APPROVED ENG PLN -BLD2021-0072+Site_Plan+1.19.2021_4.42.24_PM+19967974
_ �20 _ALLEY
r
00,00, �
r Ov'
� 1+r rT •� f
1 +i
• IS"f LNG
U)
- i
m
m
-4
n
m
DL T
/f0l f
O
O
O
O O
O
O O
0 O
O O
O
O O
O
d:: O
O
a� O
a.d '
a�
FILTERI SOCK WITH
OVER (FLOW HOLES
(TYP)
a
a d
FILTER SOCK WITH
OVER FLOW HOLES
(TYP)
M_1l�Al l�l�ill�
NOTES:
CATCH BASIN
1. CONTRACTOR/DEVELOPER SHALL MAINTAIN
THIS APPLICATION AT ALL TIMES DURING
CONSTRUCTION PERIOD.
2. ANY SEDIMENT IN CATCH BASIN INSERT
SHALL BE REMOVED WHEN INSERT IS
ONE—THIRD FULL.
3. CITY INSPECTION REQUIRED ON ALL
EROSION CONTROL METHODS BEFORE
OTHER WORK CAN BEGIN.
REVISION DATE
CITY OF EDMONDS TEMPORARY JANUARY 2018
SEDIMENT TRAP
PUBLIC WORKS FOR CATCH BASINS STANDARD
DEPARTMENT DETAIL
APPROVED BY: R. ENGLISH E R- 9 0 2