAXX FT-693102
IN:HLLKWAXX S4007,7-8+
XD,3-12
SERVING RANGE
101-311
PLACE (1) GL-24XT-2400-RV
12-PORT 500' TAIL
HLLKWAXX FT-693104
IN:HLLKWAXX S4007,5-6+
XD,3-12
SERVING RANGE
101-311
PLACE (1) GL-24XT-2400-RV
23211 HWY 99
BUILDING A HLLKWAXX S4007
SPLICE - TERM SPUTTER
IN:HLLKWAXX H4006,301-302+
XD,3-24
OUT:HLLKWAXX S4007,1-16
23215 HWY 99
BUILDING B
48F 4 300'
24-FIBER
23223 HWY 99 HLLKWAXX H4006,301-304+
BUILDING C XD,5-24
23229 HWY 99
BUILDING D
23207 HWY 99
BUILDING E
RECEIVED
SEP 10 2021
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
II UNITS /ACCT CODES I
II REVISIONS
Zlply
fiber
BF 177 MDU - PACIFIC PARK APTS
23231 HWY 99
PROJECT 5505237 C.O. AREA',
NUMBER: EXCH.CODE: WA HALLS LAKE
4ITWNSHR
DRAWN DATE: FNGR: MICHAEL PLANT CNTY: SNOHOMISH
517/2021 PHONE:---- FILE: MDU - 23231 HU 99
SCALE, 1:52.6 TAX DISTRICT: ---- DWG 4 OF 4
27 RING 04 ISEC 31
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, N
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) 41 ft
O
RECEIVED ATCO COMMUNICATIONS SERVICES, LLC
www.atcotelecom.com
/ f 360.563.9000
Armadillo Self Storage Q SEP 10 2021 708 First Street
Snohomish, WA 98290
3 WSTCS# 012911
> _ _ CITY OF EDMONDS
Q — DEVELOPMENT o
Les Schwab Tire Center SERVICES DEPARTMENT zI I f i be r
n? py
Everett, WA 98208
23231 Hwy 99,
Edmonds, WA 98026
rM N 3
Ln c0 > �
Another Castle 3
Video Games a o
� r
Q 9
u a-
o� 99 t 0
0 0
I
w Cr W
ai �!
rn W Ln
234th St SW 234th St SW n = _ o
WORK AREA N
cf)
N
WhirlyBall
7 LLJ
D
< \
A
nr
O
WW U
CT 130 St r M o
236th St SW 236th St SW i W
z
Dollar Tree � / > ; a Z
WORK AREA s a� a a o
< a'
cD s� t
DATE: 09.08.2021
Family Pancake DESIGNED BY: K. BUXTON
House Edmonds
� ATCO CONTACT: 360.853.6418
kateryno.buxton®atcotelecom.com
SCALE: SHEET:
VICINITY MAP JOT To
01
SCALE
NO: 1 OF 5
LEGEND:
2
SIGNALIZED INTERSECTION
O
CONE (CANDLESTICK)
TYPE III BARRICADE
WORK TRUCK
WORK ZONE LIMITS
OWE
WARNING SIGN
ARROW BOARD
(WHERE REQUIRED)
DIRECTION OF TRAFFIC
NOT PAVEMENT MARKINGS)
FLAGGER
(AS NEEDED)
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
INSPECTION REQUIRED
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH) 25 30
35
40
45
50
55
60
64
70
LENGTH (feet) 155 200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
76th Ave W
(25 MPH)
19
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
I
10'
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER
TANGENT
50/70 40
80
35/45 30
60
25/30 20
40
MINIMUM LANE CLOSURE TAPER LENGTH = L (feet)
LANE
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
1 65
70
10
105
150
205
270
450
500
550
600
650
700
11
115
165
225
295
495
550
605
660
715
770
12
125
180
245
320
540
600
660
720
780
840
PHASE 1-
ENGINEERING DIVISION
APPROVED AS NOTED
JA (,V6,1,H..44z 10/04/2021
VV
6
RECEIVED
SEP 10 2021
ilk"O
ATCO COMMUNICATIONS SERVICES. LLC
www.atcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
WSTCS# 012911
CITY OF EDMONDS
DEVELOPMENT I I f i b e r
SERVICES DEPARTMENT
Everett, WA 98206
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
M04
N
O
O
N
z 3
-o
~
L0
cy)
Q
W
Q
Of
r
o
c
O
c
0
U
�
E
I
t7
O)
N
O 0
O
T
3
=
M
Lr)
ry �
N
M
N
PO
C14
O
U
N
�
o
Z
-C
W
o
Q
W
W
Q
� Z
a
a
DATE:
09.08.2021
DESIGNED BY:
K. BUXTON
ATCO CONTACT: 360.853.6418
kateryna.buxton@atcotelecom.com
SCALE:
1 50'
SHEET-
22
NO: 2OF5
LEGEND:
O
SIGNALIZED INTERSECTION
O
CONE (CANDLESTICK)
TYPE III BARRICADE
WORK TRUCK
WORK ZONE LIMITS
OWE
WARNING SIGN
(WHERE REQUIRED)
DIRECTION OF TRAFFIC
NOT PAVEMENT MARKINGS)
FLAGGER
(AS NEEDED)
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
�W20-4Z7A—
200'200'
0
1.
