APPROVED COST ESTIMATE-PLN2019-0036 SUNDSTONE 2 LOT SPSite Improvement Bond Quantity Worksheet S15 Web date: 04/03/2015
LN King County
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
.Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600.
206-296-6600 TfY Relay 711
Project Name: SUNDSTONE SO Date: 5/19/2021
Location: 1414 9TH AVE N, EDMONDS Project No.: PLN:2019-0036
Activity No.:
Clearing greater than or equal to 5,000 board feet of timber?
yes x no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
li-wks-sbq-xls (2).xls
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
PERFORMANCE BOND AMOUNT: $52,963.20
INSPECTION FEES: $1,456.49
FUTURE MAINTENANCE BOND AMOUNT. $7,944.48
ENGINEERING DIVISION
APPROVED AS NOTED
6/16/2021
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 6/15/2021
Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/2015
EROSION/SEDIMENTCONTROL,"-
Number,,..
Backfill & compaction -embankment
ESC-1
$ 6.00
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 80.00 _
Each
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 95.00
CY
Ditching
ESC-4
$ 9.00
CY
Excavation -bulk
ESC-5
$ 2.00
CY
Fence, silt
ESC-6
SWDM 5.4.3.1
$ 1.50
LF
152
1;
228
Fence, Temporary (NGP.E)
ESC-7
$ 1.50
LF
650
1:
975
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.80
SY
1000
1
800
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 3.50
SY
Mulch, by hand, straw, 3" deep
ESC-10
SWDM 5.4.2.1
$ 2.50
SY
500
; 1:
1250
Mulch, by machine, straw, 2" deep
ESC-11
SWDM 5.4.2.1
$ 2.00
SY
Piping, temporary, CPP,1-6"
ESC-12
$ 12.00
LF
Piping, temporary, CPPr;8"
ESC-13
$ 14.00
LF
Piping, temporary, CPP,s 12"
ESC-14
$ 18.00
LF
Plastic covering, 6mm thick, sandbagged
ESCA5
SWDM 5.4.2.3
$ 4.00
SY
100
1
400
Rip Rap, machine placed; slopes
ESCA6
WSDOT 9-13.1(2)
$ 45.00
CY
Rock Construction Entrance, 50'x15'x1'
ESC-17
SWDM 5.4.4.1
$ 1,800.00
Each
Rock Construction Entrance, 100'x15'x1'
ESCA8
SWDM 5.4.4.1
$ 3,200.00
Each
1
1 3200
Sediment pond riser assembly
ESCA 9
SWDM 5.4.5.2
$ 2,200.00 ;
Each
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 19.00
LF
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$ 70.00
LF
Seeding, by hand
Sodding, 1" deep, level ' round
ESC-22
SWDM 5.4.2.4
$ 1.00
SY
ESC-23
SWDM 5.4.2.5
$ 8.00
SY
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 10.00
SY
TESC Supervisor
ESC-25
$ 110.00
HR
8
1 880
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 140.00
HR
10
1 1400
WRIT&IN-ITEMS ****4see pane 91P, ,
CB Inlet Protection
$ 150.00
Each
8
1
1200
Street Sweeping
$ 100.00
HR
10
1
1000
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
Page 2 of 9
li-wks-sbq-xls (2).xis
$ 11,333.00
$ 3,399.90
$ 14,732.90
A
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 6/15/2021
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right -of -Way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant.
T, Cost:
Quant.
Cost
Quant.
Cost
GENERAL ITEMS
No.
B,'ackfill & Compaction- embankment
GI - 1
$ _ 6.00
CY
Backfill & Compaction- trench,
GI-2
$ : 9.00
CY
Clear/Remove Brush, by hand
GI - 3
$;; 1.00
SY
100
100.00
Glearing/Grubbing/Tree Removal
GI - 4
$ :10,000.00
Acre
Excavation - bulk
GI-5
$ 2.00
CY
Excavation - Trench
GI - 6
$; 5.00
CY
40
'_ 200.00
Fencing, cedar, 6' high
GI - 7
$, 20.00
LF
Fencing, chain link, vinyl coated, 6' high
GI - 8
$ 20.00
LF
Fencing, chain link, gate, vinyl coated, 20
'GI - 9
$ 1,400.00
Each
Fencing, split rail, 3' high
GI - 10
$ : 15.00
LF
Fill & compact - common barrow
GI - 11
$ ° 25.00
CY
FII & compact -gravel base
GI - 12
$ > 27.00
CY
Fill & compact -screened topsoil
GI - 13
$ 39.00
CY
Gabion, 12" deep, stone filled mesh
GI - 14
$ 65.00
SY
Gabion, 18" deep, stone filled:rnesh
GI - 15
$ 90.00
SY
Gabion, 36" deep, stone filled mesh
GI - 16
$ 150.00
SY
Grading, fine, by hand
GI - 17
$ . 2.50
SY
Grading, fine, with grader
GI - 18
$ : 2.00
SY
Monuments, 3' long
GI - 19
$ 250.00
Each
Sensitive Areas Sign
GI - 20
$ ` 7.00
Each
Sodding, 1" deep, sloped ground
GI - 21
$ 8.00
SY
Surveying, line & grade
GI - 22
$ ` 850.00
Day
1
850.60
Surveying, lot location/lines
GI - 23
$ 1,800.00
Acre
Traffic control crew ( 2 flaggers)
GI - 24
$ : 120.00
HR
8
960.00
Trail, 4" chipped wood
GI - 25
$ 8.00
SY
Trail, 4" crushed cinder
GI - 26
$ : 9.00
SY
Trail, 4" top course
GI - 27
$ 12.00
SY
Wall, retaining, concrete
GI - 28
$ 55.00
SF
Wall, rockery
I GI - 29
$ 15.00
SF
Page 3 of 9 SUBTOTAL
*KCC 27A authorizes only one bond reduction.
