Loading...
BLD2021-1391_Manufacturer_Specifications_and_Installation_Instructions_10.8.2021_8.59.49_AM_2452015LE__7 D 0 ©2019 Lennox Industries Inc. Dallas, Texas, USA THIS MANUAL MUST BE LEFT WITH THE HOMEOWNER FOR FUTURE REFERENCE NOTICE! For more in-depth information, consult the Installa- tion and Service Procedures manual, available as Corp. 1502-1-7 on LennoxPros.com or through the Technical Support Department at 800-453-6669. FS—TEP 1 -- SETTING THE UNIT -- Clearances f See NOTE See NOTES See i OTES ,,..,.TROL See NOTES BOX / INSTALLATION INSTRUCTIONS Merit° Series ML14XC1 Units AIR CONDITIONERS 507524-01 02/2019 GENERAL This ML14XC1 outdoor air conditioner with all -aluminum coil is designed for use with HFC-410A refrigerant only. This unit must be installed with an approved indoor air handler or coil. See the Lennox ML14XC1 Product Specifications bulletin (EHB) for approved indoor component match ups. These instructions are intended as a general guide and do not supersede local codes in any way. Consult authorities having jurisdiction before installation. IMPORTANT: Special procedures are required for cleaning the aluminum coil in this unit. See page 15 in this instruction for information. NOTES - Service clearance of 30 in. (762 mm) must be maintained on one of the sides adjacent to the control box. Clearance to one of the other three sides must be 36 in. (914 mm). Clearance to one of the remaining two sides may be 12 in. (305 mm) and the final side may be 6 in. (152 mm). A clearance of 24 in. must be maintained between two units. 48 in. (1219 mm) clearance required on top of unit. NOTICE: Specific applications may require adjustment of the listed installation clearances to provide protection for the unit from physical damage or to avoid conditions which limit operating efficiency. (Example: Clearances may have to be increased to prevent snow or ice from falling on the top of the unit. Additional clearances may also be required to prevent air recirculation when the unit is installed under a deck or in another tight space.) FIGURE 1 rn Page 1 0 �* 507524-01 UNIT DIMENSIONS - INCHES (MM) �ALi I SIDE VIEW FIGURE 2 TABLE 1 UNIT DIMENSIONS Model Numbers A B ML14XC1-018-230A 24-1/4 (616) 29-1/4 (743) ML14XC1-024-230A 28-1/4 (724) 29-1/4 (743) ML14XC1-030-230A 28-1/4 (724) 37-1/4 (946) ML14XC1-036-230B 28-1/4 (724) 29-1/4 (743) ML14XC1-036-230C 28-1/4 (724) 33-1/4 (845) ML14XC1-041-230A 28-1/4 (724) 37-1/4 (946) ML14XC1-042-230A 28-1/4 (724) 37-1/4 (946) ML14XC1-047-230A 32-1/4 (819) 33-1/4 (845) ML14XC1-048-230A 28-1/4 (724) 37-1/4 (946) ML14XC1-059-230A 32-1/4 (819) 43-1/4 (1098) ML14XC1-060-230A 32-1/4 (819) 43-1/4 (1098) STEP 1 -- SETTING THE UNIT (CONTINUED) -- Unit Placement = M Before attempting to perform any service or maintenance, turn the electrical power to unit OFF at disconnect switch. A CAUTION NOTICE! Roof Damage! This system contains both refrigerantand oil. Some rubber roofing material mayabsorb oil, causing the rubberto degrade. Failuretofollowthis noticecould result in damage to roof surface. IMPORTANT 1 Exhaust vents from dryers, water heaters and fur- naces should be directed away from the outdoor unit. Prolonged exposure to exhaust gases and the chemi- cals contained within them may cause condensation to form on the steel cabinet and other metal compo- nents of the outdoor unit. This will diminish unit per- formance and longevity. FIGURE 3 SLAB MOUNTING Install unit level or, if on a slope, maintain slope tolerance of 2 degrees (or 2 inches per 5 feet [50 mm per 1.5 m]) away from building structure. BUILDING STRUCTURE DISCHARGE AIR l AI JI , MOUNTING SLAB GROUND LEVEL FIGURE 4 STEP 2 -- REFRIGERANT PIPING -- Flush- ing Existing Line Set and Indoor Coil Flush the existing line set per the following instructions. For more information, refer to the Installation and Service Procedures manual available on LennoxPros.com. CAUTION - DO NOT attempt to flush and re -use existing line sets or indoor coil when the system contains contaminants (i.e., compressor burn out). Page 2 ML14XC1 SERIES IMPORTANT! IMPORTANT! If this unit is being matched with an approved line set or indoor unit coil that was previously charged with mineral oil, or if it is being matched with a coil which was manufactured before January of 1999, the coil and line set must be flushed prior to installa- tion. Take care to empty all existing traps. Polyol es- ter (POE) oils are used in Lennox units charged with HFC-410A refrigerant. Residual mineral oil can act as an insulator, preventing proper heat transfer. It can also clog the expansion device and reduce sys- tem performance and capacity. Failure to properly flush the system per this instruc- tion and the detailed Installation and Service Proce- dures manual will void the warranty. AWARNING Some scroll compressors have an internal vacuum protector that will unload scrolls when suction pres- sure goes below 20 psig. A hissing sound will be heard when the compressor is running unloaded. The protector will reset when low pressure rises above 40 psig. DO NOT REPLACE COMPRESSOR. LIQUID LINE FILTER DRIER INSTALLATION The provided filter drier must be field installed in the liquid line between the outdoor unit's liquid line service valve and the indoor coil's metering device (fixed orifice or TXV) as illustrated