Building Permit 2021Type: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED
Parcel No: 27032500109500 Site Address: 21630 98TH AVE W EDMONDS,WA 98020-3923
Subdivision: KELLOGG SUPPLEMENTAL PLAT OF EDMONDS Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $28,500.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: MCCALLUM- FOUNDATION STABILIZATION
Applied: 6/23/2021
Issued:10/14/2021
Final:
Expiration Date: 10/9/2022
Issued by: NED
WA State Contractor L & I #: ADVANFS903DH City of Edmonds Business License #: 602454996-001-0001 1
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
BRIANNA BLIVEN
250 4TH AVE S SUITE 200,
(425)778-8500
BRIANNAB@CGENGINEERING.COM
EDMONDS WA 98020
CONTACT
CG ENGINEERING
250 4TH AVE S 4TH AVE S,
(425)778-8500
brandonl@cgengineering.com
EDMONDS WA 98020
CONTRACTOR
ADVANCED FOUNDATION
22102 SPRUCE DR, MONROE
howard@foundationsupports.com
SUPPORTS LLC
WA 98272
21630 98TH W, EDMONDS WA
OWNER
JOHN MCCALLUM
425.672.1681
98020
ypr
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
7/1/21
R13260
PER PERMIT
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$540.00
$540.00
10/14/21
R15310
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$459.00
$459.00
7/1/21
R13260
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
10/14/21
R15310
TOTALS: $1,045.50
$1,045.50
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, October 14, 2021 12:07:47 PM 1 of 2
'RESIDENTIAL BLDG Permit
C-A -
�1.
I City • • • •
98020 1 1:
. •. •
Ah
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
REQUIRED SPECIAL
FOR
INSPECTIONS
INFORMATION
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND OR NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
SPECIAL INSPECTION REPORTS
FOR
Submit all special inspection reports to the City Building Official on a weekly basis.
NFORMATION
INSPECTIONS
-. •nline
at: https://Inspection.MVBuildingPermit.co
COMPLETED RESULT
SEQID INSPECTION TYPE
INSPECTOR
NOTES
DATE
A-1 BUILDING PRECON
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
B-5 BLDG SPECIAL
INSPECTION
Printed: Thursday, October 14, 2021 12:07:47 PM 2 of 2