li-wks-sbq-xis (2).xls
110.00
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 6/15/2021
Site Improvement Bond Quantity Worksheet
Web dater 04103/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Uhit Price
Unit
Quant, Cost
Quant. Cost
Quant. Cost
ROAD IMPROVEMENT;
No.
AC Grinding, 4' wide machine < 1000sy
RI - 1
$ 30.00
SY
30
900.00
AC Grinding, 4' wide machine 1000-2000
RI - 2
$ 16.00
SY
AC Grinding, 4' wide machine,- 2000sy
RI-3
$' 10.00
SY
AC Removal/Disposal
RI -4
$; 35.00
SY
Barricade, type III ( Permanent )
RI - 6
$ t 56.00
LF
Gurb & Gutter, rolled
RI - 7
$ 17.00
LF
Curb & Gutter, vertical
RI - 8
$ 12.50
LF
Curb and Gutter, demolition and disposal
RI - 9
$ . 18.00
LF
Curb, extruded asphalt
RI - 10
$ 5.50
LF
Curb, extruded concrete
RI -11
$: 7.00
LF
Sawcut, asphalt, 3" depth
RI -12
$. 1.85
LF
35
64.75
Sawcut, concrete, per 1" depth
RI - 13
$ , 3.00
LF
Sealant, asphalt
RI - 14
$ 2.00
LF
Shoulder, AC, ( see AC road unit price)
RI -15
$ -
SY
Shoulder, gravel, 4" thick
RI -16
$ . 15.00
SY
Sidewalk, 4" thick
RI - 17
$ 38.00
SY
Sidewalk, 4" thick, demolition and dispos
RI - 18
$ 32.00
SY
Sidewalk, 5" thick
RI - 19
$ 41.00
SY
Sidewalk, 5" thick, demolition and dispos
RI - 20
$_ 40.00
SY
Sign, handicap
RI - 21
$ - 85.00
Each
Striping, per stall
RI - 22
$ > 7.00
Each
Striping, thermoplastic, ( for crosswalk)
RI - 23
$ 3.00
SF
Striping, 4" reflectorized line -
RI - 24
$ _ 0.50
LF
Page 4 of 9 SUBTOTAL 964.75
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
li-wks-sbq-xis (2).xls Report Date: 6/15/2021
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
✓£ Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant Cost,
Quant. Cost
Quant. F Cost
ROAD SURFACING
No.
4" Rock = 2.5 base & 1.5" to
course 9 1/2" Rock= 8" base & 1.5" top course
Additional 2.5" Crushed Surfacing
RS -1
$ _ 3.60
SY
HMA 1/2" Overlay, 1.5"
RS-2
$ 14.00
SY
RMA 1/2" Overlay 2"
RS - 3
$ , 18.00
SY
30
540.00
RMA Road, 2", 4" rock, First 2500 SY
RS - 4
$ _ 28.00
SY
RMA Road, 2", 4" rock, Qty. over 2500 SY
RS - 5
$ 21.00
SY
14MA Road, 3", 9 1/2" Rock, First 2500 SY
RS - 6
$ 42.00
SY
RMA Road, 3", 9 1/2" Rock, Qty Over 250
RS - 7
$ 35.00
SY
Not Used
RS-8
Rot Used
RS-9
FIMA Road, 6" Depth, First 25(')0 SY
RS - 10
.$ 33.10
SY
HMA Road, 6" Depth, Qty. Over 2500 SY
RS - 11
$ 30.00
SY
RMA 3/4" or 1 ", 4" Depth
RS - 12
$ .: 20.00
SY
Gravel Road, 4" rock, First 2500 SY
RS - 13
$ 15.00
SY
Gravel Road, 4" rock, Qty. over 2500 SY
RS - 14
$ 10.00
SY
PCC Road (Add Under Write-ins w/Desig
RS - 15
$ , 41.00
SY
Thickened Edge
RS - 17
$ 8.60
LF
Page 5 of 9 SUBTOTAL
*KCC 27A authorizes only one bond reduction:
li-wks-sbq-xls (2).xls
540.00
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost ,
Quant Cost
Quarit. Cost
DRAINAGE (CPP =Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same ' rice as solid pipe.