in figure 5. This filter drier must be installed to ensure a clean, moisture -free system. Failure to install the filter drier will void the warranty. A replacement filter drier is available from Lennox. See Brazing Connections page 6 for special procedures on brazing filter drier connections to the liquid line. Typical Liquid Line Filter Drier Installation BRAZE CONNECTION POINTS FLOW LIQUID LINE LINE LIQUID SERVICE VALVE LINE OUTDOOR LIQUID LINE UNIT FILTER DRIER FIGURE 5 AWARNING NOTE - When installing refrigerant lines longer than 50 feet, refer to the Refrigerant Piping Design and Fabrication Guidelines manual available on LennoxPros.com (Corp. 9351-L9), or contact the Technical Support Department Product Application group for assistance. TABLE 2. REFRIGERANT LINE SET — INCHES (MM) Model Number Valve Size Connections Recommended Line Sets Liquid Line Suction Line L15 Line Set Model Line Set Length Catalog Number ML14XC1-018-230 ML14XC1-024-230 ML14XC1-030-230 3/8" (10 mm) 3/4" (19 mm) L15-41-20 20 feet (6.1 m) 89J56 L15-41-30 30 feet (9.1 m) 89J57 L15-41-40 40 feet (12.2 m) 89J58 L15-41-50 50 feet (15.2 m) 89J59 ML14XC1-036-230 M L14XC 1-041-230 ML14XC1-042-230 ML14XC1-047-230 ML14XC1-048-230 3/8" (10 mm) 7/8" (22 mm) L15-65-30 30 feet (9.1 m) 89J60 L15-65-40 40 feet (12.2 m) 89J61 L15-65-50 50 feet (15.2 m) 89J62 ML14XC1-0-230 ML74XC1-06060-230 3/8" (10 mm) 1-1/8" (29 mm) * Field -fabricated N/A N/A " Some applications may require a field -provided 1-1/8" to 7/8" adapter. Page 3 ML14XC1 SERIES LINE S r -0- T INSTALLATION Line Set Isolation - The following illustrations are examples of proper refrigerant line set isolation: REFRIGERANT LINE SET — TRANSITION FROM VERTICAL TO HORIZONTAL ANCHORED HEAVY NYLON WIRE TIE OR AUTOMOTIVE AUTOMOTIVE MUFFLER -TYPE HANGER MUFFLER -TYPE HANGER a v, WALL STUD v STRAP LIQUID LINE TO \ I SUCTION LINE NON -CORROSIVE METAL SLEEVE LIQUID LINE SUCTION LINE - WRAPPED N ARMAFLEX REFRIGERANT LINE SET — INSTALLING HORIZONTAL RUNS To hang line set from joist or rafter, use either metal strapping material or anchored heavy nylon wire ties. WIRE TIE (AROUND SUCTION LINE ONLY) 8 FEET (2.43 METERS) STRAPPING MATERIAL (AROUND SUCTION LINE FLOOR JOIST OR ONLY) \ ROOF RAFTER TAPE OR WIRE TIE 8I FEET (2.43 METERS) \NON -CORROSIVE METAL SLEEVE TAPE OR STRAP THE SUCTION LINE TO THE WIRE TIE JOIST OR RAFTER AT 8 FEET (2.43 METERS) INTERVALS THEN STRAP THE LIQUID LINE TO THE SUCTION LINE. FLOOR JOIST OR ROOF RAFTER — REFRIGERANT LINE SET — INSTALLING VERTICAL RUNS (NEW CONSTRUCTION SHOWN) NOTE - Insulate liquid line when it is routed through areas where the Isurrounding ambient temperature could become higher than the temperature of the liquid line or when pressure drop is equal to or greater than 20 psig. OUTSIDE WALL WOOD BLOCK BETWEEN STUDS SUCTION LINE LIQUID LINE WIRE TIE INSIDE WALL STRAP NON -CORROSIVE METAL SLEEVE WIRE TIE WOOD BLOCK WIRE TIE STRAP I SLEEVE SUCTION LINE WRAPPED\ WITH ARMAFLEX OUTSIDE WALL LIQUID / LINE PVC \ CAU7177 LK PIPE FIBERGLASS INSULATION i NOTE - Similar installation practices should be used if line set is to be installed on exterior of outside wall. FIGURE 6 Page 4 ML14XC1 SERIES STEP 2 -- REFRIGERANT PIPING -- Removing Existing Indoor Metering Device TYPICAL EXISTING FIXED ORIFICE TYPICAL EXISTING EXPANSION VALVE REMOVAL 1 A REMOVAL PROCEDURE OR PROCEDURE (UNCASED COIL SHOWN) (UNCASED COIL SHOWN) 1B DISTRIBUTOR TUBES LIQUID LINE ORIFICE HOUSING �TEFLONE'RING FIXED ORIFICE BRASS NUT DISTRIBUTOR ASSEMBLY REMOVE AND DISCARD WHITE TEFLON® SEAL (IF PRESENT) LIQUID LINE ASSEMBLY (INCLUDES STRAINER) STUB END TWO-PIECE PATCH PLATE LIQUID LINE (UNCASED COIL ONLY) ORIFICE EXPANSION DISTRIBUTOR HOUSING VALVE TUBES TEFLOP RING A - On fully cased coils, remove the coil access and plumbing panels. B - Remove any shipping clamps from the liquid line and distributor as- sembly. C - Using two wrenches, disconnect liquid line from liquid line orifice hous- ing. Take care not to twist or damage distributor tubes during this pro- cess. D - Remove and discard fixed orifice, valve stem assembly (if present) and Teflon® washer as illustrated above. E - Use a field -provided fitting to temporarily reconnect the liquid line to the indoor unit's liquid line orifice housing. 2 CONNECT GAUGES AND EQUIPMENT FOR FLUSHING PROCEDURE CYLINDER CONTAINING GAUGE CLEAN HCFC-22* TO BE MANIFOLD USED FOR FLUSHING A (Positioned to deliver liquid refrigerant) r� SUCTION SERVICE V / EXISTING B INDOOR / B UNIT LIQUID LINE SERVICE VALVE RECOVERY CYLINDER HIGH NEW o OUTDOOR UNIT rho l DISTRIBUTOR �I EQUALIZER ASSEMBLY LINE LIQUID LINE / ASSEMBLY WITH / BRASS NUT o I MALE EQUALIZER LINE FITTING SUCTION SENSING BULB LINE LIQUID LINE A - On fully cased coils, remove the coil access and plumbing panels. B - Remove any shipping clamps from the liquid line and distributor assembly. C - Disconnect the equalizer line from the check expansion valve equalizer line fitting on the suction line. D - Remove the suction line sensing bulb. E - Disconnect the liquid line from the check expansion valve at the liquid line assembly. F - Disconnect the check expansion valve from the liquid line orifice housing. Take care not to twist or damage distributor tubes during this process. G - Remove and discard check expansion valve and the two Teflon