Loading...
Building Permit 2021Type: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED Parcel No: 27032500109500 Site Address: 21630 98TH AVE W EDMONDS,WA 98020-3923 Subdivision: KELLOGG SUPPLEMENTAL PLAT OF EDMONDS Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $28,500.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: MCCALLUM- FOUNDATION STABILIZATION Applied: 6/23/2021 Issued:10/14/2021 Final: Expiration Date: 10/9/2022 Issued by: NED WA State Contractor L & I #: ADVANFS903DH City of Edmonds Business License #: 602454996-001-0001 1 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT BRIANNA BLIVEN 250 4TH AVE S SUITE 200, (425)778-8500 BRIANNAB@CGENGINEERING.COM EDMONDS WA 98020 CONTACT CG ENGINEERING 250 4TH AVE S 4TH AVE S, (425)778-8500 brandonl@cgengineering.com EDMONDS WA 98020 CONTRACTOR ADVANCED FOUNDATION 22102 SPRUCE DR, MONROE howard@foundationsupports.com SUPPORTS LLC WA 98272 21630 98TH W, EDMONDS WA OWNER JOHN MCCALLUM 425.672.1681 98020 ypr DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 7/1/21 R13260 PER PERMIT PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $540.00 $540.00 10/14/21 R15310 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $459.00 $459.00 7/1/21 R13260 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 10/14/21 R15310 TOTALS: $1,045.50 $1,045.50 CONDITION TYPE STATUS NOTES Printed: Thursday, October 14, 2021 12:07:47 PM 1 of 2 'RESIDENTIAL BLDG Permit C-A - �1. I City • • • • 98020 1 1: . •. • Ah 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. REQUIRED SPECIAL FOR INSPECTIONS INFORMATION Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND OR NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Special inspections have been called for on this project and are noted on the approved SPECIAL INSPECTION BUILDING FOR construction plans. It is the owner and or contractors responsibility to ensure that reports DIVISION INFORMATION are provided to the City on a weekly basis. SPECIAL INSPECTION REPORTS FOR Submit all special inspection reports to the City Building Official on a weekly basis. NFORMATION INSPECTIONS -. •nline at: https://Inspection.MVBuildingPermit.co COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE A-1 BUILDING PRECON B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" B-5 BLDG SPECIAL INSPECTION Printed: Thursday, October 14, 2021 12:07:47 PM 2 of 2