Access Road, RID
D - 1
$ - 21.00
SY
Bollards - fixed
D - 2
$ 240.74
Each
Bollards - removable
D - 3
$ ; 452.34
Each
*(CBs include frame and lid)
CBType I
D-4
$;: 1,500.00
Each
3
4,500.00
3
4,500.00
GB Type IL
D - 5
$, 1,750.00
Each
=
GB Type II, 48" diameter
D - 6
$ ., 2,300.00
Each
for additional depth over 4'
D - 7
$ . 480.00
FT
CB Type 11, 54" diameter
D - 8
$ 2,500.00
Each
for additional depth over 4':
D - 9
$ - 495.00
FT
CB Type II, 60" diameter
D - 10
$; 2,800.00
Each
for additional depth over 4';
D - 11
$; 600.00
FT
CB Type II, 72" diameter
D - 12
$ 3,600.00
Each
for additional depth over 4'-
D - 13
$ : 850.00
FT
Through -curb Inlet Framework (Add)
D- 14
$; 400.00
Each
Cleanout, PVC, 4"
D - 15
$ _ 150.00
Each
Cleanout, PVC, 6"
D - 16
$ 170.00
Each
Cleanout, PVC, 8"
D - 17
$ 200.00
Each
Culvert, PVC, 4"
D - 18
$; 10.00
LF
Culvert, PVC, 6"
D - 19
$ 13.00
LF
54
702.00
Culvert, PVC, 8"
D - 20
$ ` 15.00
LF
Culvert, PVC, 12"
D - 21
$,: 23.00
LF
Culvert, CMP, 8"
D - 22
$ 19.00
LF
Culvert, CMP, 12"
D - 23
$ . 29.00
LF
Culvert, CMP, 15..
D - 24
$ ; 35.00
LF
Culvert, CMP, 18"
D - 25
$ . 41.00
LF
Culvert, CMP, 24"
D - 26
$ 56.00
LF
Culvert, CMP, 30"
D - 27
$ 78.00
LF
Culvert, CMP, 36"
D - 28
$ 130.00
LF
Culvert, CMP, 48"
D - 29
$ 190.00
LF
-
Culvert, CMP, 60"
D - 30
$ - 270;00
LF
Culvert, CMP, 72"
D - 31
$ 350.00
LF
Page 6 of 9 SUBTOTAL
*KCC 27A authorizes only one bond reduction.
li-wks-sbq-xls (2).xls
4,500.00
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 6/15/2021
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
No.
Unit Price
Unit
Quant.
Cost
Quant. `
Cost
Quant.
Cost
Culvert, Concrete, 8"
D - 32
$ . 25.00
LF
Culvert, Concrete, 12"
D - 33
$ 36.00
LF
Culvert, Concrete, 15"
D - 34
$ . 42.00
LF
Culvert, Concrete, 18"
D - 35
$ ; 48.00
LF
Culvert, Concrete, 24"
D - 36
$ 78.00
LF
Culvert, Concrete, 30"
D - 37
$.: 125.00
LF
Culvert, Concrete, 36"
D - 38
$; 150.00
LF
Culvert, Concrete, 42"
D - 39
$ _ 175.00
LF
Culvert, Concrete, 48"
D - 40
$ 205.00
LF
Culvert, CPP, 6"
D - 41
$ = 14.00
LF
Culvert, CPP, 8"
D - 42
$ - 16.00
LF
78
1248
Culvert, CPP, 12"
D - 43
$; 24.00
LF
Culvert, CPP, 15"
D - 44
$ 35.00
LF
Culvert, CPP, 18"
D - 45
$, 41.00
LF
Culvert, CPP, 24"
D - 46
$ ; 56.00
LF
Culvert, CPP, 30"
D - 47
$ _ 78.00
LF
Culvert, CPP, 36"
D - 48
$ 130.00
LF
ditching
D - 49
$ 9.50
CY
Flow Dispersal Trench (1,436 base+)
D - 50
$ 28.00
LF
French Drain (3' depth)
D - 51
$ ` 26.00
LF
deotextile, laid in trench, polypropylene
D - 52
$ , 3.00
SY
Mid -tank Access Riser, 48" dia, 6' deep
D - 54
$ 2,000.00
Each
Pond Overflow Spillway
D - 55
$ 16.00
SY
Restrictor/Oil Separator, 12"
D - 56
$ 1,150.00
Each
Restrictor/Oil Separator, 15" .'-
D - 57
$ 1,350.00
Each
Restrictor/Oil Separator, 18"
D - 58
$ < 1,700.00
Each
Riprap, placed
D - 59
$ 42.00
CY
Tank End Reducer (36" diameter)
D - 60
$ 1,200.00
Each
Trash Rack, 12"
D - 61
$ 350.00
Each
Trash Rack, 15"
D - 62
$ ; 410.00
Each
Trash Rack, 18"
D - 63
$ 480.00
Each
Trash Rack, 21"
D - 64
$ 550.00
Each
Page 7 of 9 SUBTOTAL
*KCC 27A authorizes only one bond reduction.