rings. H - Use a field -provided fitting to temporarily reconnect the liquid line to the indoor unit's liquid line orifice housing. vED CLOSED FLUSHING LINE SET The line set and indoor unit coil must be flushed with at least the same amount of clean refrigerant* that previously charged the system. Check the charge in the flushing cylinder before proceeding. A - Set the recovery machine for liquid recovery and start the recovery machine. Open the gauge set valves to allow the TANK recovery machine to pull a vacuum on the existing system line RETURN set and indoor unit coil. o c �' INLET B - Position the cylinder of clean HCFC-22* for delivery of liquid D c refrigerant and open its valve to allow liquid refrigerant to flow o z DISCHARGE into the system through the suction line valve. Allow the RECOVERY MACHINE refrigerant to pass from the cylinder and through the line set and the indoor unit coil before it enters the recovery machine. A - HCFC-22 cylinder with clean refrigerant* (positioned to deliver liquid C - After all of the liquid refrigerant has been recovered, switch the refrigerant) to the suction service valve. recovery machine to vapor recovery so that all of the HCFC-22 B - HCFC-22 gauge set (low side) to the liquid line valve. vapor is recovered. Allow the recovery machine to pull the C - HCFC-22 gauge set center port to inlet on the recovery machine with an system down to 0. empty recovery tank connected to the gauge set. D - Close the valve on the inverted HCFC-22 drum and the gauge D - Connect recovery tank to recovery machine per machine instructions. set valves. Pump the remaining refrigerant out of the recovery machine and turn the machine off. *IMPORTANT - Clean refrigerant is any refrigerant in a system that has not had compressor burn out. If the system has experienced burn out, it is recommended that the existing line set and indoor coil be replaced. FIGURE 7 Page 5 ML14XC1 SERIES STEP 2 -- REFRIGERANT PIPING -- Brazing Procedures 1 CUT AND DEBUR CAP AND CORE REMOVAL Cut ends of the refrigerant lines square (free from nicks or dents) 2 Remove service cap and core from and debur the ends. The pipe must remain round. Do not crimp end both the suction and liquid line service of the line. ports. CUT AND DEBUR �i LINE SET SIZE MATCHES SERVICE VALVE CONNECTION SERVICE VALVE CONNECTION COPPERTUBE -� STUB \ REDUCER O O O LINE SET SIZE IS THAN CONNE REFRIGERANT LINE 0C-NA SERVICE PORT CAP ci -�r SERVICE PORT CORE ANGLE -TYPE SERVICE VALVE DO NOT CRIMP SERVICE VALVE CONNECTOR WHEN PIPE IS SMALLER THAN CONNECTION BALL -TYPE SERVICE VALVE 3 ATTACH THE MANIFOLD GAUGE SET FOR BRAZING LIQUID AND SUCTION LINE SERVICE VALVES Flow regulated nitrogen (at 1 to 2 psig) through the low -side refrigeration gauge set into the liquid line service port valve, and out of the suction line service port valve. A - Connect gauge set low pressure side to liquid line service valve (service port). B - Connect gauge set center port to bottle of LOW nitrogen with regulator. C - Remove core from valve in suction line service port to allow nitrogen to escape. ATTACH GAUGES SUCTION SERVICE PORT MUST BE OPEN TO ALLOW EXIT POINT FOR NITROGEN C SUCTION LINE SERVICE VALVE SUCTION LINE �� INDOOR UNIT = N HIGH OUTDOOR UNIT USE REGULATOR TO FLOW NITROGEN AT 1 TO 2 PSIG. \ I I NITROGEN LIQUID LINE LIQUID LINE SERVICE O WHEN BRAZING LINE SET TO VALVE SERVICE VALVES, POINT FLAME AWAY FROM SERVICE VALVE. FIGURE 8 AWARNING Brazing alloys and flux contain materials which are hazardous to your health. Avoid breathing vapors or fumes from brazing operations. Perform operations only in well -ventilated areas. y Wear gloves and protective goggles or face shield to protect against burns. Wash hands with soap and water after handling brazing alloys and flux. Page 6 ML14XC1 SERIES 4 WRAP SERVICE VALVES To help protect service valve seals during brazing, wrap water -saturated cloths around service valve bodies and copper tube stubs. Use additional water -saturated cloths underneath the valve body to protect the base paint. 5 FLOW NITROGEN Flow regulated nitrogen (at 1 to 2 psig) through the refrigeration gauge set into the valve stem port connection on the liquid service valve and out of the suction valve stem port. See steps 3A, 36 and 3C on manifold gauge set connections. 6 BRAZE LINE SET Wrap both service valves with water -saturated cloths as illustrated here and as mentioned in step 4, before brazing to line set. Cloths must remain water -saturated throughout the brazing and cool -down process. M LIQUID LINE SERVICE VALVE WHEN BRAZING LINE SET TO SERVICE VALVES, POINT FLAME AWAY FROM SERVICE VALVE. IMPORTANT -Allow braze joint to cool. Apply additional water -saturated cloths to help cool brazed joint. Do not remove water -saturated cloths until piping has cooled. Temperatures above 250°F will damage valve seals. WATER -SATURATED CLOTH LIQUID LINE SUCTION LINE SERVICE VALVE complete, must be quenched with water to absorb any �1 residual heat. Do not open service valves until refrigerant lines and I • indoor coil have been leak -tested and evacuated. Refer .