Building Permit 2021Type: MECHANICAL Subtype: COMMERCIAL MECHANICAL I Status: ISSUED
Parcel No: 00566900400705
Subdivision: 005669
Fire Sprinklers:
Valuation: $0.00
Code Edition: 0
Site Address: 21109 76TH AVE W EDMONDS,WA 98026-7107
Lot: 0
Lot Area: Zoning: BN
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: 7/11- MECHANICAL, RTU & 2 REACH IN FREEZERS
Applied: 10/12/2021
Issued:10/15/2021
Final:
Expiration Date: 4/13/2022
Issued by: NED
WA State Contractor L & I #: COOLSC1805BP City of Edmonds Business License #: 602454996-001-0001 1
IL
ji CONTACTS
NAME TYPE NAME
ADDRESS
PHONE
EMAIL
APPLICANT
BRIAN PRITCHARD
1524 45TH ST E 103, SUMNER
(253)329-0512
BPRITCHARD@COOLSYS.COM
WA 98390
CONTACT
COOLSYS COMM &
IND
1524 45TH ST E 103, SUMNER
(253)329-0512
BPRITCHARD@COOLSYS.COM
WA 98390
COOLSYS COMMER &INDUS
800 E ORANGE THORPE
CONTRACTOR
(253)329-0512
BPRITCHARD@COOLSYS.COM
SOL INC
AVENUE, ANAHEIM CA 92801
OWNER
SOUTHLAND CORP
PO BOX 711, DALLAS TX 75221
11L
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
1 - BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
10/15/21
R15318
PERMITS
BOILER OR COMPRESSOR - 50HP OR
001.000.322.10.000.00
$50.00
$50.00
10/15/21
R15318
LESS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
10/15/21
R15318
PER PERMIT
MECHANICAL PLAN REVIEW FEE
001.000.345.83.000.00
$110.00
$110.00
10/15/21
R15318
TOTALS: $250.00
$250.00
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Friday, October 15, 2021 8:31:14 AM 1 of 2
MECHANICAL
Permit
City of Edmonds PERMIT NUM
Edmonds WA 98020 i
• • • • 1 1
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
' •NS - Schedule •nline at: https://Inspection.MyBuildingPermit.co
COMPLETED RESULT
SEQID
INSPECTION TYPE INSPECTOR NOTES
DATE
X-0 MECH FINAL**
Printed: Friday, October 15, 2021 8:31:14 AM 2 of 2