Building Permit 2021Type: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED
Parcel No: 00536000000600
Subdivision: 005360, 006168
Fire Sprinklers:
Valuation: $22,560.00
Code Edition: 0
Site Address: 540 FIR PL EDMONDS,WA 98020-4647
Lot: 0
Lot Area: 6098 Zoning: RS-6
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: BUI- INTERIOR REMODEL, P&M INCL
Applied: 4/12/2021
Issued:10/14/2021
Final:
Expiration Date: 10/9/2022
Issued by: NED
WA State Contractor L & I #: JCKILCK812LE City of Edmonds Business License #: 602454996-001-0001 1
III
CONTACTS
j
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
ETHAN PERRIGOUE
17191 BOTHELL WAY NE, LAKE
(206)432-1111
ETHAN@YENDES.COM
FOREST PARK WA 98155
CONTACT
YEN DESIGN, INC.
17191 BOTHELL WAY NE, LAKE
(206)432-1111
ethan@yendes.com
FOREST PARK WA 98155
CONTRACTOR
J C KILLIN GENERAL
543 3RD AVE S, EDMONDS WA
(425)754-4915
JON@JCKILLIN.COM
CONTRACTOR
98020
540 FIR PL, EDMONDS WA
OWNER
ALLISON BUI
98020-4647
•' •
DESCRIPTION
7PERM91111111111
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
ASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
10/13/21
R15307
ITS
1- BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
10/13/21
R15307
PERMITS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
4/23/21
R11876
PER PERMIT
EACH PLUMBING FIXTURE ON ONE
001.000.322.10.000.00
$165.00
$165.00
10/13/21
R15307
TRAP
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$45.00
$45.00
10/13/21
R15307
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$469.00
$469.00
10/13/21
R15307
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$398.65
$398.65
4/23/21
R11876
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
10/13/21
R15307
TOTALS: $1,224.15
$1,224.15
• •
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, October 14, 2021 7:37:10 AM 1 of 2
'RESIDENTIAL
BLDG Permit
of Edmonds PERMIT NUM
EdmondsCity
98020 1 1
. •. •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
INSPECTIONSSchedule
•https://Inspection.MvBuildingPermit.com
COMPLETED RESULT
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
A-1 BUILDING PRECON
B-2 DEMO AMT
VERIFICATION
B-2 FOOTINGS
B-3 PLUMB ROUGH IN
B-4 FRAMING
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
Printed: Thursday, October 14, 2021 7:37:10 AM 2 of 2