� 'RVICE VALVES, POINT FLAME to Installation and Service Procedures manual found on 'FROM SERVICE VALVE. LennoxPros.com. (__V SUCTION LINE 7 PREPARATION FOR NEXT STEP WATER -SATURATED CLOTH After all connections have been brazed, disconnect manifold gauge set from service ports. Apply additional water -saturated cloths to both services valves to cool piping. Once piping is cool, remove all water -saturated cloths. FIGURE 8 (CONTINUED) Page 7 ML14XC1 SERIES STEP 2 -- REFRIGERANT PIPING -- Installing Indoor Expansion Valve This outdoor unit is designed for use in systems that use either an fixed orifice (RFC) (included with outdoor unit), or expansion valve metering device (purchased separately) at the indoor coil. See the ML14XC1 Product Specifications bulletin (EHB) for approved expansion valve kit match ups. The expansion valve unit can be installed internal or external to the indoor coil. In applications where an uncased coil is being installed in a field -provided plenum, install the expansion valve in a manner that will provide access for field servicing of the expansion valve. Refer to below illustration for reference during installation of expansion valve unit. After installation of the indoor coil metering device, proceed to Step 5. C - Install one of the provided Teflon® rings around the INDOOR EXPANSION VALVE INSTALLATION stubbed end of the check/expansion valve and use re- frigerant oil to lightly lubricate the connector threads TWO-PIECE and exposed surface of the Teflon® ring. PATCH PLATE (Uncased Coil Shown) D - Attach the stubbed end of the check/expansion valve 1/2 Turn STUB (UNCASED to the liquid line orifice housing. Finger tighten, then use COIL ONLY) LIQUID LINE END CHECK/ an appropriately sized wrench to turn an additional 1/2 ORIFICE HOUSING EXPANSION turn clockwise as illustrated in the figure to the right, or 11 DISTRIBUTOR VALVE tighten to 20 ft-lb. 10 TUBES. TEFLON® E - Place the remaining Teflon® washer around the other g 4 0 I� RING end of the check expansion valve. Lightly lubricate 8 7 0 connector threads and expose surface of the Teflon® 0 4 D ring with refrigerant oil. TEFLON®, �\ F - Attach the liquid line assembly to the check expansion ® RING SENSING valve. Finger tighten, then use an appropriately sized \ LINE wrench to turn an additional 1/2 turn clockwise as illus- trated in the figure above or tighten to 20 ft-lb. DISTRIBUTOR EQUALIZER ASSEMBLYLINE LIQUID LINE / ASSEMBLY WITH a BRASS NUT SENSING BULB INSTALLATION 0 0 A - Attach the suction line sensing bulb in the proper orien- tation as illustrated below using the clamp and screws MALE EQUALIZER LINE SUCTION provided. FITTING (SEE LINE B - NOTE - Though it is preferred to have the sensing bulb EQUALIZER LINE installed on a horizontal run of the suction line, installa- INSTALLATION FOR tion on a vertical run of piping is acceptable if necessary. DETAILS) NOTE - Confirm proper thermal contact between the suction 1/8 Turn Sensing bulb insulation is required if line and check/expansion bulb before insulating the sensing check/expansion valve is installed external LIQUID LINE bulb. 11 12� to the coil casing. See sensing bulb C - Connect the equalizer line from the check/expansion 10 installation for bulb positioning. valve to the equalizer port on the suction line. Finger g tighten the flare nut, then tighten an additional 1/8 turn (7 8 4 ft-lbs) as illustrated to the right. 7 5 6 EQUALIZER LINE INSTALLATION A - Remove and discard either the flare seal cap or flare nut with copper flare seal bonnet from the equalizer line port on the suc- tion line as illustrated in the figure below. B - Remove the field -provided fitting that temporarily reconnected the liquid line to the indoor unit's distributor assembly. FLARE SEAL CAP I I FLARE NUT COPPER FLARE ORX_ SEAL BONNET MALE BRASS EQUALIZER LINE FITTING SUCTION LINE ON LINES SMALLER THAN SUCTION LINE \ 7/8", MOUNT SENSING BULB AT EITHER THE 3 OR \ 9 O'CLOCK POSITION. 4171 (BULB BULB SUCTION LINE \ BULB BULB FIGURE 9 ON 7/8" AND LARGER LINES, MOUNT SENSING BULB AT EITHER THE 4 OR 8 O'CLOCK POSITION. NEVER MOUNT THE SENSING BULB ON BOTTOM OF LINE. NOTE— NEVER MOUNT SENSING BULB ON BOTTOM OF LINE. Page 8 ML14XCl SERIES STEP 3 -- LEAK TEST AND EVACUATION LEAK TEST LOW 0 HIGH MANIFOLD GAUGE SET O �a JB A 1 l TO SUCTION SERVICE VALVE (ANGLE OR BALL TYPE) O NITROGEN OUTDOOR UNIT 1 HFC-410A CONNECT GAUGE SET A - Connect the high pressure hose of an HFC-410A manifold gauge set to the suction valve service port. NOTE - Normally, the high pressure hose is connected to the liquid line port. However, connecting it to the suction port better protects the manifold gauge set from high pressure damage. B - With both manifold valves closed, connect the cylinder of HFC-410A refrigerant to the center port of the manifold gauge set. NOTE - Later in the procedure, the HFC-410A container will be replaced by the nitrogen container. After the line set has been connected to the indoor and outdoor units, check the line set connections and indoor unit for leaks. Use the following procedure to test for leaks: 2 TEST FOR LEAKS A - With both manifold valves closed, connect the cylinder of HFC-410A refrigerant to the center port of the manifold gauge set. Open the valve on the HFC-410A cylinder (vapor only). B - Open the high pressure side of the manifold to allow HFC-410A into the line set and indoor unit. Weigh in a trace amount of HFC-410A. (A trace amount is a maximum of two ounces (57 g) refrigerant or three pounds (31 kPa) pressure.] Close the valve on the