Building Permit 2021Type: MECHANICAL Subtype: COMMERCIAL MECHANICAL I Status: ISSUED
Parcel No: 00434400700700 Site Address: 201 MAIN ST 201 EDMONDS,WA 98020
Subdivision: 004344, PLN20130064 Lot: 0
Fire Sprinklers: Lot Area: Zoning: BD2
Valuation: $0.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: DUSTED VALLEY -MECHANICAL -TYPE 2 HOOD
Applied: 9/29/2021
Issued:10/15/2021
Final:
Expiration Date: 4/13/2022
Issued by: NED
WA State Contractor L & I #: SPEEWCC101MF City of Edmonds Business License #: 602454996-001-0001 1
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
SCOTT BOYER
12216 CORLISS AVENUE NORTH,
(206)235-0935
SCOTTB@MITHUN.COM
SEATTLE WA 98133
CONTACT
MITHUN
12216 CORLISS AVENUE NORTH,
(206)235-0935
scottb@mithun.com
SEATTLE WA 98133
CONTRACTOR
SPEE WEST CONSTRUCTION
307 BELL STREET, EDMONDS
(206)284-7733
scottb@mithun.com
CO
WA 98020
DUSTED VALLEY-EDMONDS
307 BELL ST, EDMONDS WA
OWNER
2020LLC
98020
10 •' •
DESCRIPTION
71��
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
E FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
10/15/21
R15329
PERMITS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
10/15/21
R15329
PER PERMIT
HOODS TYPE 1 OR 2 OR FUME
001.000.322.10.000.00
$150.00
$150.00
10/15/21
R15329
HOOD INCLUDING DUCTS
TOTALS: $240.00
$240.00
CONDITION TYPE
STATUS
NOTES
Printed: Friday, October 15, 2021 3:45:02 PM 1 of 2
MECHANICAL Permit
• -
PERMIT
City of • • •
Pr
42
www.edmondswa.gov/425.771n77MMML
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
FIRE FINAL INSPECTION
FOR
Request final Fire Department Inspection 425-775-7720.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
provide manufactures installation instructions on site for Building Inspector.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
INSPECTIONS
- Schedule Online
at: https://Inspection.MyBuildingPermit.com
COMPLETED RESULT
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
B-3 GAS PIPING TEST
B-3 MECH ROUGH IN
X-0 MECH FINAL**
Printed: Friday, October 15, 2021 3:45:02 PM 2 of 2