li-wks-sbq-xls (2).xls
1248
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 6/15/2021
" Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Price
Quant. " Cost
Quant. Cosf
PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders
No.
2'. AC, 2" top course rock & 0 borrow
PL - 1
$ ' 21.00
SY
NA
NA
2" AC, 1.5" top course & 2.51, base cours
PL - 2
$ - 28.00
SY
NA
NA
4' select borrow
PL - 3
$ 5.00
SY
NA
NA
15" top course rock & 2.5" base course
PL - 4
$ . 14.00
SY
NA
NA
UTILITY POLES & STR`EET LIGHTING Utility pole`relocation costs must be accompanied by Franchise Utility's Cost Estimate
L3tility Pole(s) Relocation
UP-1
Lump Sum
*reet Light Poles w/Luminaires
UP-2
$ 7,500.00 Each
WRITE -IN -ITEMS
(Such as detention/water quality vaults.)
No.
Side Sewer - 6" PVC
WI - 1
$ 23.00
LF
46
1058
Driveway Approach - Asphalt `
WI - 2
$ 25.00
SY
65
1625
Level Spreader (50 LF)
WI - 3
$- 2,500.00
EA
1
2,500.00
Culvert 15" D.I. -
WI - 4
$ 38.00
LF
71
2698
Asphalt Sealer
WI-5
$: 2.00
LF
65
130
Asphalt Berm
WI - 6
$, 1.00
LF
17
17
25
25.00
Wl-7
WI-8
WI-9
WI-10
SUBTOTAL 5,528.t)0 2,525.00
SUBTOTAL (SUM ALL PAGES): _ 14,344.75 8,273.00
30% CONTINGENCY & MOBILIZATION: 4,303.43 2,481.90
GRANDTOTAL: 1-8,648.18 10,754.90
COLUMN: B C D
Unit prices updated: 03/02/2015
•KCC 27A authorizes only one bond reduction. Version: 03/02/2015
li-wks-sbq-xls (2).xis Report Date: 6/15/2021
Web °4/03/20,5
Site Improvement Bond Quantity Worksheet
Original bond computations prepared by:
Name: Joseph Smeby Date: 5/19/2021
PE Registration Number': 38835 Tel. #: 425.903.4852
Firm Name: Omega Engineering, Inc
Address: 2707 Wetmore Ave, Everett, WA 98201 Project No: -PLN2019-0036
FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND*. MINIMUM BOND* AMOUNT PUBLIC ROAD & DRAINAGE
AMOUNT REQUIRED FOR RECORDING OR MAINTENANCE/DEFECT BOND*
TEMPORARY OCCUPANCY AT
Stabilization/Erosion Sediment Control (ESC) (A) $ 14,732.9 SUBSTANTIAL COMPLETION'**
ExistingRight-of-Way Improvements INSPECTION FEES:
9 Y P (B) $ ` 18,648.2 $44,136.'X 3.3%
Future Public Right of Way & Drainage Facilities (C) $ _
Private Improvements (D) $ 10,754.9 $1.,456.49
Calculated Quantity Completed
Total Right -of Way an4/or Site Restoration Bond*/** (A+B) $ 33,381.1
(First $7,500 of bond* shall be cash.)
Performance Bond* Amount (A+B+C+D) = TOTAL (T) $ 44,136.10 T x 0.30 $ �
Minimum is $2000. Minimum is $2000.
x 120% (B+C) x
Maintenance/Defect Bond* Total 0.25 = $ 4 gg2z —
PERFORMANCE BOND AMOUNT. $52,963.20 Minimum is $2000.
NAME OF PERSON PREPARING BOND* REDUCTION: Date:
* NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County.
** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
*** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY
Page 9 of 9 Unit prices updated: 03/02/2015
Check out the DDES Web site at www.kingcountv.aoy/permits Version: 03/02/2015
li-wks-sbq-xls (2).xls Report Date: 6/15/2021