Loading...
Fld Rpts 1-2 FosterFIELD REPORT nELSOn GEOTECHnICAL ASSOCIATES, Inc 17311 1351h Ave. NE #A-500 Woodinville, WA 98072 (425)486-1669 FAX 481-2510 105 Palouse Street Wenatchee, WA 98801 (509)665-7696 Project: Owner: Location: Foster Deck CM Edmonds Chris Foster 16211— 70th Place West, Edmonds Weather: Sunny, 50s Purpose of Geotechnical Consultation and Visit: Construction Monitoring NGA File: 1151OB20 Date:3/23/2021 Report No: 1 Page 1 of 2 By: SLD We visited the site today on behalf of the owner, Chris Foster, to observe the installation of a helical piles at the deck addition project located at the above address. Upon arrival we met with the pile driving contractor to discuss the day's plans. Helical pile installation was started along the northern side of the house. The piles consisted of a 2+7/8-inch steel shaft with a single 10" helix, as specified in the plans. The anchor was driven with a truck mounted drive head. We observed the termination pressures with depth and embedment as they were driven. Each helical pile was driven to a minimum gauge pressure of approximately 900 psi, which corresponded to a torque of approximately 2,250 ft-lbs. Approximate embedment was as follows, measured below the base of the existing foundation: Pile # Embedment (ft) Pile # Embedment (ft) HP1 5.5 5.6 HP5 6.0 HP2 HP6 7.0 HP3 5.9 HP7 6.2 HP4 6.0 HP8 6.3 In our opinion, the helical piles completed today were installed correctly and according to project plans, and should support planned loads. We will continue to monitor the foundation repairs in the future when pin pile installation continues, and can return to the site upon request to continue observations and provide additional consultation. / C Attachment: Site Plan Signed: Distribution: Sarah L. Dunn, Staff Geologist Poster Deck construction Monitoring FROG 3/23121 y� Page 2.1 _ —K- .M H P I I I r ,rYy� A u l r HP2 I I I H PS HP H P4 I" H PS i Not to scullu All (trawings are approx, c_ N II son GEOTEMICAL ASSOCIATES, Inc 17311 135th Ave. NE #A-500 Woodinville, WA 98072 (425) 486-1669 FAX 481-2510 105 Palouse Street Wenatchee, WA 98801 (509)665-7696 FIELD REPORT Project: Foster Deck CM Edmonds Owner: Chris Foster Location: Weather 16211— 70th Place West, Edmonds Rainy, 500s Purpose of Geotechnical Consultation and Visit: Construction Monitoring NGA File:11510620 Date: 3/24/2021 Report No: 2 Page 1 of 2 By: SLD We visited the site today on behalf of the owners, Chris Foster, to observe the installation and testing of piles at the deck addition project located at the above address. Upon arrival we met with the pile contractor to discuss the day's plans. We performed a compressional load test on helical pile HP8 in accordance with the project plans. Approximate deflections and loads from testing are recorded in the table below. Plans indicated a 10kip design load from which the test was based. PSI Percent Load (10kips) Time Held Deflection (in) PSI Percent Load (10kips) Time Held Deflection (in) 500 25 1 min 0 2900 150 1 min 0.145 1000 50 1 min 0 2000 100 1 min 0.190 1500 75 1 min 0.09 1500 75 1 min 0.280 2000 100 1 min 0.155 1000 50 1 min 0.300 3000 150 1 min 0.140 500 25 1 min 0.270 4000 200 10 min 0.155 We then observed the installation of one of the planned helical piles as indicated on the attached site plan. The pile consisted of 2+3/8-inch diameter steel shaft with an initial length of 7.0 feet and a single 10-inch helix, this differs from the original plans which called for a 2+7/8-inch steel shaft. We understand after communications with the contractor that the %-inch reduction in shaft diameter will not affect the ability of the pile to support the planned loads. The pile was driven with a truck mounted drive head. We observed the termination pressure with depth and embedment as it was driven. The helical pile was driven to a minimum gauge pressure of approximately 900 psi, which correlates to a torque of approximately 2,250 ft-lbs. Approximate embedment was as follows, measured below the base of the existing foundation: Pile # Embedment (ft) HP9 6.6 Findings and conclusions are based on specific observations made while on site. In our opinion, the anchors tested today were installed correctly and according to project plans and should support planned loads. We will continue to monitor the foundation repairs in the future, when pin pile installation begins, and can return to the site upon request to continue observations and provide additional consultation. Signed: Attachment: Site Plan Distribution: Sarah I. Dunn, Staff Geologist A�. Foster Deck Construction monitor#mv FRO J24/ 1: Page 2 2 9M k Aw k4 kit Not to scale; All Drawings inns are approx. c N