/-W20-1
78th Ave W
(25 MPH)
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH) 25 30
35
40
45
50
55
60
64
70
LENGTH (feet) 155 200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
77th Pl W
(25 MPH)
I
n O O
50' — 100'
—LANE, TWO WA
TRAFFIC TAPER
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
PHASE 2
WORK DETAILS:
0 PLACE NEW FIBER CABLE.
w SPOTTER NEEDED FOR PEDESTRIAN
TRAFFIC AND DRIVEWAY ACCESS,
200"J�200'�200"�
W20-7A W20-4 W20-11
G— 10 MIN. ==> � Y
XX�a� bl X O O
0 234th St SW
(25 MPH)
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER
TANGENT
50/70 40
80
35/45 30
60
25/30 20
40
MINIMUM LANE CLOSURE TAPER LENGTH = L (feet)
LANE
POSTED SPEED (MPH)
WIDTH
(feet)
25
1 30
35
40
45
50
1 55
60
1 65
70
10
105
150
205
270
450
500
550
600
650
700
11
115
165
225
295
495
550
605
660
715
770
12
125
180
245
320
540
600
660
720
780
840
N
(b
RECEIVEDATCO COMMUNICATIONS SERVICES, LLLC
www.atcotelecom.com
SEP 10 2021 360-563.9000
I 708 First Street
Snohomish, WA 98290
WSTCS# 012911
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT z ipy I f I b e r
Everett, WA 98206
SIGN LEGEND:
ROAD ONE LANE �
WORK ROAD
AHEAD AHEAD
W20-1 W20-4 W20-7A
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
M04
N
O
O
N
z 3
-o
~
L0
L0
�
<
Q
�
<
Q
D_
�
r
o
c
O
c
0
U
�
;_
W
I I
J M
O)
O N
0
0
=
M
`n
N
N
PO
C14
O
U
N
N
LL
M
G
z
-C
I; i
Q
O
W
W
Q
� Z
a
a
DATE:
09.08.2021
DESIGNED BY:
K. BUXTON
ATCO CONTACT:
360.853.6418
kateryna.buxton@atcotelecom.com
SCALE:
SHEET-
1 50'
03
NO: 3OF5
LEGEND:
0
SIGNALIZED INTERSECTION
O
CONE (CANDLESTICK)
TYPE III BARRICADE
WORK TRUCK
WORK ZONE LIMITS
OWE
WARNING SIGN
(WHERE REQUIRED)
DIRECTION OF TRAFFIC
NOT PAVEMENT MARKINGS)
FLAGGER
(AS NEEDED)
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
OAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
W20-7A
78th Ave W
(25 MPH)
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH) 25 30
35
40
45
50
55
60
64
70
LENGTH (feet) 155 200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
4
7A
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
77th Pl W
(25 MPH)
d
G�= 10' MIN. ==>
50' — 100'
E—LANE, TWO WA
TRAFFIC TAPER
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER
TANGENT
50/70 40
80
35/45 30
60
25/30 20
40
MINIMUM LANE CLOSURE TAPER LENGTH = L (feet)
LANE
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
1 65
70
10
105
150
205
270
450
500
550
600
650
700
11
115
165
225
295
495
550
605
660
715
770
12
125
180
245
320
540
600
660
720
780
840
PHASE 3
WORK DETAILS:
