Loading...
Building Permit 2021Type: PLUMBING Subtype: COMMERCIAL PLUMBING I Status: ISSUED Parcel No: 00700200230300 Site Address: 8414 240TH ST SW B303 EDMONDS,WA 98026- 9144 Subdivision: 007002, 004633, 011468, LLA PLN20140040 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $0.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: PLUMBING -WATER HEATER -ELECTRIC Applied: 10/12/2021 Issued:10/13/2021 Final: Expiration Date: 4/11/2022 Issued by: NED WA State Contractor L & I #: FASTWWH948BC City of Edmonds Business License #: 602454996-001-0001 1 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT KATY KEHLE 11715 NORTH CREEK PARKWAY (425)636-7054 KKEHLE@FASTWATERHEATER.COM SOUTH, BOTHELL WA 98011 FAST WATER HEATER 11715 NORTH CREEK PARKWAY CONTACT (425)636-7054 kkehle@FASTWATERHEATER.COM COMPANY SOUTH, BOTHELL WA 98011 CONTRACTOR FAST WATER HEATER 11715 NORTH CREEK PARKWAY (425)636-7054 kkehle@FASTWATERHEATER.COM COMPANY SOUTH, BOTHELL WA 98011 8414 240TH ST SW B303, OWNER NOLA TOPOLINSKI EDMONDS WA 98026-9144 FEE •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 10/13/21 R15300 PERMITS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 10/13/21 R15300 PER PERMIT WATER HEATER - INCLUDING 001.000.322.10.000.00 $15.00 $15.00 10/13/21 R15300 EXPANSION TANK TOTALS: $105.00 $105.00 • CONDITION TYPE STATUS ?!!!!!!!JjW NOTES Printed: Wednesday, October 13, 2021 10:35:25 AM 1 of 2 PLUMBING Permit - City of • • • 980220 1 1 www.edmondswa.gov • • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION Installation, use and maintenance of equipment and components shall be per EQUIPMENT USAGE FOR manufacturer's specifications, installation instructions, and applicable state codes. INFORMATION provide manufacture's installation instructions on site for Building Inspector. FOR In addition to the required pressure relief valve an approved listed expansion tank shall EXPANSION TANK INFORMATION be installed on all hot water tanks per UPC 608. INSPECTIONS-. •https://Inspection.MvBuildingPermit.com COMPLETED SEQID INSPECTION TYPE INSPECTOR DATE X-0 PLUMBING FINAL" B-3 PLUMB ROUGH IN Printed: Wednesday, October 13, 2021 10:35:25 AM 2 of 2