HFC-410A cylinder and the valve on the high pressure side of the manifold gauge set. Disconnect the HFC-410A cylinder. C - Connect a cylinder of nitrogen with a pressure regulating valve to the center port of the manifold gauge set. D - Adjust nitrogen pressure to 150 psig (1034 kPa). Open the valve on the high side of the manifold gauge set in order to pressurize the line set and the indoor unit. E - After a few minutes, open one of the service valve ports and verify that the refrigerant added to the system earlier is measurable with a leak detector. F - After leak testing, disconnect gauges from service ports. FIGURE 10 Page 9 ML14XC1 SERIES STEP 3 -- LEAK TEST AND EVACUATION (CONTINUED) EVACUATION 3NOTE CONNECT GAUGE SET LOW HIGH - Remove cores from service valves (if not already done). d A - Connect low side of manifold gauge set with / 1/4 SAE in -line tee to suction line service O valve B - Connect high side of manifold gauge set to 1/4 SAE TEE WITH SWIVEL MANIFOLD liquid line service valve COUPLER GAUGE SET C - Connect available micron gauge connector A on the 1/4 SAE in -line tee. Ooo 500 D - Connect the vacuum pump (with vacuum t gauge) to the center port of the manifold MICRON TO SUCTION gauge set. The center port line will be used C "� z� GAUGE SERVICE VALVE later for both the HFC-410A and nitrogen ®W" containers. t OUTDOOR NITROGEN UNIT HFC-410A TO LIQUID LINE VACUUM PUMP LB SERVICE VALVE E I i RECOMMEND MINIMUM 3/8" HOSE D 1 EVACUATE THE SYSTEM A- Open both manifold valves and start the vacuum pump. B - Evacuate the line set and indoor unit to an absolute pressure of 23,000 microns (29.01 inches of mercury). NOTE - During the early stages of evacuation, it is desirable to close the manifold gauge valve at least once. A rapid rise in pressure indicates a relatively large leak. If this occurs, repeat the leak testing procedure. NOTE - The term absolute pressure means the total actual pressure above absolute zero within a given volume or system. Absolute pressure in a vacuum is equal to atmospheric pressure minus vacuum pressure. C- When the absolute pressure reaches 23,000 microns (29.01 inches of mercury), perform the following: • Close manifold gauge valves. WARNING! • Close valve on vacuum pump. • Turn off vacuum pump. Possible damage. • Disconnect manifold gauge center port hose from vacuum pump. Avoid deepvacuumoperation. ' not • Attach manifold center port hose to a nitrogen cylinder with pressure compressors to evacuate a syst;. regulator set to 150 psig (1034 kPa) and purge the hose. Extremelylow vacuum can cause inter • Open manifold gauge valves to break the vacuum in the line set and arcing and compressor failure. Dami indoor unit. caused by deepvacuumoperation • Close manifold gauge valves. void D - Shut off the nitrogen cylinder and remove the manifold gauge hose from the cylinder. Open the manifold gauge valves to release the nitrogen from the line set and indoor unit. E - Reconnect the manifold gauge to the vacuum pump, turn the pump on, and continue to evacuate the line set and indoor unit until the absolute pressure does not rise above 500 microns (29.9 inches of mercury) within a 20-minute period after shutting off the vacuum pump and closing the manifold gauge valves. F - When the absolute pressure requirement above has been met, disconnect the manifold hose from the vacuum pump and connect it to a cylinder of HFC-410A positioned to deliver liquid refrigerant. Open the manifold gauge valve 1 to 2 psig in order to release the vacuum in the line set and indoor unit. G - Perform the following: 1/6 TURN • Close manifold gauge valves. I • Shut off HFC-410A cylinder. • Reinstall service valve cores by removing manifold hose from service valve. Quickly install cores with core tool while maintaining a positive system pressure. • Replace stem caps and finger tighten them, then tighten an additional one -sixth (1/6) of a turn as illustrated. 60 FIGURE 11 Page 10 ML14XC1 SERIES STEP 4 -- ELECTRICAL -- Circuit Sizing and Wire Routing In the U.S.A., wiring must conform with current local codes and the current National Electric Code (NEC). In Canada, wiring must conform with current local codes and the current Canadian Electrical Code (CEC). Refer to the furnace or air handler installation instructions for additional wiring application diagrams and refer to unit nameplate for minimum circuit ampacity and maximum overcurrent protection size. 24VAC TRANSFORMER Use the transformer provided with the furnace or air handler for low -voltage control power (24VAC - 40 VA minimum) AWARNING IMPORTANT! If unit is equipped with a crankcase heater, it should be energized 24 hours before unit start-up to prevent compressor damage as a result of slugging. SIZE CIRCUIT AND INSTALL SERVICE DISCONNECT SWITCH Refer to the unit nameplate for minimum circuit ampacity, and maximum fuse or circuit breaker (HACR per NEC). Install power wiring and properly sized disconnect switch. MAIN FUSE BOX/ BREAKER PANEL SERVICE DISCONNECT SWITCH NOTE - Units are approved for use only with copper conductors. Ground unit at disconnect switch or connect to an earth ground. Fire Hazard. Use of aluminum wire with this product may result in a fire, causing property damage, severe injury or death. Use copper wire only with this product. INSTALL THERMOSTAT Install