0 PLACE NEW FIBER CABLE.
N
RECEIVED
SEP 10 2021
CITY OF EDMONDS
,itO
ATCO COMMUNICATIONS SERVICES. LLC
www.atcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
WSTCS# 012911
DEVELOPMENT
SERVICES DEPARTMENT I I f i b e r
py
Everett, WA 98206
w SPOTTER NEEDED FOR PEDESTRIAN
TRAFFIC AND DRIVEWAY ACCESS,
234th St SW
(25 MPH)
SIGN LEGEND:
ROAD ONE LANE �
WORK ROAD
AHEAD AHEAD
W20-1 W20-4 W20-7A
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
M04
N
O
O
N
z 3
-o
~
L0
L0
�
<
Q
�
<
Q
D_
�
�
r
o
c
0
�
c
0
U
�
E
w
I
t7
O)
N
O 0
O
T
3
=
M
Lr)
ry �
N
N
PO
C14
O
U
N
N
LL_
M
G
LL
z
<
W
O
w
W
WQ
Q
� Z
a
a
DATE:
09.08.2021
DESIGNED BY:
K. BUXTON
ATCO CONTACT: 360.853.6418
kateryna.buxton@atcotelecom.com
SCALE:
1 50'
SHEET-
04
NO: 4OF5
LEGEND:
O
SIGNALIZED INTERSECTION
O
CONE (CANDLESTICK)
TYPE III BARRICADE
WORK TRUCK
WORK ZONE LIMITS
OWE
WARNING SIGN
(WHERE REQUIRED)
IRECTION OF TRAFFIC
NOT PAVEMENT MARKINGS)
FLAGGER
AS NEEDED)
w2o-1
0
N
WORK DETAILS:
(D PLACE NEW FIBER CABLE,
SPOTTER NEEDED FOR PEDESTRIAN
TRAFFIC AND DRIVEWAY ACCESS,
o\R
DEAD
END
233rd Pl SW
(25 MPH)
2pb,
SIGN LEGEND:
ROAD ONELANE
WORK ROAD
AHEAD AHEAD
W20-1 W20-4 W20-7A
�q
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH) 25 30
35
40
45
50
55
60
64
70
LENGTH (feet) 155 200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
f_'•�iC�Iif[' RIM--012
(25 MPH)
W20-1 I
0 I
0
N
tW20-741
0
0
N
rW20-71
0 I
0
N I
• O
CC 10' MIN.
77th Pl W
(25 MPH)
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER
TANGENT
50/70 40
80
35/45 30
60
25(30 20
40
MINIMUM LANE CLOSURE TAPER LENGTH = L (feet)
LANE
POSTED SPEED (MPH)
WIDTH
(feet)
25
1 30
35
40
45
50
1 55
60
1 65
70
10
105
150
205
270
450
500
550
600
650
700
11
115
165
225
295
495
550
605
660
715
770
12
125
180
245
320
540
600
660
720
780
840
PHASE
a
78th Ave W
0 (25 MPH)
0
�W20-1 N
� 12
4 "-0
ECEIVED
,EP 10 2021
A" O __N
ATCO COMMUNICATIONS SERVICES. LLC
www.atcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
WSTCS# 012911
ITV OF EDMONDS I I f i b e r
DEVELOPMENT p y
VICES DEPARTMENT
Everett, WA 98206
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
M04
N
O
O
N
z 3
-o
~
L0
L0
cy)
<
Q
-r-
<
_j Of
�
r
o
c
0
�
c
0
U
�
;_
w
I
_j r-
O)
N
0
O L0
O
T
3
=
M
Lr)
ry �
N
M
N
PO
C14
O
U
N
M
G
z
-C
I; i
o
Q
WW
Q
Z
a
a
DATE:
09.08.2021
DESIGNED BY:
K. BUXTON
ATCO CONTACT:
360.853.6418
kateryna.buxton@atcotelecom.com
SCALE:
SHEET-
1 50'
0b
NO: 5OF5