room thermostat (ordered separately) on an inside wall approximately in the center of the conditioned area and 5 feet (1.5m) from the floor. It should not be installed on an outside wall or where it can be affected by sunlight or drafts. THERM NOTE - 24VAC, Class 11 circuit connections are made in the control panel. FIGURE 12 Page 11 ML14XC1 SERIES STEP 4 -- ELECTRICAL (CONTINUED) -- High Voltage and Field Control Wiring The following illustration provide an example of control wiring connections when using standard thermostat. ROUTING HIGH VOLTAGE, GROUND AND CONTROL WIRING HIGH VOLTAGE / GROUND WIRES Any excess high voltage field wiring should be trimmed and secured away from any low voltage field wiring. To facilitate a conduit, a cutout is located in the bottom of the control panel. Connect conduit to the control panel using a proper conduit fitting. NOTE - Wire tie provides low voltage control wire strain relief and maintains separation of field -installed low and high voltage circuits. NOTE -For proper voltages, select thermostat wire (control wires) gauge per table above. NOTE - Do not bundle any excess 24VAC control wires inside control panel. Install low voltage wiring from outdoor to indoor unit and from thermostat to indoor unit as illustrated. A - Run 24VAC control wires through hole with grommet and secure with provided wire tie. B - Make 24VAC thermostat wire connections. Locate the two wires from the contactor and make connection using field -provided wire nuts: • Yellow to Y1 • Black to C (common) FIELD CONTROL WIRING THERMOSTAT INDOOR UNIT OUTDOOR UNIT WIRE RUN LENGTH AWG# INSULATION TYPE LESS THAN 100' (30 METERS) 18 TEMPERATURE RATING MORE THAN 100' (30 METERS) 16 35°C MINIMUM. FIGURE 13 24VAC Control Wiring Diagrams (Field Installed) ML180 COMFORTSENSE FURNACE 5500 STAT 14ACX w -- IEU" BLACK — — C — — C SLP98, SL28UH, SL28ODF COMFORTSENSE FURNACE 7500 STAT R --- R ❑H 0 14ACX Q YELLOV — — EaY2 © D.D. G — — — G SENSOR OPTIONAL XX226558 DH Q (p pI BLACK CUT W914 R TO DS T _J JUMPER WHEN STAT T DEHUMID. IS USED. CBX40UHV COMFORTSENSE CBX25 CBX27 BLOWER COIL 7500 STAT BLOWER CBX32M BLOWER COMFORTSENSE R — — — R COIL COMFORTSENSE BLOWER COMFORTSENSE COIL �— — — 5500 STAT COIL 5500 STAT 5500 STAT I Q 0 14AC Q GREEN-0 — G G — G 0 — — — VH➢E-Vl RED W 1 W R--- W 0 Q O❑ OO 14ACX BLACK-V 14ACX 14ACX Wl — W BRO — — — --- L a vELLov ➢❑ V YELLOV V1 YELLOV eL➢ — — V2 — — SENSOR 2 G — — G OPTIONAL G — — G ➢s — — D X2658 BLUE -IC ➢S O BLACK C BLACK C C BLACK C — — C L J EL280. EL295, EL296 COMFORTSENSE FURNACE 7500 STAT 0 0 2 Wl 1 14ACX °❑ O YELLOV Vl 1 v2 © OPTIONAL G G OUTDOOR SENSOR BIl O X26\58 ^� Y— BLACK ��44�----IIY Y) CUT W914 R TO DS LR— _J JUMPER WHEN STAT J DEHUMID. IS USED. NOTE - Refer to furnace, blower coil and accessory instructions for additional wiring configurations with other optional controls. T 2LAir handler shipped with jumpers installed between W1 and W2 T — J and W2 and W3. QR connection required for air conditioner with LSOM. Resistor kit (CAT #47W97) required when connecting ComfortSense 7500 with LSOM 2. AL connection wired on units with LSOM. FIGURE 14 Page 12 ML14XC1 SERIES STEP 5 -- UNIT START-UP A IMPORTANT If unit is equipped with a crankcase heater, it should be energized 24 hours before unit start-up to prevent compressor damage as a result of slugging. 1 - Rotate fan to check for binding. 2 - Inspect all factory- and field -installed wiring for loose connections. 3- After evacuation is complete, open the liquid line and suction line service valve stems to release the refrigerant charge (contained in outdoor unit) into the system. 4 - Replace the stem caps and tighten to the value listed in table 3. 5 - Check voltage supply at the disconnect switch. The voltage must be within the range listed on the unit's nameplate. If not, do not start the equipment until you have consulted with the power company and the voltage condition has been corrected. 6 - Connect manifold gauge set for testing and charging using figure 10 as a guideline. 7 - Set the thermostat for a cooling demand. Turn on power to the indoor indoor unit and close the outdoor unit disconnect switch to start the unit. 8 - Recheck voltage while the unit is running. Power must be within range shown on the unit nameplate. 9 - Check system for sufficient refrigerate using the procedures outlined in under System Refrigerant. OPERATING MANIFOLD GAUGE SET AND SERVICE VALVES The liquid and suction line service valves are used for removing refrigerant, flushing, leak testing, evacuating, checking charge and charging. Each valve is equipped with a service port which has a factory -installed valve stem. Figures 15 and 16 provide information on how to access and operate both angle- and ball -type service valves. Torque Requirements When servicing or repairing heating, ventilating, and air conditioning components, ensure the fasteners are appropriately tightened. Table 3 lists torque values for fasteners. TABLE 3 TORQUE REQUIREMENTS Parts Recommended Torque Service valve cap 8 ft.- lb. 11 NM Sheet metal screws 16 in.- lb. 2 NM Machine screws #10 28 in.- lb. 3 NM Compressor bolts 90 in.- lb. 10 NM Gauge port seal cap 8 ft.- lb. 11 NM A IMPORTANT To prevent stripping of the various caps used, the appropriately sized wrench should be used and fitted snugly over the cap befor- tightening. Using Manifold Gauge Set When checking the system charge, only use a manifold gauge set that features low loss anti -blow back fittings. Manifold gauge set used with HFC-410A refrigerant systems must be capable of handling the higher system operating pressures. The gauges should be rated for use with pressures of 0 - 800 psig on the high side and a low side of 30" vacuum to 250 psig with dampened speed to 500 psi. Gauge hoses must be rated for use at up to 800 psig of pressure with a 4000 psig burst rating. OPERATING BALL -TYPE SERVICE VALVE: 1 - Remove stem cap with an appropriately sized wrench. 2 - Use an appropriately sized wrenched to open. To open valve, rotate stem counterclockwise 90°. To close rotate stem clockwise 90°. O TO OPEN ROTATE STEM COUNTERCLOCKWISE 90°. o BALL (SHOWN CLOSED) TO CLOSE ROTATE STEM VALVE CLOCKWISE 90°. STEM SERVICE PORT SERVICE PORT CORE SERVICE PORT CAP FIGURE 15 STEM CAP Page 13 ML14XC1 SERIES OPERATING ANGLE -TYPE SERVICE VALVE: 1 - Remove stem cap with an appropriately sized wrench. 2 - Use a service wrench with a hex -head extension (3/16" for liquid line valve sizes and 5/16" for suction line valve sizes) to back the stem out counterclockwise as far as it will go. / SERVICE PORT CAP SERVICE PORT CORE (VALVE STEM SHOWN OPEN) f::�k_ INSERT HEX WRENCH HERE STEM CAP ANGLE -TYPE SERVICE VALVE (BACK -SEATED OPENED) When service valve is OPEN, the service port is open to line set, indoor and outdoor unit. ✓ALVE STEM SHOWN CLOSED) JSERT HEX WRENCH HERE ANGLE -TYPE SERVICE VALVE (FRONT -SEATED CLOSED) When service valve is CLOSED, the service port is open to the line set and indoor unit. NOTE - A label with specific torque requirements may be affixed to the stem cap. If the label is present, use the specified torque. FIGURE 16 TO ACCESS SERVICE PORT: A service port cap protects the service port core from contamination and serves as the primary leak seal. 1 - Remove service port cap with an appropriately sized wrench. 2 - Connect gauge set to service port. 3 - When testing is completed, replace service port cap and tighten as follows: • With torque wrench: Finger tighten and 1/6 TU torque cap per table 3. • Without torque wrench: Finger tighten and(1011 1�use an appropriately sized wrench to turn QI'' 2an additional 1/6 turn clockwise. Reinstall Stem Cap: Stem cap protects the valve stem from damage and serves as the primary seal. Replace the stem cap and tighten as follows: 1/12 TURN • With Torque Wrench: Finger tighten and then torque cap per table 3. I �/ • Without Torque Wrench: Finger 11 12 1 tighten and use an appropriately 10 2 sized wrench to turn an addition- 9 3 al 1/12 turn clockwise. 8 4 7 6 5 FIGURE 17 Checking and Adding System Charge The ML14XCl unit is factory -charged with enough HFC-410A refrigerant to accommodate a 15-foot length of refrigerant piping. Charge should be checked and adjusted using the tables provided on the charging procedure sticker located on the unit access panel. Detailed information is provided in the ML14XCl Installation and Service Procedures manual (Corp1502-1-7), which is available on LennoxPros.com. Homeowner Information ACAUTION Before• • to perform any service or power to unit OFF at dis- connect In order to ensure peak performance, your system must be properly maintained. Clogged filters and blocked airflow prevent your unit from operating at its most efficient level. The system should be inspected and serviced before each cooling season by a licensed professional HVAC service technician (or equivalent). Homeowner Maintenance The following maintenance may be performed by the homeowner. • Contact a licensed professional HVAC technician to schedule a yearly inspection and maintenance appointment for your equipment. • Check the indoor unit filter each month and replace the filter, if necessary. Have your Lennox dealer show you where your indoor unit filter is located. It will be either at the indoor unit (installed internal or external to the cabinet) or behind a return air grille in the wall or ceiling. Check the filter monthly and clean or replace it as needed. Disposable filters should be replaced with a filter of the same type and size. • Check the indoor unit drain line for obstructions monthly during the cooling season. The indoor evaporator coil is equipped with a drain pan to collect condensate formed as your system removes humidity from the inside air. Have your dealer show you the location of the drain line and how to check for obstructions. (This would also apply to an auxiliary drain, if installed.) • Check the area around the outdoor unit monthly and remove any obstructions that may restrict airflow to the outdoor unit. This would include grass clippings, leaves, or papers that may have settled around the unit. • Trim shrubbery away from the unit and periodically check for debris which collects around the unit. • During the winter months, keep the snow level below the louvered panels. NOTE - The filter and all access panels must be in place any time the unit is in operation. If you are unsure about the filter required for your system, call your Lennox dealer for assistance. Page 14 ML14XCl SERIES IMPORTANT! Sprinklers and soaker hoses should not be installed where they could cause prolonged exposure to the outdoor unit by treated water. Prolonged exposure of the unit to treated water (i.e., sprinkler systems, soakers, waste water, etc.) will corrode the surface of steel and aluminum parts, diminish performance and affect longevity of the unit. Thermostat Operation See the thermostat owner's manual for instructions on how to operate your thermostat. Pre -Service Check If your system fails to operate, check the following before calling for service: • Verify room thermostat settings are correct. • Verify that all electrical disconnect switches are ON. Check for any blown fuses or tripped circuit breakers. Verify unit access panels are in place. Verify air filter is clean. If service is needed, locate and write down the unit model number and have it handy before calling. Professional Maintenance Your heating and air conditioning system should be inspected and maintained yearly (before the start of the cooling and heating seasons) by a licensed professional HVAC technician. You can expect the technician to check the following items. These checks may only be conducted by a licensed professional HVAC technician. Outdoor Unit 1 - Inspect component wiring for loose, worn or damaged connections. Also check for any rubbing or pinching of wires. Confirm proper voltage plus amperage outdoor unit. 2 - Check the cleanliness of outdoor fan and blade assemblies. Check condition of fan blades (cracks). Clean or replace them, if necessary. 3 - Inspect base pan drains for debris and clean as necessary. 4 - Inspect the condition of refrigerant piping and confirm that pipes are not rubbing copper -to -copper. Also, check the condition of the insulation on the refrigerant lines. Repair, correct, or replace as necessary. 5 - Test capacitor. Replace as necessary. 6 - Inspect contactor contacts for pitting or burn marks Replace as necessary. 7 - Check outdoor fan motor for worn bearings/bushings. Replace as necessary. 8 - Inspect and clean outdoor coils, if necessary and note any damage to coils or signs of leakage. NOTICE! Failure to follow instructions will cause damage to the unit. This unit is equipped with an aluminum coil. Alu- minum coils may be damaged by exposure to solu- tions with a pH below 5 or above 9. The aluminum coil should be cleaned using potable water at a mod- erate pressure (less than 50psi). If the coil cannot be cleaned using water alone, Lennox recommends use of a coil cleaner with a pH in the range of 5 to 9. The coil must be rinsed thoroughly after cleaning. In coastal areas, the coil should be cleaned with potable water several times per year to avoid corro- sive buildup (salt). Indoor Unit (Air Handler or Furnace) 1 - Inspect component wiring for loose, worn or damaged connections. Confirm proper voltage plus amperage indoor unit. 2 - Inspect and clean or replace air filters in indoor unit. 3 - Check the cleanliness of indoor blower and clean blower, if necessary. 4 - Inspect the evaporator coil (Indoor) drain pans and condensate drains for rust, debris, obstructions, leaks or cracks. Pour water in pans to confirm proper drainage from the pan through to the outlet of the pipe. Clean or replace as necessary. 5 - Inspect and clean evaporator (indoor) coil, if necessary. 6 - Inspect the condition of the refrigerant lines and confirm that pipes are not rubbing copper -to -copper. Also, ensure that refrigerant pipes are not being affected by indoor air contamination. Check condition of insulation on the refrigerant lines. Repair, correct, or replace as necessary. 7 - Inspect the duct system for leaks or other problems. Repair or replace as necessary. 8 - Check for bearing/bushing wear on indoor blower motor. Replace as necessary. 9 - Indoor unit inspections of gas- or oil -fired furnaces will also include inspection and cleaning of the burners, and a full inspection of the gas valve, heat exchanger and flue (exhaust) system. Page 15 ML14XC1 SERIES General System Test with System Operating 1 - Your technician should perform a general system test. He will turn on the air conditioner to check operating functions such as the start-up and shut-off operation. He will also check for unusual noises or odors, and measure indoor/outdoor temperatures and system pressures as needed. He will check the refrigerant charge per the charging sticker information on the outdoor unit. 2 - Verify that system total static pressure and airflow settings are within specific operating parameters. 3 - Verify correct temperature drop across indoor coil. ML14XC1 Start -Up and Performance Checklist Customer Address Indoor Unit Model Serial Outdoor Unit Model Serial Notes: START UP CHECKS Refrigerant Type: Rated Load Amps: Actual Amps Rated Volts Actual Volts Condenser Fan Full Load Amps Actual Amps:_ COOLING MODE Suction Pressure: Liquid Pressure: Supply Air Temperature: Ambient Temperature:_ Return Air: Temperature: System Refrigerant Charge (Refer to manufacturer's information on unit or installation instructions for required subcooling and approach temperatures.) Subcooling: A — B = SUBCOOLING Saturated Condensing Temperature (A) minus Liquid Line Temperature (B) Approach: A — B = APPROACH Liquid Line Temperature (A) minus Outdoor Air Temperature (B) Indoor Coil Temperature Drop (18 to 22°F) A — B = COIL TEMP DROP Return Air Temperature (A) minus Supply Air Temperature (B) Page 16 ML14XC1 SERIES